549 S HARVARD BLVD 90020

Certificate Information: 549 S HARVARD BLVD 90020

Application / Permit
20010-10000-04305
Plan Check / Job No.
B20LA21053
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 7 STORY 150 UNITS (15 ELI = 10%) MIXED USE AFFORDABLE HOUSING APARTMENT TO INCLUDE 5 STORY TYPE IIIA APARTMENT OVER 2 STORY TYPE IA RESIDENTIAL / PARKING / RETAIL OVER 2 LEVEL SUBTERRANEAN PARKING, TIER 3 TOC WITH ADDITIONAL INCENTIVES.
Permit Issued
Issued on 5/30/2023
Issuing Office
Metro
Current Status
Issued on 5/30/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 6/6/2022 VU NGUYEN
Issued 5/30/2023 APPLICANT
TCO Issued (Expire Date: 09-29-2026) 4/2/2026 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 8/20/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 8/20/2021 RENZ SORIANO
Highway dedication Cleared 9/13/2021 RENZ SORIANO
Building over 36-ft Cleared 9/21/2021 CALOSHA APPROVED
Construction near power lines Cleared 10/18/2021 RIDWAN HARDY
Permit Cleared 10/28/2021 CELINA MORENO
Hydrant and Access approval Cleared 12/17/2021 MATTHEW CRAIG
Density Bonus 12.22.A.31 Cleared 2/9/2022 NICHOLAS KAWAZOE
Food Service Establishment Cleared 2/25/2022 PAWAN VERMA
Low Impact Development Cleared 3/22/2022 ANDRES COVARRUBIAS
Sewer availability Cleared 3/24/2022 JEANETTE VONG
Roof/Waste drainage to street Cleared 3/25/2022 JEANETTE VONG
Work Adjacent to Public Way Cleared 3/25/2022 ARMEN SARKISIAN
Fire Marshal Fire Life Safety Cleared 4/12/2022 MENOA AGHAJANI
Green Code Cleared 4/21/2022 AARON COSTA
Trees in Parkway Cleared 6/1/2022 ADALBERTO VERA
CPC Cleared 6/2/2022 RUBEN VASQUEZ
Comm Cor/Mini-Mall Cleared 6/2/2022 RUBEN VASQUEZ
Comm Cor/Mini-Mall Cleared 6/2/2022 RUBEN VASQUEZ
Comm Cor/Mini-Mall Cleared 6/2/2022 RUBEN VASQUEZ
Frnt yard landscape/Water mgmt Cleared 6/2/2022 RUBEN VASQUEZ
Miscellaneous Cleared 6/2/2022 RUBEN VASQUEZ
Miscellaneous Cleared 6/2/2022 RUBEN VASQUEZ
Miscellaneous Cleared 6/2/2022 RUBEN VASQUEZ
Miscellaneous Cleared 6/2/2022 RUBEN VASQUEZ
Miscellaneous Cleared 6/2/2022 RUBEN VASQUEZ
Miscellaneous Cleared 6/2/2022 RUBEN VASQUEZ
Opn space landscape/Water mgmt Cleared 6/2/2022 RUBEN VASQUEZ
Site Plan review Cleared 6/2/2022 RUBEN VASQUEZ
Historic Resource Verification Cleared 6/3/2022 GRACIELA ACOSTA
Miscellaneous Cleared 6/3/2022 GRACIELA ACOSTA
Redevelopment Project Area Cleared 6/3/2022 GRACIELA ACOSTA
DAS Clearance Cleared 6/6/2022 VU NGUYEN
Bicycle Parking Cleared 10/21/2022 JEREMY CHOK

Contact Information

Architect Chang,, Winston L; Lic. No.: C25009 1476 VIA CORONEL      PALOS VERDES ESTATES, CA 90274
Contractor Wilshire Construction L P; Lic. No.: 1048091-B 3470 WILSHIRE STE 500      LOS ANGELES, CA 90010
Engineer Funk,, David Lyle; Lic. No.: S5421 319 MAIN STREET      EL SEGUNDO, CA 90245
Engineer Tang,, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/8/2023 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/29/2023 Partial Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 7/10/2023 Conditional Approval TED RIES
Piling/Pier/Caisson 7/18/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 8/15/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 9/7/2023 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/8/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/29/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/2/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 10/5/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/5/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/5/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/10/2023 Partial Approval TED RIES
Reinforced Concrete Frame 10/11/2023 Partial Approval TED RIES
Deputy Shotcrete 10/12/2023 Conditional Approval GREGORY POMISH
Green Building Rough 10/12/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 10/12/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/12/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/17/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 10/19/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 10/19/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/19/2023 Not Ready for Inspection GREGORY POMISH
Green Building Rough 10/24/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/24/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/24/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 10/26/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 10/31/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 10/31/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 10/31/2023 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 11/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/20/2023 Conditional Approval NICK DANERI
Green Building Rough 11/20/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 11/20/2023 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 11/20/2023 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 11/21/2023 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/21/2023 Partial Approval NICK DANERI
Green Building Rough 11/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/30/2023 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/1/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/1/2023 Partial Approval EDWIN GREGORYONA
Pre-Inspection 12/1/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/4/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/4/2023 Conditional Approval GREGORY POMISH
Green Building Rough 12/4/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 12/4/2023 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 12/4/2023 Not Ready for Inspection GREGORY POMISH
Pre-Inspection 12/5/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 3/21/2024 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 3/21/2024 Not Ready for Inspection LARRY ARNICK
Green Building Rough 3/21/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/21/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/21/2024 Not Ready for Inspection JAMES POWERS
Green Building Rough 4/4/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Masonry Frame 4/4/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/4/2024 Not Ready for Inspection JEFFREY FULTON
