2225 W SUNSET BLVD 90026

Certificate Information: 2225 W SUNSET BLVD 90026

Application / Permit
20010-10000-03388
Plan Check / Job No.
B20LA17656
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 7-story, 176-unit apartment utilizing TOC (Tier 3) base and additional incentives (18 units are ELI - 10%). 4 level Type VA and 5 levels of Type IIIA apartments over 2 levels of Type IA apartments and parking over 1 level Type IA subterranean parking level.
Permit Issued
Issued on 11/22/2022
Issuing Office
Metro
Current Status
Issued on 11/22/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 11/22/2022 RODOLFO ARIAS
Issued 11/22/2022 APPLICANT

Permit Application Clearance Information

Highway dedication Cleared 8/25/2021 RENZ SORIANO
Address approval Cleared 9/29/2021 CECILIO NAVARRO
Construction near power lines Cleared 4/6/2022 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 4/14/2022 PAMELA TENEZA
Bicycle Parking Cleared 5/10/2022 JEREMY CHOK
Green Code Cleared 5/12/2022 AARON COSTA
Sewer availability Cleared 6/16/2022 CHRISTOPHER ROCHA
Work Adjacent to Public Way Cleared 7/8/2022 JOSE RODRIGUEZ
Trees in Parkway Cleared 8/2/2022 ADALBERTO VERA
Driveway location Cleared 8/18/2022 COLLINS ALLAN
Driveway location Cleared 8/18/2022 COLLINS ALLAN
Fire Marshal Fire Life Safety Cleared 10/14/2022 WILLIAM JOHNS
DCP conditions approval Cleared 10/18/2022 JAMES MCCARTHY
Density Bonus 12.22.A.31 Cleared 10/18/2022 JAMES MCCARTHY
Low Impact Development Cleared 10/19/2022 JORGE MEJIA LEMUS
Permit Cleared 10/19/2022 ADRIAN SANCHEZ
Roof/Waste drainage to street Cleared 10/19/2022 ADRIAN SANCHEZ
Hydrant and Access approval Cleared 10/25/2022 RUEL COLE
"Q" conditions Cleared 11/1/2022 RUBEN VASQUEZ
CPC Cleared 11/1/2022 RUBEN VASQUEZ
Frnt yard landscape/Water mgmt Cleared 11/1/2022 RUBEN VASQUEZ
Opn space landscape/Water mgmt Cleared 11/1/2022 RUBEN VASQUEZ
Site Plan review Cleared 11/1/2022 RUBEN VASQUEZ
Tract Map conditions Cleared 11/1/2022 RUBEN VASQUEZ
Tract Map conditions Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
ZA Case Cleared 11/1/2022 RUBEN VASQUEZ
DAS Clearance Cleared 11/2/2022 RODOLFO ARIAS
Building over 36-ft Cleared 11/10/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/10/2022 CALOSHA APPROVED
GPI Written Notices Cleared 11/10/2022 RODOLFO ARIAS
Grading Pre-Inspection Cleared 11/10/2022 RODOLFO ARIAS

Contact Information

Architect Ottinger,, Jesse A; Lic. No.: C33729 465 N ALTA VISTA BLVD      LOS ANGELES, CA 90036
Contractor Integrare Group Llc; Lic. No.: 1063352-B 12421 VENICE BLVD      LOS ANGELES, CA 90066
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Davis,, Richard Hays; Lic. No.: C48082 2015 CANTATA DR      LOS ANGELES, CA 90068
Engineer Mulla,, Hasan_Ali Muhammad; Lic. No.: S1928 18643 TULSA ST      NORTHRIDGE, CA 91324
Landscape Architect Walter,, Matson D; Lic. No.: LA4369 3308 STEVELY AVE      LONG BEACH, CA 90808

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/9/2022 Approved TED RIES
Pre-Inspection 2/15/2023 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 2/16/2023 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 2/22/2023 Partial Approval TED RIES
Footing/Foundation/Slab 3/9/2023 Partial Approval TED RIES
Footing/Foundation/Slab 3/31/2023 Partial Approval TED RIES
Footing/Foundation/Slab 4/11/2023 Partial Approval TED RIES
Footing/Foundation/Slab 4/17/2023 Partial Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 4/18/2023 Approved RAMAZANALI ALMASI
Footing/Foundation/Slab 4/20/2023 Partial Approval TED RIES
Footing/Foundation/Slab 4/24/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/25/2023 Not Ready for Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 4/25/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 4/28/2023 Partial Inspection TIMOTHY POWELL
Excavation/Setback/Form/Re-Bar 5/1/2023 Partial Approval TIMOTHY POWELL
Footing/Foundation/Slab 5/2/2023 Partial Inspection NICK DANERI
Reinforced Concrete Frame 5/10/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/11/2023 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/12/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/16/2023 Partial Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 5/18/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/19/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 5/19/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/19/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/19/2023 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 5/24/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/24/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/24/2023 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/25/2023 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/26/2023 Partial Approval GREGORY POMISH
Green Building Rough 5/30/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 5/30/2023 Partial Inspection TED RIES
Verify Sprinkler Sign Off 5/30/2023 Not Ready for Inspection TED RIES
Footing/Foundation/Slab 5/31/2023 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/1/2023 Not Ready for Inspection TED RIES
Piling/Pier/Caisson 6/2/2023 Partial Approval JEROME BLACKWOOD
Reinforced Concrete Frame 6/5/2023 Partial Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 6/6/2023 Partial Approval TED RIES
Footing/Foundation/Slab 6/9/2023 Conditional Approval LARRY ARNICK
