1611 W MONTANA ST 90026
Certificate Information: 1611 W MONTANA ST 90026
- Application / Permit
- 20010-10000-03289
- Plan Check / Job No.
- B20LA17160
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- NEW 5 STORY 64 UNITS 100% AFFORDABLE HOUSING APARTMENT/PERMANENT SUPPORTIVE HOUSING TO INLUDE 4 STORY TYPE VA APARTMENT OVER 1 STORY TYPE IA PARKING/APARTMENT/SUPPORTIVE SERVICES, TIER 4 TOC WITH ADDITIONAL INCENTIVES
- Permit Issued
- Issued on 4/22/2021
- Issuing Office
- Metro
- Current Status
- CofO Issued on 9/19/2023
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Plan Check Approved | 4/9/2021 | MANUEL MONTUFAR |
| Issued | 4/22/2021 | APPLICANT |
| TCO Issued (Expire Date: 09-18-2023) | 3/22/2023 | ERNESTO CORRAL |
| CofO in Progress | 9/19/2023 | RAFAEL ESPINOZA |
| CofO Issued | 9/19/2023 | ERNESTO CORRAL |
| Permit Finaled | 9/19/2023 | ERNESTO CORRAL |
Permit Application Clearance Information
| Tenant Habitability Plan | Cleared | 12/3/2020 | PHILLIP MUNGUIA |
| Eng Process Fee Ord 176,300 | Cleared | 12/9/2020 | ROSA SILVA |
| Address approval | Cleared | 12/11/2020 | CELINA MORENO |
| Highway dedication | Cleared | 12/11/2020 | CELINA MORENO |
| Permit | Cleared | 12/11/2020 | CELINA MORENO |
| GPI Written Notices | Cleared | 1/5/2021 | MANUEL MONTUFAR |
| Grading Pre-Inspection | Cleared | 1/5/2021 | MANUEL MONTUFAR |
| Sewer availability | Cleared | 1/12/2021 | CELINA MORENO |
| Hydrant and Access approval | Cleared | 1/21/2021 | JEREMY CARTER |
| Green Code | Cleared | 2/2/2021 | AARON COSTA |
| Trees in Parkway | Cleared | 2/4/2021 | JOHN KIM |
| Density Bonus 12.22.A.31 | Cleared | 3/2/2021 | NICHOLAS KAWAZOE |
| Building over 36-ft | Cleared | 3/4/2021 | CALOSHA APPROVED |
| Excavation more than 5-ft deep | Cleared | 3/4/2021 | CALOSHA APPROVED |
| Fire Marshall Fire Life Safety | Cleared | 3/10/2021 | VIDAL GARCIA |
| DAS Clearance | Cleared | 3/18/2021 | MANUEL MONTUFAR |
| Public Housing | Cleared | 3/18/2021 | RUBEN REYES |
| Work Adjacent to Public Way | Cleared | 3/18/2021 | ARMEN SARKISIAN |
| Low Impact Development | Cleared | 3/22/2021 | MARTIN FRAGOSO |
| "Q" conditions | Cleared | 3/23/2021 | ANNA VIDAL |
| Frnt yard landscape/Water mgmt | Cleared | 3/23/2021 | ANNA VIDAL |
| Miscellaneous | Cleared | 3/23/2021 | ANNA VIDAL |
| Miscellaneous | Cleared | 3/23/2021 | ANNA VIDAL |
| Opn space landscape/Water mgmt | Cleared | 3/23/2021 | ANNA VIDAL |
| ZA Case | Cleared | 3/23/2021 | ANNA VIDAL |
| Roof/Waste drainage to street | Cleared | 3/24/2021 | CECILIO NAVARRO |
Contact Information
| Architect | Arnold,, John Howard; Lic. No.: C30834 | 2166 W 30TH STREET LOS ANGELES, CA 90018 |
| Contractor | Alpha Construction Co Inc; Lic. No.: 241368-B | 14601 AETNA STREET VAN NUYS, CA 91411 |
| Engineer | Derkalousdian,, Hrair Harry; Lic. No.: C79694 | 3622 VIRGINIA STREET GLENDALE, CA 91214 |
| Engineer | Dupont,, Armando Duarte; Lic. No.: L7780 | 411 JENKS CIR CORONA, CA 92880 |
| Engineer | Fischer,, Kurt Mark; Lic. No.: S5432 | PO BOX 809 POWAY, CA 92074 |
| Engineer | Powers,, Brian Frederick; Lic. No.: C75902 | 2090 WEST 31ST STREET LOS ANGELES, CA 90018 |
| Landscape Architect | Lir,, Yael; Lic. No.: LA3171 | 1010 SYCAMORE AVE STE 313 S PASADENA, CA 91030 |
Inspector Information
| RONALD JIMENEZ, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| LARRY ARNICK, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| JOEY BUCHANAN, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| ERNESTO CORRAL, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| RAFAEL ESPINOZA, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 8/11/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/16/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/17/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/18/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/19/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/20/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/30/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/31/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 8/31/2021 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 9/2/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 9/8/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Excavation/Setback/Form/Re-Bar | 9/8/2021 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 9/8/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 9/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 9/15/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 9/16/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 9/17/2021 | Partial Approval | RAFAEL ESPINOZA |
