|
Pre-Inspection
|
2/28/2022
|
Approved
|
DAVID TSAU
|
|
Deputy Drilled-In Anchors
|
5/9/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
5/18/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/24/2022
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/31/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/7/2022
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
9/22/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
9/22/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Subgrade
|
9/22/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
10/18/2022
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
11/14/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
11/14/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Subgrade
|
11/14/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/16/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
11/23/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
11/23/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
11/23/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
11/23/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Subgrade
|
11/23/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
11/28/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
11/29/2022
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
11/29/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
11/29/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Subgrade
|
11/29/2022
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
11/29/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/1/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/6/2022
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
12/6/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
12/6/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
12/6/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/7/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
12/7/2022
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
12/9/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
12/9/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
12/9/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
12/10/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
12/12/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
12/13/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
12/14/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/14/2022
|
Approved
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
12/16/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
12/20/2022
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
12/20/2022
|
Conditional Approval
|
AMANUEL BERHE
|
|
Footing/Foundation/Slab
|
12/20/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
12/20/2022
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Drilled-In Anchors
|
12/21/2022
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
12/21/2022
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
12/23/2022
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
12/23/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
12/27/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
12/27/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/28/2022
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
12/28/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/30/2022
|
Conditional Approval
|
AMANUEL BERHE
|
|
Footing/Foundation/Slab
|
1/13/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
1/13/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
1/17/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
1/17/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
1/17/2023
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
1/18/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
1/18/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
METHANE-Rough
|
1/18/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
1/19/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
1/19/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
1/19/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
1/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
1/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
1/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
1/23/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
1/23/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
1/23/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
1/24/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
1/24/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Masonry
|
1/24/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Drilled-In Anchors
|
1/25/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
1/25/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Masonry
|
1/25/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Drilled-In Anchors
|
1/26/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
1/26/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
1/26/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Drilled-In Anchors
|
1/27/2023
|
Approved
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
1/27/2023
|
Approved
|
AMANUEL BERHE
|
|
Deputy Reinf. Masonry
|
1/27/2023
|
Approved
|
AMANUEL BERHE
|
|
Masonry Wall/Backfill
|
1/27/2023
|
Approved
|
AMANUEL BERHE
|
|
Wood Frame
|
2/1/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Wood Frame
|
2/8/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
2/9/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
2/9/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
2/10/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
2/10/2023
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/15/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
METHANE-Barrier
|
2/17/2023
|
Approved
|
AMANUEL BERHE
|
|
METHANE-Rough
|
2/17/2023
|
Approved
|
AMANUEL BERHE
|
|
Footing/Foundation/Slab
|
2/22/2023
|
Partial Inspection
|
AMANUEL BERHE
|
|
Reinforced Concrete Frame
|
2/23/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
3/13/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
3/23/2023
|
Approved
|
AMANUEL BERHE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
4/12/2023
|
Approved
|
JOEY BUCHANAN
|
|
Wood Frame
|
4/12/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
4/21/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
5/2/2023
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/10/2023
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
5/10/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
5/11/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Green Building Rough
|
5/11/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/12/2023
|
Approved
|
JOEY BUCHANAN
|
|
Piling/Pier/Caisson
|
5/12/2023
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
5/12/2023
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
5/12/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Structural Steel Frame
|
5/12/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
5/24/2023
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/24/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/8/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
6/8/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/9/2023
|
Approved
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
6/9/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
6/13/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Wood Frame
|
6/13/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
6/15/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/28/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
6/29/2023
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2023
|
Partial Approval
|
DAVID TSAU
|
|
Drywall Nailing
|
7/14/2023
|
Partial Approval
|
DAVID TSAU
|
|
Drywall Nailing
|
7/19/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
7/27/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
7/31/2023
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/31/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/4/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
8/8/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/8/2023
|
Approved
|
JOEY BUCHANAN
|
|
Insulation
|
8/10/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
8/14/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
8/15/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
8/16/2023
|
Approved
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
8/16/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/16/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Insulation
|
8/18/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/24/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
8/29/2023
|
Approved
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
8/30/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/30/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
9/8/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Wood Frame
|
9/12/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/14/2023
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
9/14/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
9/22/2023
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/22/2023
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
10/5/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/19/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
10/30/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
11/9/2023
|
Approved
|
DARRYL ARNOLD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2023
|
Approved
|
DARRYL ARNOLD
|
|
Light Gage Steel Frame
|
11/16/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
11/21/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
11/28/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
12/15/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
12/29/2023
|
Partial Inspection
|
AMANUEL BERHE
|
|
Insulation
|
12/29/2023
|
Partial Inspection
|
AMANUEL BERHE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/3/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
1/16/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
1/24/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
2/16/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
2/16/2024
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
2/20/2024
|
Partial Inspection
|
AMANUEL BERHE
|
|
Drywall Nailing
|
2/22/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
2/22/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
2/26/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
2/28/2024
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
2/29/2024
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
3/4/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
3/21/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
3/26/2024
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
3/27/2024
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
3/27/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
3/27/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
3/28/2024
|
Approved
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
3/29/2024
|
Approved
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
4/1/2024
|
Approved
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
4/2/2024
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Steel/Welding
|
4/3/2024
|
Approved
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
4/4/2024
|
Approved
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
4/5/2024
|
Approved
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
4/8/2024
|
Approved
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
4/9/2024
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
4/10/2024
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
4/11/2024
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
4/12/2024
|
Approved
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
4/15/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
4/17/2024
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
4/19/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
4/30/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
5/10/2024
|
Partial Approval
|
JOEY BUCHANAN
|
|
T-Bar Ceiling
|
5/10/2024
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
7/26/2024
|
Partial Inspection
|
DAVID TSAU
|
|
Footing/Foundation/Slab
|
7/26/2024
|
Partial Inspection
|
DAVID TSAU
|
|
Green Building Final
|
7/26/2024
|
Approved
|
DAVID TSAU
|
|
SGSOV-Seismic Gas S/O Valve
|
7/26/2024
|
SGSOV Not Ready
|
DAVID TSAU
|
|
Smoke Detectors
|
7/26/2024
|
Approved
|
DAVID TSAU
|
|
Special/Order Compliance
|
9/30/2024
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
1/22/2025
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
3/11/2025
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
5/12/2025
|
OK to Issue CofO
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
5/12/2025
|
Approved
|
JOEY BUCHANAN
|
|
SGSOV-Seismic Gas S/O Valve
|
5/12/2025
|
SGSOV Approved
|
JOEY BUCHANAN
|