Pre-Inspection 6/12/2023 Partial Approval TED RIES
Green Building Rough 6/16/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/16/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 6/16/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/21/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 6/21/2023 Partial Approval RAFAEL ESPINOZA
Green Building Rough 7/3/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 7/3/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/3/2023 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 7/6/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 7/12/2023 Partial Approval TED RIES
Footing/Foundation/Slab 7/14/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 7/21/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/21/2023 Partial Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 8/25/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/28/2023 Partial Approval MARTIN TAVITIAN
Masonry Wall/Backfill 9/1/2023 Partial Approval DAVID BURKHEAD
Piling/Pier/Caisson 9/1/2023 Partial Approval DAVID BURKHEAD
Piling/Pier/Caisson 9/6/2023 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 9/7/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/8/2023 Partial Approval TED RIES
Masonry Wall/Backfill 9/13/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/20/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 9/26/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/18/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/26/2023 Partial Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 11/1/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/6/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/7/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/8/2023 Partial Approval RAFAEL ESPINOZA
Green Building Rough 11/15/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 11/15/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/15/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/16/2023 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 11/17/2023 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 12/1/2023 Partial Approval GREGORY POMISH
Green Building Rough 12/14/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/14/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/14/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/10/2024 Partial Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 1/17/2024 Partial Approval GREGORY POMISH
Green Building Rough 1/18/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/18/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/18/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 1/25/2024 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 1/25/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 1/25/2024 Not Ready for Inspection GREGORY POMISH
Green Building Rough 1/30/2024 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/30/2024 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/30/2024 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 2/6/2024 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 2/6/2024 Partial Inspection RAFAEL ESPINOZA
Green Building Rough 2/13/2024 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 2/13/2024 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/13/2024 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/14/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/1/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 3/7/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/19/2024 Partial Inspection JEFFREY FULTON
Wood Frame 3/19/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/3/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 4/4/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/4/2024 Partial Inspection JEFFREY FULTON
Wood Frame 4/5/2024 Partial Approval LARRY ARNICK
Drywall Nailing 4/9/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/9/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 4/11/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/17/2024 Partial Inspection JEFFREY FULTON
Wood Frame 4/17/2024 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/18/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/18/2024 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 4/18/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 4/19/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/30/2024 Not Ready for Inspection JEFFREY FULTON
Pre-Inspection 4/30/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 4/30/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/1/2024 Partial Inspection JEFFREY FULTON
Wood Frame 5/1/2024 Corrections Issued JEFFREY FULTON
Drywall Nailing 5/3/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 5/3/2024 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/6/2024 Not Ready for Inspection RAMAZANALI ALMASI
Footing/Foundation/Slab 5/6/2024 Not Ready for Inspection RAMAZANALI ALMASI
Green Building Rough 5/6/2024 Not Ready for Inspection RAMAZANALI ALMASI
Pre-Inspection 5/6/2024 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/6/2024 Not Ready for Inspection RAMAZANALI ALMASI
Verify Sprinkler Sign Off 5/6/2024 Not Ready for Inspection RAMAZANALI ALMASI
Wood Frame 5/6/2024 Not Ready for Inspection RAMAZANALI ALMASI
Wood Frame 5/8/2024 Pending Review
Floor/Roof Diaphrgm/Shear Wall 5/16/2024 Partial Inspection JEFFREY FULTON