| Masonry Wall/Backfill | 9/17/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 9/20/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 9/22/2021 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Excavation/Setback/Form/Re-Bar | 9/23/2021 | Partial Approval | EDWIN GREGORYONA |
| Deputy Reinf. Masonry | 9/29/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 9/29/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 10/4/2021 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/4/2021 | Conditional Approval | ERNESTO CORRAL |
| Reinforced Masonry Frame | 10/4/2021 | Partial Approval | RAFAEL ESPINOZA |
| Reinforced Masonry Frame | 10/6/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/7/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/8/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/13/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/14/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/15/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/18/2021 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/19/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/20/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/21/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Masonry Wall/Backfill | 10/21/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/22/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/28/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Reinforced Masonry Frame | 10/28/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/29/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Green Building Rough | 11/8/2021 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Reinforced Concrete Frame | 11/8/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 11/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Reinforced Masonry Frame | 11/22/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/2/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/3/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/17/2021 | Partial Approval | EDWIN GREGORYONA |
| Footing/Foundation/Slab | 12/17/2021 | Partial Approval | EDWIN GREGORYONA |
| Deputy Reinf. Concrete | 12/20/2021 | Partial Approval | EDWIN GREGORYONA |
| Deputy Reinf. Masonry | 12/23/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 12/27/2021 | Conditional Approval | NICK DANERI |
| Masonry Wall/Backfill | 12/29/2021 | Partial Inspection | NICK DANERI |
| Deputy Reinf. Masonry | 1/19/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 1/20/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 1/21/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 1/27/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Masonry Wall/Backfill | 1/27/2022 | Partial Approval | RAFAEL ESPINOZA |
| Reinforced Concrete Frame | 1/27/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 1/28/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/28/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 1/28/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/4/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Green Building Rough | 2/4/2022 | Approved | RAFAEL ESPINOZA |
| Wood Frame | 2/4/2022 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Wood Construction | 2/16/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 2/17/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Floor/Roof Diaphrgm/Shear Wall | 2/17/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 2/23/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 2/28/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/2/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Excavation/Setback/Form/Re-Bar | 3/2/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 3/11/2022 | Conditional Approval | NICK DANERI |
| Wood Frame | 3/11/2022 | Partial Approval | EDWIN GREGORYONA |
| Verify Sprinkler Sign Off | 3/16/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Wood Frame | 3/16/2022 | Partial Inspection | RAFAEL ESPINOZA |
| Drywall Nailing | 3/21/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 3/25/2022 | Conditional Approval | NICK DANERI |
| Floor/Roof Diaphrgm/Shear Wall | 3/25/2022 | Partial Approval | NICK DANERI |
