1622-1622 1/2 W 35TH ST 90018

Certificate Information: 1622-1622 1/2 W 35TH ST 90018

Application / Permit
20010-10000-04799
Plan Check / Job No.
B20LA23038
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
(N) 3-STORY DUPLEX WITH (N) ATTACHED GARAGE
Permit Issued
Issued on 5/24/2021
Issuing Office
Metro
Current Status
CofO Issued on 2/14/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/14/2020 APPLICANT
Assigned to Plan Check Engineer 1/14/2021 CRYSTEL MAALOUF
Corrections Issued 1/22/2021 CRYSTEL MAALOUF
Quality Review Completed 2/5/2021 TU HUA
Plan Check Approved 4/22/2021 CRYSTEL MAALOUF
Issued 5/24/2021 APPLICANT
Building Plans Picked Up 5/24/2021 APPLICANT
CofO in Progress 2/2/2022 SABAS ALONSO
Permit Finaled 2/14/2022 DEROLD HAUFF
CofO Issued 2/14/2022 DEROLD HAUFF
Permit Finaled 2/14/2022 DEROLD HAUFF

Permit Application Clearance Information

Hydrant and Access approval Cleared 2/12/2021 MATTHEW CRAIG
Address approval Cleared 2/22/2021 RENZ SORIANO
Permit Cleared 2/25/2021 RENZ SORIANO
Sewer availability Cleared 3/1/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 3/10/2021 RENZ SORIANO
Low Impact Development Cleared 3/30/2021 YVAINNE GALSIM
Roof/Waste drainage to street Cleared 3/31/2021 RENZ SORIANO

Contact Information

Contractor Tre Development Llc; Lic. No.: 1075573-B 2905 S. VERMONT AVE      LOS ANGELES, CA 90007
Engineer Alvarado,, Carlos Humberto; Lic. No.: C19857 745 N WALNUTHAVEN DR      WEST COVINA, CA 91790
Engineer Salto,, Alvaro; Lic. No.: C83859 2543 E NORMAN AVE      WEST COVINA, CA 91791
Geologist Feucht,, Alex Thomas; Lic. No.: GEO4433 2443 EAGLE HARBOR DRIVE      HENDERSON, NV 890527136

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 6/10/2021 Not Ready for Inspection FREDDIE RIVERA
Underground Mechanical 6/10/2021 Not Ready for Inspection FREDDIE RIVERA
METHANE-Subgrade 6/18/2021 Corrections Issued DAVID FEILER
Underground Mechanical 6/18/2021 Not Ready for Inspection DAVID FEILER
METHANE-Rough 6/21/2021 Not Ready for Inspection FREDDIE RIVERA
METHANE-Subgrade 6/21/2021 Approved FREDDIE RIVERA
PLUMBING-Rough 6/21/2021 Partial Approval FREDDIE RIVERA
Underground Mechanical 6/21/2021 Not Ready for Inspection FREDDIE RIVERA
METHANE-Rough 6/22/2021 Off-Hour Fees Due
Underground Mechanical 6/22/2021 Off-Hour Fees Due
Deputy Drilled-In Anchors 6/29/2021 Approved RONALD KIDWELL
Excavation/Setback/Form/Re-Bar 6/29/2021 Not Ready for Inspection JOAQUIN GREENOUGH
Footing/Foundation/Slab 6/29/2021 Not Ready for Inspection JOAQUIN GREENOUGH
METHANE-Barrier 6/29/2021 Corrections Issued JOAQUIN GREENOUGH
Underground Mechanical 6/29/2021 Partial Approval JOAQUIN GREENOUGH
Excavation/Setback/Form/Re-Bar 6/30/2021 Approved JOAQUIN GREENOUGH
Underground Mechanical 6/30/2021 Partial Approval JOAQUIN GREENOUGH
BUILDING-Rough-Frame 7/14/2021 Partial Approval SABAS ALONSO
Deputy Wood Construction 7/14/2021 No Access for Inspection HORACE FULTZ
Deputy Wood Construction 7/20/2021 No Access for Inspection ELMER BLAND
Floor/Roof Diaphrgm/Shear Wall 7/20/2021 Approved DAVID FEILER
Deputy Wood Construction 8/16/2021 Conditional Approval SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 8/19/2021 Not Ready for Inspection SABAS ALONSO
Wood Frame 8/19/2021 Not Ready for Inspection SABAS ALONSO
ELECTRICAL-Rough 8/20/2021 Approved SABAS ALONSO
HVAC-Rough 8/20/2021 Approved SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 9/7/2021 Approved SABAS ALONSO
METHANE-Rough 9/7/2021 Approved SABAS ALONSO
PLUMBING-Rough 9/7/2021 Corrections Issued SABAS ALONSO
Wood Frame 9/7/2021 Not Ready for Inspection SABAS ALONSO
BUILDING-Rough-Frame 9/8/2021 Conditional Approval SABAS ALONSO
Green Building Rough 9/8/2021 Approved SABAS ALONSO
PLUMBING-Rough 9/8/2021 Approved SABAS ALONSO
Verify Sprinkler Sign Off 9/8/2021 Not Ready for Inspection SABAS ALONSO
Insulation 9/13/2021 Not Ready for Inspection SABAS ALONSO
Insulation 9/15/2021 Not Ready for Inspection SABAS ALONSO
Verify Sprinkler Sign Off 9/15/2021 Approved SABAS ALONSO
Insulation 9/17/2021 Corrections Issued HORACE FULTZ
Interior/Exterior Lathing 9/17/2021 Not Ready for Inspection HORACE FULTZ
Insulation 9/21/2021 Approved SABAS ALONSO
Interior/Exterior Lathing 9/21/2021 Partial Approval SABAS ALONSO
Drywall Nailing 9/28/2021 Approved SABAS ALONSO
Interior/Exterior Lathing 9/28/2021 Not Ready for Inspection SABAS ALONSO
Interior/Exterior Lathing 10/14/2021 Approved SABAS ALONSO
Sewer 11/1/2021 Approved SABAS ALONSO
Underground Mechanical 11/1/2021 Approved SABAS ALONSO
ELECTRICAL-Final 12/3/2021 Corrections Issued SABAS ALONSO
PLUMBING-Final 12/3/2021 Not Ready for Inspection SABAS ALONSO
Service/Power Release 12/3/2021 Approved SABAS ALONSO
ELECTRICAL-Final 12/9/2021 Approved SABAS ALONSO
Final 12/9/2021 Corrections Issued SABAS ALONSO
Gas Test 12/9/2021 Corrections Issued SABAS ALONSO
Green Building Final 12/9/2021 Approved SABAS ALONSO
HVAC-Final 12/9/2021 Approved SABAS ALONSO
PLUMBING-Final 12/9/2021 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 12/9/2021 SGSOV Approved SABAS ALONSO
Smoke Detectors 12/9/2021 Approved SABAS ALONSO
BUILDING-Rough-Frame 2/2/2022 Approved SABAS ALONSO
Final 2/2/2022 OK to Issue CofO SABAS ALONSO
Footing/Foundation/Slab 2/2/2022 Approved SABAS ALONSO
METHANE-Barrier 2/2/2022 Approved SABAS ALONSO