6100 N WOODLEY AVE 91436

Certificate Information: 6100 N WOODLEY AVE 91436

Application / Permit
20010-20000-00304
Plan Check / Job No.
B20VN01473
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(12) Manufacturing
Work Description
WHSE/ MAINTENANCE SHOPS & OFFICES NFPA13 THROUGHOUT
Permit Issued
Issued on 9/2/2025
Issuing Office
Valley
Current Status
Issued on 9/2/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/29/2020 APPLICANT
Assigned to Plan Check Engineer 3/5/2020 CHON CHIO KUO
Corrections Issued 4/13/2020 CHON CHIO KUO
Quality Review Completed 4/15/2020 STEVEN KIM
Building Plans Picked Up 4/17/2020 APPLICANT
Disabled Access Plans Picked Up 4/17/2020 APPLICANT
Green Plans Picked Up 4/17/2020 APPLICANT
Applicant returned to address corrections 6/9/2020 CHON CHIO KUO
Applicant returned to address corrections 6/10/2020 CHON CHIO KUO
Applicant returned to address corrections 6/24/2020 CHON CHIO KUO
Applicant returned to address corrections 6/30/2020 CHON CHIO KUO
Applicant returned to address corrections 7/1/2020 CHON CHIO KUO
Applicant returned to address corrections 7/7/2020 CHON CHIO KUO
Applicant returned to address corrections 7/8/2020 CHON CHIO KUO
Applicant returned to address corrections 7/13/2020 CHON CHIO KUO
Applicant returned to address corrections 9/17/2020 CHON CHIO KUO
Applicant returned to address corrections 9/21/2020 CHON CHIO KUO
Applicant returned to address corrections 1/20/2021 CHON CHIO KUO
Applicant returned to address corrections 1/27/2021 CHON CHIO KUO
Applicant returned to address corrections 2/1/2021 CHON CHIO KUO
Plan Check Approved 2/4/2021 CHON CHIO KUO
Issued 9/2/2025 APPLICANT

Permit Application Clearance Information

Green Code Cleared 5/19/2020 AARON COSTA
Metro Rail approval Cleared 6/18/2020 CHON CHIO KUO
Work Adjacent to Public Way Cleared 6/25/2020 LEE GUILBEAUX
Low Impact Development Cleared 7/13/2020 AMMAR ELTAWIL
Hydrant and Access approval Cleared 8/3/2020 MATTHEW CRAIG
"Q" conditions Cleared 8/12/2020 LOUIS ORTEGA
Miscellaneous Cleared 8/12/2020 LOUIS ORTEGA
Prkng lot landscape/Water mgmt Cleared 8/12/2020 LOUIS ORTEGA
ZA Case Cleared 8/12/2020 LOUIS ORTEGA
ZA Case Cleared 8/12/2020 LOUIS ORTEGA
Eng Process Fee Ord 176,300 Cleared 8/20/2020 LEE GUILBEAUX
Highway dedication Cleared 8/20/2020 LEE GUILBEAUX
Permit Cleared 8/20/2020 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 8/20/2020 LEE GUILBEAUX
Sewer availability Cleared 8/20/2020 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 8/20/2020 LEE GUILBEAUX
Public Works-Sewers Cleared 8/20/2020 LEE GUILBEAUX
Miscellaneous Cleared 9/18/2020 MARITZA PRZEKOP
ZI Cleared 9/30/2020 LOUIS ORTEGA
DAS Clearance Cleared 1/4/2021 NORLITO MEDRANO

Contact Information

Architect Kimm,, Alice Young; Lic. No.: C25438 821 TRACTION AVENUE # 107      LOS ANGELES, CA 90013
Contractor Ford E C Inc; Lic. No.: 396212-B 10850 WILSHIRE BLVD 1120      LOS ANGELES, CA 90024
Engineer Islam,, Mohammed Saiful; Lic. No.: S4083 155 N LAKE AVE SUITE 600      PASADENA, CA 91101
Engineer Moore,, Benjamin David; Lic. No.: GE2858 11574 WYANDOTTE ST      NORTH HOLLYWOOD, CA 91605

