|
Pre-Inspection
|
6/8/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
7/10/2023
|
Conditional Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
7/18/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
8/15/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
9/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/8/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
9/29/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/2/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
10/5/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
10/5/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
10/5/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
10/10/2023
|
Partial Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
10/11/2023
|
Partial Approval
|
TED RIES
|
|
Deputy Shotcrete
|
10/12/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
10/12/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/12/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
10/12/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
10/19/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/19/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
10/19/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
10/24/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
10/24/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
10/24/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
10/31/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
10/31/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
10/31/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Shotcrete
|
11/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/20/2023
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
11/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
11/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/21/2023
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
11/21/2023
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
11/30/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/30/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/30/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/1/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Shotcrete
|
12/1/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
12/1/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
12/4/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
12/4/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
12/4/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/4/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
12/4/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
12/5/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
3/21/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
3/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
3/21/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/21/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
4/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
4/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
4/5/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
4/8/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/18/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
4/18/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
4/18/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
4/18/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
4/25/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
4/25/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
4/25/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/25/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/25/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
5/1/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
5/1/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
5/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/1/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
5/1/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
5/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
5/2/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
5/2/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
5/2/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/2/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
5/2/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
5/7/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
5/7/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
5/7/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
5/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/8/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/9/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
5/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
6/10/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/10/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
6/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
6/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
6/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/13/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/13/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/24/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/24/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
6/24/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/24/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
6/24/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/26/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
6/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
6/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Shotcrete
|
6/27/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
6/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
6/27/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
6/28/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/28/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
6/28/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
7/16/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
7/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
7/16/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/2/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/5/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
8/5/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/5/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/5/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/6/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
8/7/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
8/7/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/7/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/7/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/15/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
8/15/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/15/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/15/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/20/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
8/21/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
8/21/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
8/21/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
9/16/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
9/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
9/16/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
9/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
9/23/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
9/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
9/23/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
10/3/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
10/3/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
10/3/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
10/17/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
10/18/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
10/18/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
10/18/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
10/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
10/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
11/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
11/1/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
11/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/5/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
11/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
11/12/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
11/12/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
11/13/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
11/22/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/2/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
12/6/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
12/11/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
12/17/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
12/17/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
12/17/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
12/19/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
12/23/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/30/2024
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
1/9/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/13/2025
|
Conditional Approval
|
CHRISTOPHER BLACKWOOD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/13/2025
|
Partial Approval
|
CHRISTOPHER BLACKWOOD
|
|
Special/Order Compliance
|
1/16/2025
|
Partial Inspection
|
LUIS CCAMACHO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
1/24/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/28/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Insulation
|
1/28/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/29/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/5/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
2/14/2025
|
Approved
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
2/18/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Insulation
|
2/19/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/20/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/21/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/24/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Insulation
|
2/27/2025
|
Permit Expired
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/3/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
3/5/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/10/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Insulation
|
3/11/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/13/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/18/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/19/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/21/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
3/25/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/25/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/26/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/27/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wall Anchors
|
3/28/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
4/2/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
4/7/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
4/16/2025
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Insulation
|
4/18/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
4/30/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
5/1/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
5/2/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
5/6/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/7/2025
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Wood Frame
|
5/8/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
5/9/2025
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/12/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
5/13/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
5/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
5/16/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
5/19/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/20/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/23/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/27/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/28/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/29/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
6/2/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/3/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
6/5/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
6/6/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/9/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/11/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
6/12/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/16/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
6/17/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
6/18/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
6/20/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
6/23/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
6/24/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
6/25/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/27/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/1/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/10/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
7/11/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/15/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/18/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/22/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/23/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/24/2025
|
Approved
|
DAVID BURKHEAD
|
|
Insulation
|
7/25/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
7/28/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/29/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
7/30/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
8/1/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
8/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
8/15/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/18/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
8/20/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
8/21/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
8/21/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
8/22/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Wood Frame
|
8/25/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/26/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
8/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
9/4/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/5/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
9/8/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
9/10/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
9/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
10/8/2025
|
Approved
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/17/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/20/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
10/24/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/10/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
11/13/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
11/14/2025
|
Approved
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
11/18/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/2/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/12/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/19/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/23/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/25/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/26/2026
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Final
|
3/31/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
3/31/2026
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
3/31/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
3/31/2026
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
3/31/2026
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
3/31/2026
|
Conditional Approval
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
3/31/2026
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
3/31/2026
|
Approved
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
3/31/2026
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/1/2026
|
Partial Inspection
|
DAVID BURKHEAD
|