Wood Frame 5/16/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 5/22/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/22/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 5/22/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 5/22/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 5/22/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/24/2024 Partial Inspection JEFFREY FULTON
Wood Frame 5/24/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 6/4/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/4/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/7/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 6/7/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 6/7/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 6/7/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 6/25/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/25/2024 Partial Inspection JEFFREY FULTON
Wood Frame 6/25/2024 Partial Inspection JEFFREY FULTON
Insulation 6/28/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/28/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/2/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/2/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 7/2/2024 Partial Inspection JEFFREY FULTON
Wood Frame 7/2/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/15/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/16/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 7/16/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 7/17/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 7/17/2024 Partial Inspection JEFFREY FULTON
Reinforced Concrete Frame 7/17/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 7/17/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 7/17/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/23/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/23/2024 Partial Approval LARRY ARNICK
Insulation 7/23/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 7/24/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 7/24/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 7/24/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/29/2024 Partial Approval DAVID BURKHEAD
Insulation 7/29/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/2/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/2/2024 Partial Inspection JEFFREY FULTON
Wood Frame 8/2/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 8/9/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/9/2024 Partial Inspection JEFFREY FULTON
Wood Frame 8/9/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 8/12/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/12/2024 Partial Inspection JEFFREY FULTON
Wood Frame 8/12/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 8/13/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/16/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/16/2024 Partial Inspection JEFFREY FULTON
Wood Frame 8/16/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/28/2024 Not Ready for Inspection DAVID BURKHEAD
Insulation 8/28/2024 Partial Approval DAVID BURKHEAD
Wood Frame 8/28/2024 Not Ready for Inspection DAVID BURKHEAD
Insulation 8/29/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 8/29/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/30/2024 Partial Inspection JEFFREY FULTON
Wood Frame 8/30/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 9/10/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/10/2024 Partial Approval LARRY ARNICK
Insulation 9/10/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/13/2024 Corrections Issued JEFFREY FULTON
Insulation 9/13/2024 Partial Inspection JEFFREY FULTON
Wood Frame 9/13/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/16/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 9/16/2024 Partial Inspection JEFFREY FULTON
Insulation 9/16/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/16/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 9/19/2024 Not Ready for Inspection RAFAEL CORTES
Insulation 9/19/2024 Partial Approval RAFAEL CORTES
Wood Frame 9/19/2024 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 9/23/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 9/23/2024 Partial Inspection JEFFREY FULTON
Wood Frame 9/23/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 9/24/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/24/2024 Partial Inspection JEFFREY FULTON
Insulation 9/25/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/25/2024 Partial Inspection JEFFREY FULTON
Insulation 9/27/2024 Partial Inspection JEFFREY FULTON
Wood Frame 9/27/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 9/30/2024 Not Ready for Inspection LARRY ARNICK
Insulation 9/30/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 10/1/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 10/1/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 10/2/2024 Partial Inspection JEFFREY FULTON
Wood Frame 10/2/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/3/2024 Partial Approval JEROME BLACKWOOD
Insulation 10/7/2024 Partial Inspection JEFFREY FULTON
Wood Frame 10/7/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 10/9/2024 Partial Approval LARRY ARNICK
Wood Frame 10/9/2024 Partial Approval LARRY ARNICK
Wood Frame 10/11/2024 Partial Approval RAMAZANALI ALMASI
