Pre-Inspection
|
9/22/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
9/28/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
9/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Reinforced Concrete Frame
|
9/30/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
10/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
11/1/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Reinforced Concrete Frame
|
11/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
11/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/17/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/17/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/18/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/18/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Reinforced Masonry Frame
|
11/28/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
11/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
11/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
12/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
12/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/19/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Pre-Stress Concrete
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/25/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/25/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/25/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
1/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/13/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
2/13/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/17/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/17/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Grading Pre-Inspection
|
2/20/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/21/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
2/21/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
2/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/24/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
2/24/2023
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
2/24/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
2/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/27/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
2/27/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
2/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/9/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
3/9/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
3/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/16/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
3/16/2023
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
3/16/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
3/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
3/27/2023
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
3/28/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Deputy Reinf. Concrete
|
4/3/2023
|
Approved
|
ALAN MORELOS
|
|
Deputy Reinf. Masonry
|
4/3/2023
|
Approved
|
ALAN MORELOS
|
|
Masonry Wall/Backfill
|
4/3/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Deputy Pre-Stress Concrete
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
4/10/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
4/10/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
4/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
4/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
4/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
4/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
4/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/20/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/20/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/28/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wall Anchors
|
5/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/15/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/15/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/17/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/17/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/24/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/24/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/24/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
5/31/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/14/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
6/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/21/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
7/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/20/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/25/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
7/25/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
8/2/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
8/3/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
8/9/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/24/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Piling/Pier/Caisson
|
8/25/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/29/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
8/29/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
9/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
9/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/25/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/25/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
9/26/2023
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/29/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/5/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/5/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/30/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/3/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/7/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
T-Bar Ceiling
|
11/7/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
11/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
11/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/16/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
T-Bar Ceiling
|
11/21/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
12/5/2023
|
Approved
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
1/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
1/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Final
|
4/22/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/22/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
4/22/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/22/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
4/22/2024
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
4/22/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/22/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/22/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
6/12/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
9/16/2024
|
Partial Inspection
|
RAMAZANALI ALMASI
|
|
Final
|
9/23/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Green Building Final
|
9/23/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
9/23/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
9/24/2024
|
Approved
|
RAFAEL CORTES
|
|
Final
|
12/12/2024
|
OK to Issue CofO
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
12/12/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
12/12/2024
|
Approved
|
RAFAEL ESPINOZA
|