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Deputy Drilled-In Anchors 7/24/2026   
Deputy Steel/Welding 7/24/2026   
Deputy Steel/Welding 7/24/2026   
Deputy Steel/Welding 7/27/2026   
Deputy Drilled-In Anchors 7/27/2026   

Inspection Request History

Footing/Foundation/Slab 1/21/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/5/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/9/2026 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/9/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/11/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/13/2026 Approved ROBERT DAVIS
Reinforced Concrete Frame 2/26/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 2/27/2026 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 2/27/2026 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 3/10/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 3/11/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/13/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/16/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/17/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/18/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/19/2026 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 3/19/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 3/20/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/23/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/24/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/25/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/26/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/27/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/1/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/2/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/3/2026 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/6/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/7/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/8/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/9/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/10/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/13/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/14/2026 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 4/15/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/16/2026 Approved JOHN KITCKO
Deputy Steel/Welding 4/17/2026 Conditional Approval DEANDRE HOFFMAN
Deputy Steel/Welding 4/20/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/21/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/22/2026 Approved ROBERT DAVIS
Footing/Foundation/Slab 4/22/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/23/2026 Approved ROBERT DAVIS
Reinforced Concrete Frame 4/23/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/24/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/29/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/30/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/1/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/4/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/5/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/6/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/6/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/7/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/7/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/7/2026 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/7/2026 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 5/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/8/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/8/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/11/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/11/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/11/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/11/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/12/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/12/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/13/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/14/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/14/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/14/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/14/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/15/2026 Approved JOHN KITCKO
Deputy Reinf. Concrete 5/15/2026 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/15/2026 Approved JOHN KITCKO
Deputy Steel/Welding 5/15/2026 Approved JOHN KITCKO
Reinforced Concrete Frame 5/15/2026 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 5/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/18/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/18/2026 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 5/18/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/19/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/19/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/20/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 5/20/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/20/2026 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 5/20/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/21/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/21/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/21/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/22/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/22/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/27/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/27/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 5/27/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/28/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/28/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/29/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/29/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/1/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/1/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/1/2026 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 6/1/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/2/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/2/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/2/2026 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 6/2/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/3/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/3/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/3/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/4/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/4/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/4/2026 Conditional Approval ROBERT DAVIS
Green Building Rough 6/4/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 6/4/2026 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 6/4/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/5/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/5/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/5/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/5/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/5/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/8/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/8/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/8/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/9/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/9/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/9/2026 Conditional Approval ROBERT DAVIS
Green Building Rough 6/9/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 6/9/2026 Partial Approval ROBERT DAVIS
Structural Steel Frame 6/9/2026 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 6/9/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/10/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/10/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/10/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/11/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/11/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/11/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/11/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/11/2026 Conditional Approval ROBERT DAVIS
Green Building Rough 6/11/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 6/11/2026 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 6/11/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/12/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/12/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/15/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/16/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/16/2026 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 6/16/2026 Conditional Approval JEFFREY DURAN
Reinforced Concrete Frame 6/16/2026 Partial Approval DEANDRE HOFFMAN
Deputy Drilled-In Anchors 6/17/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/17/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/17/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/18/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/18/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/22/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/22/2026 Conditional Approval ROBERT DAVIS
Green Building Rough 6/22/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 6/22/2026 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 6/22/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/23/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/23/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/23/2026 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 6/23/2026 Partial Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/24/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/24/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/24/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/25/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/25/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/25/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/25/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/25/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/26/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 6/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/26/2026 Approved ROBERT DAVIS
Deputy Steel/Welding 6/26/2026 Conditional Approval ROBERT DAVIS
Green Building Rough 6/26/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 6/26/2026 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 6/26/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/1/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/6/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 7/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/6/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/6/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/7/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 7/7/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/7/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/7/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/7/2026 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 7/7/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/8/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 7/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/8/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/8/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/9/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 7/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/9/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/9/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/10/2026 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 7/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/10/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/10/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/13/2026 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/13/2026 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/14/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/14/2026 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 7/14/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/15/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/15/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/16/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/16/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/17/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/17/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/20/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/21/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/21/2026 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 7/21/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/22/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/22/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/23/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/23/2026 Conditional Approval ROBERT DAVIS