Footing/Foundation/Slab
|
8/16/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
8/24/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
8/25/2022
|
Corrections Issued
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
8/26/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
8/31/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/1/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
9/1/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/2/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
9/2/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/7/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
11/10/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/23/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/28/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/29/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/3/2023
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
5/26/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/5/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
6/7/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/8/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/10/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
7/13/2023
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
7/26/2023
|
Corrections Issued
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
8/1/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Deputy Shotcrete
|
8/3/2023
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Shotcrete
|
9/21/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/21/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
9/22/2023
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
9/22/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
9/25/2023
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/27/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
10/13/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
10/19/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
10/27/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/30/2023
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
11/1/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/2/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
11/2/2023
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
11/8/2023
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/8/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
11/14/2023
|
Approved
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
11/14/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
11/15/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
11/27/2023
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/7/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
12/12/2023
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/14/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/15/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/3/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/23/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
1/25/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
1/26/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
1/31/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
2/6/2024
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
2/7/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
2/8/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
3/4/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
3/12/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
3/26/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
3/26/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
3/27/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
4/2/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/9/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
4/18/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
4/19/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/22/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
4/23/2024
|
Approved
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/3/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/10/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/7/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
6/13/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/13/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/14/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/20/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/25/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/27/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
7/1/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/3/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
7/18/2024
|
Approved
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/19/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
8/8/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
8/19/2024
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
8/20/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/21/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
9/25/2024
|
Approved
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/1/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
11/20/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
11/20/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
11/20/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2024
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
12/10/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/13/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/13/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/14/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/23/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/23/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/24/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/28/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/28/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/30/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
2/7/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/7/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/7/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/10/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
2/11/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/11/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/11/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
2/12/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/13/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/13/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
2/13/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/14/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/18/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
2/19/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/19/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/19/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/20/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/20/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/21/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/21/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/25/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/26/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/3/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/4/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/5/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/6/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/7/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/10/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/11/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/13/2025
|
No Access for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/14/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/18/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/19/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/20/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
3/20/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
3/27/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
3/28/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
4/1/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/1/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/1/2025
|
Approved
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
4/1/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
4/1/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/2/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
4/2/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/3/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/4/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
4/4/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
4/4/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/7/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/7/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/7/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/8/2025
|
No Access for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/8/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/9/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/10/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
6/4/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
6/4/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
6/4/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
6/4/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
6/5/2025
|
Conditional Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
6/6/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
6/6/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
6/6/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
6/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
6/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
6/9/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
6/12/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
6/12/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
6/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
6/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
6/16/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
6/17/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
6/18/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
6/24/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Structural Steel Frame
|
6/24/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
6/27/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
6/27/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
7/1/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
7/15/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
7/16/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
7/16/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/16/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
7/16/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
7/17/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
7/18/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
7/18/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/18/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
7/21/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/22/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
8/12/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
8/14/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
8/15/2025
|
Approved
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
8/15/2025
|
Approved
|
JOHN KITCKO
|
|
Wood Frame
|
8/15/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
8/27/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
8/29/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
8/29/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
9/2/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
9/3/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Structural Steel Frame
|
9/3/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
9/4/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
9/15/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
9/17/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
9/17/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
9/23/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
9/25/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
9/26/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
9/26/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
10/1/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
10/1/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
10/2/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
10/2/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
10/3/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
10/3/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
10/6/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
10/6/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
10/10/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
10/14/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
10/15/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
10/15/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
10/23/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
10/27/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
10/27/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
10/27/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
10/30/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
10/30/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Pre-Inspection
|
11/5/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
11/18/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/2/2025
|
Partial Inspection
|
ANDREW DORSO
|
|
Special/Order Compliance
|
12/2/2025
|
Partial Inspection
|
ANDREW DORSO
|
|
Special/Order Compliance
|
12/2/2025
|
Partial Inspection
|
REGINA MENDEZ
|
|
Pre-Inspection
|
12/17/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
1/12/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
1/13/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/30/2026
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Final
|
6/2/2026
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Footing/Foundation/Slab
|
6/2/2026
|
Approved
|
DEANDRE HOFFMAN
|
|
Green Building Final
|
6/2/2026
|
Approved
|
DEANDRE HOFFMAN
|
|
Reinforced Concrete Frame
|
6/2/2026
|
Approved
|
DEANDRE HOFFMAN
|
|
SGSOV-Seismic Gas S/O Valve
|
6/2/2026
|
SGSOV Not Ready
|
DEANDRE HOFFMAN
|
|
Smoke Detectors
|
6/2/2026
|
Approved
|
DEANDRE HOFFMAN
|
|
Wood Frame
|
6/2/2026
|
Approved
|
DEANDRE HOFFMAN
|
|
Final
|
6/10/2026
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
SGSOV-Seismic Gas S/O Valve
|
6/10/2026
|
SGSOV Not Ready
|
DEANDRE HOFFMAN
|