Masonry Wall/Backfill 4/5/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/8/2024 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/18/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/18/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/18/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/18/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/25/2024 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/25/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 4/25/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/25/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/25/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/1/2024 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 5/1/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/1/2024 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 5/1/2024 Partial Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/1/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/1/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/2/2024 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/2/2024 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 5/2/2024 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/2/2024 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 5/2/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/7/2024 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/7/2024 Conditional Approval NICK DANERI
Deputy Shotcrete 5/7/2024 Conditional Approval NICK DANERI
Green Building Rough 5/7/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/7/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/7/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 5/8/2024 Conditional Approval DAVID BURKHEAD
Pre-Inspection 5/9/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Masonry Frame 5/9/2024 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 6/10/2024 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/10/2024 Partial Approval DAVID BURKHEAD
Green Building Rough 6/11/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 6/11/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 6/11/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 6/12/2024 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/12/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/13/2024 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/13/2024 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/20/2024 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/24/2024 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 6/24/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 6/24/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/24/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 6/24/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 6/26/2024 Conditional Approval JEFFREY FULTON
Reinforced Concrete Frame 6/26/2024 Partial Inspection JEFFREY FULTON
Reinforced Masonry Frame 6/26/2024 Partial Inspection JEFFREY FULTON
Deputy Shotcrete 6/27/2024 Conditional Approval LARRY ARNICK
Green Building Rough 6/27/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 6/27/2024 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 6/27/2024 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 6/28/2024 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 6/28/2024 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 6/28/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/16/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/16/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 7/16/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/16/2024 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 8/2/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/5/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/5/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/5/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/5/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/6/2024 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 8/6/2024 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/7/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/7/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/7/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/7/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/15/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/15/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/15/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/15/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 8/20/2024 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 8/21/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/21/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/21/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 9/16/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 9/16/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/16/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 9/16/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 9/23/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/23/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 9/23/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 10/3/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/3/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/3/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/17/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/18/2024 Partial Approval DAVID BURKHEAD
Green Building Rough 10/18/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/18/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/23/2024 Partial Approval DAVID BURKHEAD
Wood Frame 10/30/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 11/1/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 11/1/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/1/2024 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/5/2024 Partial Approval DAVID BURKHEAD
Wood Frame 11/8/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Steel/Welding 11/12/2024 Conditional Approval DAVID BURKHEAD
Wood Frame 11/12/2024 Partial Inspection DAVID BURKHEAD
Insulation 11/13/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/15/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/20/2024 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 11/22/2024 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/22/2024 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/2/2024 Partial Inspection DAVID BURKHEAD
Insulation 12/6/2024 Partial Approval DAVID BURKHEAD
Wood Frame 12/11/2024 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/17/2024 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 12/17/2024 Conditional Approval DAVID BURKHEAD
Wood Frame 12/17/2024 Partial Approval DAVID BURKHEAD
Insulation 12/19/2024 Partial Approval LUIS CCAMACHO
Floor/Roof Diaphrgm/Shear Wall 12/20/2024 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 12/23/2024 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/23/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/30/2024 Partial Approval NICK DANERI
Insulation 1/9/2025 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/13/2025 Conditional Approval CHRISTOPHER BLACKWOOD
Floor/Roof Diaphrgm/Shear Wall 1/13/2025 Partial Approval CHRISTOPHER BLACKWOOD
Special/Order Compliance 1/16/2025 Partial Inspection LUIS CCAMACHO
Floor/Roof Diaphrgm/Shear Wall 1/22/2025 Partial Approval DAVID BURKHEAD
Wood Frame 1/24/2025 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 1/28/2025 Conditional Approval DAVID BURKHEAD