Insulation 10/16/2024 Partial Inspection JEFFREY FULTON
Wood Frame 10/16/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 10/17/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 10/17/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 10/18/2024 Partial Inspection JEFFREY FULTON
Insulation 10/18/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 10/22/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 10/28/2024 Partial Approval TIMOTHY POWELL
Wood Frame 10/28/2024 Partial Approval TIMOTHY POWELL
Floor/Roof Diaphrgm/Shear Wall 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/12/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/21/2024 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 11/21/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/21/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 11/22/2024 Partial Approval LUIS CCAMACHO
Wood Frame 11/22/2024 Partial Approval LUIS CCAMACHO
Floor/Roof Diaphrgm/Shear Wall 11/25/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/25/2024 Partial Inspection JEFFREY FULTON
Wood Frame 11/26/2024 Corrections Issued JEFFREY FULTON
Wood Frame 11/27/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 12/2/2024 Partial Inspection JEFFREY FULTON
Wood Frame 12/3/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 12/5/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/5/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 12/6/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/6/2024 Corrections Issued JEFFREY FULTON
Footing/Foundation/Slab 12/9/2024 Partial Inspection JEFFREY FULTON
Wood Frame 12/9/2024 Partial Inspection JEFFREY FULTON
Insulation 12/10/2024 Partial Approval NICK DANERI
Wood Frame 12/10/2024 Partial Approval NICK DANERI
Footing/Foundation/Slab 12/11/2024 Partial Inspection JEFFREY FULTON
Wood Frame 12/11/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 12/13/2024 Partial Inspection JEFFREY FULTON
Wood Frame 12/13/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 12/17/2024 Partial Inspection JEFFREY FULTON
Wood Frame 12/17/2024 Partial Inspection JEFFREY FULTON
Insulation 12/19/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/19/2024 Partial Inspection JEFFREY FULTON
Insulation 12/27/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 12/27/2024 Not Ready for Inspection LARRY ARNICK
Insulation 12/31/2024 Partial Inspection JEFFREY FULTON
Wood Frame 12/31/2024 Partial Inspection JEFFREY FULTON
Insulation 1/2/2025 Partial Inspection JEFFREY FULTON
Wood Frame 1/2/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 1/3/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 1/3/2025 Partial Inspection JEFFREY FULTON
Insulation 1/7/2025 Partial Approval LUIS CCAMACHO
Wood Frame 1/7/2025 Partial Approval LUIS CCAMACHO
Insulation 1/13/2025 Corrections Issued LARRY ARNICK
Wood Frame 1/13/2025 Partial Approval LARRY ARNICK
Insulation 1/15/2025 Partial Approval LUIS CCAMACHO
Wood Frame 1/15/2025 Partial Approval LUIS CCAMACHO
Insulation 1/23/2025 Partial Inspection JEFFREY FULTON
Insulation 1/24/2025 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 1/24/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 1/27/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 1/27/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 1/28/2025 Partial Inspection JEFFREY FULTON
Wood Frame 1/29/2025 Partial Inspection JEFFREY FULTON
Wood Frame 1/30/2025 Partial Inspection JEFFREY FULTON
Wood Frame 2/3/2025 Partial Inspection JEFFREY FULTON
Wood Frame 2/4/2025 Partial Inspection JEFFREY FULTON
Wood Frame 2/11/2025 Partial Inspection JEFFREY FULTON
Wood Frame 2/12/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 2/18/2025 Partial Approval NICK DANERI
Insulation 2/19/2025 Not Ready for Inspection JAMES POWERS
Wood Frame 2/19/2025 Partial Approval JAMES POWERS
Wood Frame 2/20/2025 Corrections Issued DAVID BURKHEAD
Insulation 2/21/2025 Partial Approval DAVID BURKHEAD
Wood Frame 2/21/2025 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/25/2025 Partial Inspection JEFFREY FULTON
Wood Frame 2/25/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 2/26/2025 Partial Inspection JEFFREY FULTON
Insulation 2/27/2025 Partial Inspection JEFFREY FULTON
Insulation 2/28/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/3/2025 Partial Inspection JEFFREY FULTON
Insulation 3/3/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/4/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 3/6/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/6/2025 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 3/10/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/13/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/14/2025 Partial Inspection JEFFREY FULTON
Wood Frame 3/14/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/17/2025 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/17/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 3/17/2025 Partial Inspection JEFFREY FULTON
Wood Frame 3/17/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 3/18/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/18/2025 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/20/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/20/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/24/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/26/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/26/2025 Partial Inspection JEFFREY FULTON
