Deputy Reinf. Concrete
|
4/13/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/14/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/15/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/18/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/21/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/22/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/5/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/6/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/1/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/2/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/3/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/7/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/8/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/9/2022
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
7/8/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/18/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
7/18/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
7/19/2022
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/19/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
7/22/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
7/25/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
7/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/26/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Green Building Rough
|
7/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
7/26/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
7/26/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
7/27/2022
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
7/28/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
7/29/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Drilled-In Anchors
|
8/23/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/23/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
8/23/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
8/24/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
8/24/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Masonry
|
8/24/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Drilled-In Anchors
|
8/25/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/25/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
8/25/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
8/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
8/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
8/29/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/31/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
9/16/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/16/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
9/19/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
9/19/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/19/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
9/20/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
9/20/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/20/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
9/21/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
9/21/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/21/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
9/22/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
9/22/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/22/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
9/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
9/27/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/27/2022
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/27/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
9/27/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
9/28/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
10/3/2022
|
Approved
|
JOEY BUCHANAN
|
|
Masonry Wall/Backfill
|
10/19/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
10/20/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
10/21/2022
|
Approved
|
JOEY BUCHANAN
|
|
Masonry Wall/Backfill
|
10/21/2022
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
10/21/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
10/24/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
10/24/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
10/25/2022
|
Approved
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
10/25/2022
|
Approved
|
JOEY BUCHANAN
|
|
Wood Frame
|
10/25/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
10/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/26/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
10/26/2022
|
Approved
|
JOEY BUCHANAN
|
|
Structural Steel Frame
|
10/26/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
10/27/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Fireproofing
|
10/28/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
10/28/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Fireproofing
|
10/31/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/3/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/4/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/8/2022
|
Approved
|
JOEY BUCHANAN
|
|
Structural Steel Frame
|
11/8/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/9/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/10/2022
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/10/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
11/10/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/16/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/17/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/18/2022
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/18/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Masonry Wall/Backfill
|
11/18/2022
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
11/18/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
11/21/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
11/22/2022
|
Approved
|
JOEY BUCHANAN
|
|
Wood Frame
|
11/22/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
11/23/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
11/28/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
11/29/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/29/2022
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
11/30/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
11/30/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/1/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
12/1/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/2/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
12/2/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/5/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
12/6/2022
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
12/6/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wall Anchors
|
12/6/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/7/2022
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Wood Construction
|
12/7/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
12/8/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
12/9/2022
|
Approved
|
JOEY BUCHANAN
|
|
Wall Anchors
|
12/9/2022
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
12/16/2022
|
Approved
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
12/16/2022
|
Partial Approval
|
AMANUEL BERHE
|
|
Drywall Nailing
|
12/19/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
12/19/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
12/21/2022
|
Partial Approval
|
AMANUEL BERHE
|
|
Deputy Wood Construction
|
12/22/2022
|
Partial Approval
|
AMANUEL BERHE
|
|
Deputy Wood Construction
|
12/23/2022
|
Approved
|
JOEY BUCHANAN
|
|
Wall Anchors
|
12/30/2022
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
1/4/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
1/5/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
1/6/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Wood Construction
|
1/12/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Drywall Nailing
|
1/12/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
1/12/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
1/13/2023
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
1/18/2023
|
Approved
|
AMANUEL BERHE
|
|
Pre-Inspection
|
1/18/2023
|
Approved
|
AMANUEL BERHE
|
|
Deputy Wood Construction
|
1/27/2023
|
Approved
|
AMANUEL BERHE
|
|
Insulation
|
1/27/2023
|
Partial Approval
|
AMANUEL BERHE
|
|
Deputy Wood Construction
|
1/30/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
1/31/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
2/1/2023
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/1/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
2/2/2023
|
Approved
|
JOEY BUCHANAN
|
|
Insulation
|
2/6/2023
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
2/10/2023
|
Approved
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
2/10/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
2/10/2023
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
2/15/2023
|
Approved
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
2/15/2023
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
2/15/2023
|
Approved
|
JOEY BUCHANAN
|
|
Wall Anchors
|
2/15/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
2/24/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Steel/Welding
|
2/24/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Interior/Exterior Lathing
|
3/1/2023
|
Approved
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
3/14/2023
|
Partial Approval
|
AMANUEL BERHE
|
|
Special/Order Compliance
|
3/14/2023
|
Partial Inspection
|
AMANUEL BERHE
|
|
Wood Frame
|
3/17/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
3/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
Wood Frame
|
3/31/2023
|
Partial Inspection
|
AMANUEL BERHE
|
|
Drywall Nailing
|
4/5/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
4/11/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
4/12/2023
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
4/14/2023
|
Partial Inspection
|
AMANUEL BERHE
|
|
Special/Order Compliance
|
4/25/2023
|
Approved
|
JOEY BUCHANAN
|
|
Structural Steel Frame
|
4/26/2023
|
Approved
|
JOEY BUCHANAN
|
|
Insulation
|
5/9/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
5/9/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Insulation
|
5/12/2023
|
Partial Inspection
|
JOEY BUCHANAN
|
|
Insulation
|
5/16/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
5/31/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/1/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/2/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/2/2023
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
6/2/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/5/2023
|
Approved
|
JOEY BUCHANAN
|
|
Wall Anchors
|
6/5/2023
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/7/2023
|
Approved
|
JOEY BUCHANAN
|
|
Insulation
|
6/8/2023
|
Approved
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
6/8/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wall Anchors
|
6/8/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
6/9/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
6/12/2023
|
Partial Approval
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
6/20/2023
|
Not Ready for Inspection
|
DAVID TSAU
|
|
Reinforced Concrete Frame
|
6/21/2023
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
6/21/2023
|
Approved
|
JOEY BUCHANAN
|
|
Piling/Pier/Caisson
|
6/30/2023
|
Partial Inspection
|
AMANUEL BERHE
|
|
T-Bar Ceiling
|
7/25/2023
|
Approved
|
JOEY BUCHANAN
|
|
Pre-Inspection
|
8/9/2023
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
8/29/2023
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
9/5/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
|
Footing/Foundation/Slab
|
9/5/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
|
SGSOV-Seismic Gas S/O Valve
|
9/5/2023
|
SGSOV Not Ready
|
AMANUEL BERHE
|
|
Smoke Detectors
|
9/5/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
|
Wood Frame
|
9/5/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
|
Posting Pre-Inspection
|
9/12/2023
|
Approved
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
10/18/2023
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
10/20/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
10/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
Green Building Final
|
10/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
SGSOV-Seismic Gas S/O Valve
|
10/20/2023
|
SGSOV Approved
|
JOEY BUCHANAN
|
|
Smoke Detectors
|
10/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
Wood Frame
|
10/20/2023
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
10/26/2023
|
OK for TCO
|
JOEY BUCHANAN
|