Insulation 1/28/2025 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/29/2025 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/30/2025 Partial Approval DAVID BURKHEAD
Wood Frame 2/3/2025 Partial Approval DAVID BURKHEAD
Wood Frame 2/5/2025 Partial Approval LARRY ARNICK
Deputy Wood Construction 2/14/2025 Approved DAVID BURKHEAD
Wood Frame 2/14/2025 Partial Approval DAVID BURKHEAD
Insulation 2/18/2025 Partial Approval LUIS CCAMACHO
Insulation 2/19/2025 Partial Approval LUIS CCAMACHO
Floor/Roof Diaphrgm/Shear Wall 2/20/2025 Partial Approval TIMOTHY POWELL
Floor/Roof Diaphrgm/Shear Wall 2/21/2025 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/24/2025 Partial Approval TIMOTHY POWELL
Insulation 2/27/2025 Permit Expired DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/3/2025 Partial Approval EDWIN GREGORYONA
Insulation 3/5/2025 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/7/2025 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/10/2025 Partial Approval TIMOTHY POWELL
Insulation 3/11/2025 Partial Approval DAVID BURKHEAD
Insulation 3/13/2025 Partial Approval DAVID BURKHEAD
Insulation 3/14/2025 Partial Approval DAVID BURKHEAD
Insulation 3/18/2025 Partial Approval DAVID BURKHEAD
Insulation 3/19/2025 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/21/2025 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/24/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/25/2025 Conditional Approval DAVID BURKHEAD
Insulation 3/25/2025 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/26/2025 Partial Approval DAVID BURKHEAD
Insulation 3/27/2025 Partial Approval DAVID BURKHEAD
Wall Anchors 3/28/2025 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 4/2/2025 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 4/7/2025 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/16/2025 Not Ready for Inspection EDWIN GREGORYONA
Insulation 4/18/2025 Partial Approval EDWIN GREGORYONA
Pre-Inspection 4/30/2025 Partial Inspection DAVID BURKHEAD
Interior/Exterior Lathing 5/1/2025 Partial Approval DAVID BURKHEAD
Insulation 5/2/2025 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/6/2025 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/7/2025 Corrections Issued DAVID BURKHEAD
Wood Frame 5/8/2025 Partial Approval DAVID BURKHEAD
Insulation 5/9/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 5/12/2025 Partial Inspection DAVID BURKHEAD
Wood Frame 5/13/2025 Partial Inspection DAVID BURKHEAD
Insulation 5/14/2025 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 5/16/2025 Partial Approval EDWIN GREGORYONA
Insulation 5/19/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/20/2025 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/23/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/27/2025 Partial Approval LARRY ARNICK
Insulation 5/28/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/29/2025 Partial Approval DAVID BURKHEAD
Insulation 6/2/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/3/2025 Partial Approval LUIS CCAMACHO
Drywall Nailing 6/5/2025 Partial Approval DAVID BURKHEAD
Insulation 6/6/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/9/2025 Partial Approval DAVID BURKHEAD
Wood Frame 6/11/2025 Partial Inspection DAVID BURKHEAD
Insulation 6/12/2025 Partial Approval DAVID BURKHEAD
Wood Frame 6/16/2025 Partial Approval EDWIN GREGORYONA
Pre-Inspection 6/17/2025 Not Ready for Inspection LARRY ARNICK
Insulation 6/18/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/20/2025 Partial Approval EDWIN GREGORYONA
Insulation 6/23/2025 Partial Approval DAVID BURKHEAD
Insulation 6/24/2025 Not Ready for Inspection DAVID BURKHEAD
Insulation 6/25/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/27/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/1/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/10/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 7/11/2025 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/15/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/18/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 7/22/2025 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/23/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 7/24/2025 Approved DAVID BURKHEAD
Insulation 7/25/2025 Not Ready for Inspection JAMES POWERS
Insulation 7/28/2025 Partial Approval DAVID BURKHEAD
Wood Frame 7/29/2025 Partial Approval EDWIN GREGORYONA
Insulation 7/30/2025 Partial Approval DAVID BURKHEAD
Insulation 8/1/2025 Partial Approval DAVID BURKHEAD
Insulation 8/14/2025 Partial Approval DAVID BURKHEAD
Wood Frame 8/15/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 8/18/2025 Partial Approval JOEY BUCHANAN
Pre-Inspection 8/20/2025 Partial Approval EDWIN GREGORYONA
Insulation 8/21/2025 Partial Approval LARRY ARNICK
Pre-Inspection 8/21/2025 Partial Approval LARRY ARNICK
Insulation 8/22/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 8/25/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 8/26/2025 Partial Approval DAVID BURKHEAD
Insulation 8/28/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/4/2025 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/5/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 9/8/2025 Partial Approval LARRY ARNICK
Pre-Inspection 9/10/2025 Partial Approval LARRY ARNICK
Drywall Nailing 9/23/2025 Partial Inspection JEFFREY FULTON
Pre-Inspection 10/8/2025 Approved DAVID BURKHEAD
Drywall Nailing 10/17/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/20/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 10/24/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/10/2025 Partial Approval DAVID BURKHEAD
Structural Steel Frame 11/13/2025 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 11/14/2025 Approved DAVID BURKHEAD
Light Gage Steel Frame 11/18/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/2/2025 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/3/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 2/12/2026 Partial Inspection DAVID BURKHEAD
Pre-Inspection 3/19/2026 Partial Inspection DAVID BURKHEAD
Pre-Inspection 3/23/2026 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 3/25/2026 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 3/26/2026 Corrections Issued DAVID BURKHEAD
Final 3/31/2026 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 3/31/2026 Approved DAVID BURKHEAD
Green Building Final 3/31/2026 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 3/31/2026 Approved DAVID BURKHEAD
Reinforced Concrete Frame 3/31/2026 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 3/31/2026 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 3/31/2026 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 3/31/2026 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 3/31/2026 Approved DAVID BURKHEAD
Special/Order Compliance 4/1/2026 Partial Inspection DAVID BURKHEAD