Insulation 3/27/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/27/2025 Partial Inspection JEFFREY FULTON
Wood Frame 3/27/2025 Partial Inspection JEFFREY FULTON
Insulation 3/28/2025 Partial Inspection JEFFREY FULTON
Wood Frame 3/28/2025 Partial Inspection JEFFREY FULTON
Insulation 4/1/2025 Partial Inspection JEFFREY FULTON
Wood Frame 4/1/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 4/2/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/2/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/3/2025 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/4/2025 Partial Inspection JEFFREY FULTON
Insulation 4/4/2025 Corrections Issued JEFFREY FULTON
Drywall Nailing 4/7/2025 Partial Inspection JEFFREY FULTON
Wood Frame 4/9/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 4/10/2025 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/10/2025 Partial Inspection JEFFREY FULTON
Pre-Inspection 4/11/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 4/15/2025 Corrections Issued LARRY ARNICK
Wood Frame 4/15/2025 Partial Approval LARRY ARNICK
Insulation 4/16/2025 Partial Approval LARRY ARNICK
Drywall Nailing 4/17/2025 Partial Approval LARRY ARNICK
Insulation 4/21/2025 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 4/24/2025 Approved JEFFREY FULTON
Reinforced Concrete Frame 4/24/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/24/2025 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 4/25/2025 Partial Inspection DAVID BURKHEAD
Insulation 5/1/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 5/1/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/1/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 5/2/2025 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/2/2025 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 5/2/2025 Partial Approval DAVID BURKHEAD
Insulation 5/5/2025 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 5/5/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/5/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 5/7/2025 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 5/7/2025 Partial Inspection JEFFREY FULTON
Insulation 5/8/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 5/8/2025 Partial Approval LARRY ARNICK
Insulation 5/9/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 5/9/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 5/12/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 5/13/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/13/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/19/2025 Partial Inspection JEFFREY FULTON
Insulation 5/19/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/19/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/21/2025 Partial Inspection JEFFREY FULTON
Insulation 5/21/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/21/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/22/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 5/22/2025 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/23/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 5/23/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/28/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/29/2025 Partial Inspection JEFFREY FULTON
Insulation 5/29/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/29/2025 Partial Inspection JEFFREY FULTON
Insulation 5/30/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 5/30/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/30/2025 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/2/2025 Partial Inspection JEFFREY FULTON
Insulation 6/2/2025 Corrections Issued JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/4/2025 Partial Inspection JEFFREY FULTON
Insulation 6/4/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/4/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/5/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 6/5/2025 Partial Inspection JEFFREY FULTON
Wood Frame 6/5/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 6/6/2025 Partial Inspection JEFFREY FULTON
Wood Frame 6/6/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 6/9/2025 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/9/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/10/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 6/10/2025 Corrections Issued JEFFREY FULTON
Drywall Nailing 6/11/2025 Partial Inspection JEFFREY FULTON
Insulation 6/12/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 6/12/2025 Corrections Issued JEFFREY FULTON
Drywall Nailing 6/13/2025 Not Ready for Inspection DAVID BURKHEAD
Insulation 6/13/2025 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/13/2025 Partial Approval DAVID BURKHEAD
Insulation 6/17/2025 Partial Inspection JEFFREY FULTON
Wood Frame 6/17/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 6/18/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/20/2025 Partial Approval LARRY ARNICK
Insulation 6/20/2025 Partial Approval LARRY ARNICK
Drywall Nailing 6/23/2025 Partial Inspection JEFFREY FULTON
Insulation 6/23/2025 Partial Inspection JEFFREY FULTON
Wood Frame 6/23/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/24/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 6/24/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 6/25/2025 Partial Inspection JEFFREY FULTON