| Deputy Wood Construction | 4/4/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 4/19/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Floor/Roof Diaphrgm/Shear Wall | 4/19/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Smoke Detectors | 4/19/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Deputy Wood Construction | 4/20/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Floor/Roof Diaphrgm/Shear Wall | 4/21/2022 | Partial Approval | RAFAEL ESPINOZA |
| Verify Sprinkler Sign Off | 4/21/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Drywall Nailing | 4/26/2022 | Partial Approval | RAFAEL ESPINOZA |
| Wood Frame | 4/28/2022 | Partial Approval | RAFAEL ESPINOZA |
| Wood Frame | 5/3/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Wood Frame | 5/4/2022 | Partial Approval | RAFAEL ESPINOZA |
| Wood Frame | 5/6/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Wood Frame | 5/9/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 5/10/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 5/16/2022 | Conditional Approval | ERNESTO CORRAL |
| Insulation | 5/17/2022 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 5/18/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Wood Frame | 5/19/2022 | Partial Approval | RAFAEL ESPINOZA |
| Insulation | 5/23/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 5/25/2022 | Conditional Approval | TERRY HERR |
| Drywall Nailing | 5/25/2022 | Partial Approval | RAFAEL ESPINOZA |
| Insulation | 5/25/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 5/26/2022 | Conditional Approval | ERNESTO CORRAL |
| Insulation | 5/31/2022 | Partial Approval | RAFAEL ESPINOZA |
| Wood Frame | 5/31/2022 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 6/2/2022 | Conditional Approval | ERNESTO CORRAL |
| Wood Frame | 6/3/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Floor/Roof Diaphrgm/Shear Wall | 6/7/2022 | Partial Approval | RAFAEL ESPINOZA |
| Wood Frame | 6/7/2022 | Partial Approval | RAFAEL ESPINOZA |
| Insulation | 6/8/2022 | Partial Inspection | RAFAEL ESPINOZA |
| Insulation | 6/10/2022 | Partial Approval | RAFAEL ESPINOZA |
| Insulation | 6/22/2022 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 6/27/2022 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 7/5/2022 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 7/6/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Insulation | 7/8/2022 | Partial Approval | RAFAEL ESPINOZA |
| Insulation | 7/14/2022 | Partial Approval | RAFAEL ESPINOZA |
| Insulation | 7/20/2022 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 7/22/2022 | Off-Hour Fees Due | |
| Light Gage Steel Frame | 7/22/2022 | Partial Approval | EDWIN GREGORYONA |
| Drywall Nailing | 7/29/2022 | Partial Approval | RAFAEL ESPINOZA |
| Interior/Exterior Lathing | 8/4/2022 | Partial Approval | TED RIES |
| Drywall Nailing | 8/15/2022 | Partial Approval | RAFAEL ESPINOZA |
| Interior/Exterior Lathing | 8/15/2022 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 8/26/2022 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 10/17/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 10/25/2022 | Partial Approval | RAFAEL ESPINOZA |
| Special/Order Compliance | 12/14/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 12/21/2022 | Approved | RAFAEL ESPINOZA |
| T-Bar Ceiling | 1/6/2023 | Approved | GREGORY POMISH |
| Final | 2/16/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 2/16/2023 | Approved | RAFAEL ESPINOZA |
| Green Building Final | 2/16/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Reinforced Concrete Frame | 2/16/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 2/16/2023 | SGSOV Not Ready | RAFAEL ESPINOZA |
| Smoke Detectors | 2/16/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Verify Sprinkler Sign Off | 2/16/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Wood Frame | 2/16/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Pre-Inspection | 3/13/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 8/23/2023 | Approved | RAFAEL ESPINOZA |
| Final | 9/19/2023 | OK to Issue CofO | RAFAEL ESPINOZA |
| Green Building Final | 9/19/2023 | Approved | RAFAEL ESPINOZA |
| Reinforced Concrete Frame | 9/19/2023 | Approved | RAFAEL ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 9/19/2023 | SGSOV Approved | RAFAEL ESPINOZA |
| Smoke Detectors | 9/19/2023 | Approved | RAFAEL ESPINOZA |
| Verify Sprinkler Sign Off | 9/19/2023 | Approved | RAFAEL ESPINOZA |
| Wood Frame | 9/19/2023 | Approved | RAFAEL ESPINOZA |