|
Deputy Steel/Welding
|
2/16/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Piling/Pier/Caisson
|
2/16/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
2/16/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
2/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
2/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
2/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/7/2023
|
Conditional Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
3/7/2023
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Piling/Pier/Caisson
|
4/20/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/26/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/26/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/2/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Piling/Pier/Caisson
|
5/2/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
5/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
5/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
5/30/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/30/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Piling/Pier/Caisson
|
5/30/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Pre-Stress Concrete
|
6/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
6/7/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
6/16/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/16/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Grading
|
6/26/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Piling/Pier/Caisson
|
7/18/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
7/21/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/28/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/3/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Deputy Grading
|
8/8/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/8/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/8/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
8/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Grading
|
8/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/21/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
8/22/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/22/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/23/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/24/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/28/2023
|
Conditional Approval
|
MARTIN TAVITIAN
|
|
Deputy Shotcrete
|
8/28/2023
|
Conditional Approval
|
MARTIN TAVITIAN
|
|
Deputy Grading
|
9/5/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/6/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
9/6/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/14/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
10/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/5/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
10/31/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
11/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/16/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/26/2023
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/8/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/10/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
1/11/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
1/11/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/12/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Other (see comments)
|
1/19/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/30/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/31/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/9/2024
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
2/9/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
3/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
3/22/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
3/28/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
3/28/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
4/11/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
4/12/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/17/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
6/21/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
6/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
6/25/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
6/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
7/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
7/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/22/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Wood Construction
|
8/1/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
8/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/5/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
8/5/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Shotcrete
|
8/6/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
8/6/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Wood Frame
|
8/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
8/8/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
8/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
8/12/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wall Anchors
|
8/12/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
8/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/20/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
8/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
8/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/28/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
8/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
9/10/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
9/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
9/12/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
9/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
9/25/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
9/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
9/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
10/1/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
10/3/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Insulation
|
10/3/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
10/8/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
10/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
10/11/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Deputy Wood Construction
|
10/16/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
10/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
10/21/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Insulation
|
10/22/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/22/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
10/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
10/28/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
10/28/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
10/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
11/5/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
11/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/6/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Wood Frame
|
11/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/20/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/20/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
11/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
12/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
12/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
12/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
12/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/10/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
12/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
12/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
12/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
12/19/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
12/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
12/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
12/20/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
12/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
12/26/2024
|
No Access for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/26/2024
|
No Access for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
12/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
1/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
1/6/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
1/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
1/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/14/2025
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Wood Frame
|
1/16/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
1/17/2025
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Wood Frame
|
1/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
1/22/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/22/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/22/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
1/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/24/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/24/2025
|
Corrections Issued
|
JEFFREY FULTON
|
|
Insulation
|
1/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
1/28/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/28/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
1/29/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
1/30/2025
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
1/30/2025
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
1/30/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
1/31/2025
|
Corrections Issued
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
2/3/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/3/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/4/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/4/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
2/4/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/6/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
2/7/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/7/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
2/11/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
2/11/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/11/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
2/12/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/13/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/13/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/14/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
2/14/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
2/19/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/19/2025
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
2/20/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/21/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
2/25/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/28/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/5/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
3/5/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/12/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
3/12/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/14/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
3/14/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/19/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
3/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
3/25/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/2/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
4/8/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
4/8/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
4/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/16/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
4/16/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
4/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
4/23/2025
|
Corrections Issued
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
4/24/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/28/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
5/1/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/1/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/2/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/13/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
5/22/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/30/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/2/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
6/12/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
7/7/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/1/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
8/5/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Final
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
8/13/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
8/25/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/25/2025
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
8/25/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
8/25/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/25/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/25/2025
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
8/25/2025
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
8/25/2025
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/25/2025
|
Approved
|
JAMES POWERS
|
|
Special/Order Compliance
|
8/28/2025
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
9/17/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
9/17/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
9/24/2025
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Green Building Final
|
9/24/2025
|
Approved
|
ERNESTO CORRAL
|
|
Final
|
10/28/2025
|
Conditional Approval
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
11/4/2025
|
Corrections Issued
|
JEFFREY FULTON
|