Wood Frame 6/25/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 6/26/2025 Partial Inspection JEFFREY FULTON
Wood Frame 6/26/2025 Partial Inspection JEFFREY FULTON
Reinforced Concrete Frame 6/27/2025 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 6/27/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 7/1/2025 Partial Inspection JEFFREY FULTON
Insulation 7/1/2025 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 7/2/2025 Partial Inspection JEFFREY FULTON
Insulation 7/2/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/3/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 7/3/2025 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 7/7/2025 Partial Inspection JEFFREY FULTON
Insulation 7/7/2025 Partial Inspection JEFFREY FULTON
Insulation 7/8/2025 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 7/8/2025 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 7/10/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/10/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 7/10/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/11/2025 Partial Approval DAVID BURKHEAD
Wood Frame 7/11/2025 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/15/2025 Partial Approval DAVID BURKHEAD
Insulation 7/16/2025 Partial Inspection DAVID BURKHEAD
Drywall Nailing 7/17/2025 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/21/2025 Partial Approval JOEY BUCHANAN
Insulation 7/22/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/23/2025 Partial Approval LARRY ARNICK
Insulation 7/29/2025 Partial Approval LARRY ARNICK
Insulation 7/30/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/30/2025 Partial Approval LARRY ARNICK
Insulation 8/1/2025 Partial Approval LARRY ARNICK
Light Gage Steel Frame 8/1/2025 Partial Approval LARRY ARNICK
Light Gage Steel Frame 8/7/2025 Partial Approval LARRY ARNICK
Light Gage Steel Frame 8/8/2025 Partial Approval LARRY ARNICK
Insulation 8/11/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 8/11/2025 Not Ready for Inspection LARRY ARNICK
Insulation 8/13/2025 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 8/13/2025 Partial Approval LARRY ARNICK
Light Gage Steel Frame 8/13/2025 Partial Approval LARRY ARNICK
Drywall Nailing 8/22/2025 Partial Approval PAUL BAZERKANIAN
Footing/Foundation/Slab 8/22/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 8/25/2025 Partial Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/25/2025 Partial Approval LARRY ARNICK
Insulation 8/29/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 9/3/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/4/2025 Corrections Issued JEFFREY FULTON
Special/Order Compliance 9/4/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 9/12/2025 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 9/15/2025 No Access for Inspection RAFAEL CORTES
Insulation 9/18/2025 Corrections Issued JEFFREY FULTON
Interior/Exterior Lathing 9/18/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 9/22/2025 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/24/2025 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 9/24/2025 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 9/26/2025 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 9/26/2025 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 10/1/2025 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 10/3/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 10/6/2025 Partial Inspection JEFFREY FULTON
Wood Frame 10/6/2025 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 10/9/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 10/14/2025 Partial Inspection JEFFREY FULTON
Structural Steel Frame 10/14/2025 Partial Inspection JEFFREY FULTON
Insulation 10/16/2025 Partial Inspection JEFFREY FULTON
Wood Frame 10/16/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/17/2025 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 10/17/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/20/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/22/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/23/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/24/2025 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/31/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 11/4/2025 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/6/2025 Partial Inspection JEFFREY FULTON
Pre-Inspection 11/6/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 11/10/2025 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 11/10/2025 Not Ready for Inspection SCOTT SOBEL
Interior/Exterior Lathing 11/12/2025 Partial Inspection JEFFREY FULTON
Pre-Inspection 11/19/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/12/2025 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 1/30/2026 Partial Inspection LARRY ARNICK
Pre-Inspection 2/11/2026 Approved DAVID BURKHEAD
Light Gage Steel Frame 4/9/2026 Partial Approval DAVID BURKHEAD
Final 5/6/2026 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/6/2026 Approved DAVID BURKHEAD
Green Building Final 5/6/2026 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/6/2026 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 5/6/2026 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/6/2026 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 5/6/2026 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/6/2026 Not Ready for Inspection DAVID BURKHEAD