13716 W VICTORY BLVD 1-32 91401

Certificate Information: 13716 W VICTORY BLVD 1-32 91401

Application / Permit
20010-10000-03277
Plan Check / Job No.
B20LA17068
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
CONSTRUCTION OF A NEW 5-STORY MIXED-USE COMMERCIAL AND AFFORDABLE RESIDENTIAL PROJECT. FOUR LEVELS RESIDENTIALTYP VA CONSTRUCTION, OVER ONE LEVEL RETAIL TYPE IA CONSTRUCTION, OVER ONE LEVEL OF SUBTERRANEAN PARKING TYPE 1A CONSTRUCTION PER 12.22 A25 DENSITY BONUS.
Permit Issued
Issued on 3/30/2022
Issuing Office
Current Status
Issued on 3/30/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/17/2020 APPLICANT
Assigned to Plan Check Engineer 10/15/2020 EUGENE BARBEAU
Disabled Access Plans Picked Up 10/19/2020 APPLICANT
Corrections Issued 10/30/2020 EUGENE BARBEAU
Quality Review Completed 11/5/2020 ALLEN MANALANSAN
Applicant returned to address corrections 3/23/2021 EUGENE BARBEAU
Green Plans Picked Up 3/23/2021 APPLICANT
Plan Check Approved 1/27/2022 EUGENE BARBEAU
Issued 3/30/2022 APPLICANT
Building Plans Picked Up 4/4/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 11/10/2020 GUILLERMO PETRA
Eng Process Fee Ord 176,300 Cleared 11/10/2020 GUILLERMO PETRA
Driveway location Cleared 11/24/2020 DURRE SHAMSI
Highway dedication Cleared 11/24/2020 GUILLERMO PETRA
Permit Cleared 11/24/2020 GUILLERMO PETRA
Hydrant and Access approval Cleared 2/16/2021 JEREMY CARTER
DCP conditions approval Cleared 3/4/2021 DORIS KWOK
Density Bonus 12.22.A.25 Cleared 3/4/2021 DORIS KWOK
Trees in Parkway Cleared 3/31/2021 JOHN KIM
Fire Marshal Fire Life Safety Cleared 4/27/2021 VIDAL GARCIA
Sewer availability Cleared 4/29/2021 GUILLERMO PETRA
Green Code Cleared 5/7/2021 EUGENE BARBEAU
Bicycle Parking Cleared 7/30/2021 LEE GUILBEAUX
DAS Clearance Cleared 7/30/2021 SHINE LIN
Building over 36-ft Cleared 8/26/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/26/2021 CALOSHA APPROVED
"Q" conditions Cleared 9/2/2021 ANACANY HURTADO
ZA Case Cleared 9/2/2021 ANACANY HURTADO
CPC Cleared 9/8/2021 ANACANY HURTADO
Frnt yard landscape/Water mgmt Cleared 9/8/2021 ANACANY HURTADO
Mechanical Car Lift Cleared 9/8/2021 WILLIAM JOHNS
Opn space landscape/Water mgmt Cleared 9/8/2021 ANACANY HURTADO
ZA Case Cleared 9/8/2021 ANACANY HURTADO
Low Impact Development Cleared 11/9/2021 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 11/12/2021 DAGOVERTO GUERRERO
Work Adjacent to Public Way Cleared 1/26/2022 LEE GUILBEAUX

Contact Information

Architect Tsai,, Kuo-Huei; Lic. No.: C33710 834 S BROADWAY SUITE 1206      LOS ANGELES, CA 90014
Contractor Ap Contractor; Lic. No.: 643672-B 10242 MONACO DRIVE      RANCHO CUCAMONGA, CA 91737
Engineer Daneshfar,, Kourosh Dan; Lic. No.: C68377 19722 ARMINTA ST      WINNETKA, CA 91306
Engineer Labib,, Youhanna T; Lic. No.: S4549 319 MAIN STREET      EL SEGUNDO, CA 90245
Geologist Feffer,, Joshua Rafael; Lic. No.: EG2138 12253 GORHAM AVE      LOS ANGELES, CA 90049
Landscape Architect Lir,, Yael; Lic. No.: LA3171 1010 SYCAMORE AVE STE 313      S PASADENA, CA 91030

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

SGSOV-Seismic Gas S/O Valve 6/25/2026   
Final 6/25/2026   

Inspection Request History

Footing/Foundation/Slab 8/16/2022 Partial Approval JOHN KITCKO
Deputy Shotcrete 8/24/2022 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/25/2022 Corrections Issued JOHN KITCKO
Deputy Shotcrete 8/26/2022 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/31/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/1/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 9/1/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/2/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 9/2/2022 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/7/2022 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/10/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 12/23/2022 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/28/2022 Partial Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/29/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 1/3/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/26/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 6/5/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/7/2023 Partial Approval JOHN KITCKO
Deputy Shotcrete 6/8/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 7/10/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/12/2023 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 7/13/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/26/2023 Corrections Issued JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/27/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/1/2023 Partial Inspection ANDREW DORSO
Deputy Shotcrete 8/3/2023 Conditional Approval KENNETH ROBERTS
Deputy Shotcrete 9/21/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/21/2023 Partial Approval JOHN KITCKO
Deputy Shotcrete 9/22/2023 Approved JOHN KITCKO
Deputy Shotcrete 9/22/2023 Conditional Approval JOHN KITCKO
Deputy Shotcrete 9/25/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/27/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/13/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/19/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/27/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 10/30/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/31/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/1/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/2/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/2/2023 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/8/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/8/2023 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 11/8/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/14/2023 Approved JOHN KITCKO
Masonry Wall/Backfill 11/14/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/15/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 11/27/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/7/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/12/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/13/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/14/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/15/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 1/3/2024 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/23/2024 Partial Approval JOHN KITCKO
Deputy Shotcrete 1/25/2024 Approved JOHN KITCKO
Deputy Shotcrete 1/26/2024 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/30/2024 Partial Approval JOHN KITCKO
Deputy Shotcrete 1/31/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 2/6/2024 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/7/2024 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/8/2024 Partial Approval JOHN KITCKO
Special/Order Compliance 3/4/2024 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 3/12/2024 Conditional Approval JOHN KITCKO
Deputy Drilled-In Anchors 3/26/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 3/26/2024 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 3/27/2024 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/2/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 4/9/2024 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/17/2024 Partial Inspection JOHN KITCKO
Deputy Wood Construction 4/18/2024 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 4/18/2024 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/19/2024 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/22/2024 Not Ready for Inspection JOHN KITCKO
Deputy Drilled-In Anchors 4/23/2024 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/24/2024 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/3/2024 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 5/10/2024 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/23/2024 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/31/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/7/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 6/12/2024 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/13/2024 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/13/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 6/14/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 6/20/2024 Conditional Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/20/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/25/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 6/27/2024 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/1/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 7/3/2024 Conditional Approval JOHN KITCKO
Deputy Wood Construction 7/18/2024 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 7/18/2024 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 7/19/2024 Not Ready for Inspection JOHN KITCKO
Insulation 8/8/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/19/2024 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/20/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/21/2024 Conditional Approval JOHN KITCKO
Deputy Wood Construction 9/25/2024 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/1/2024 Partial Approval JOHN KITCKO
Green Building Rough 11/20/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 11/20/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 11/20/2024 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/6/2024 Partial Inspection ANDREW DORSO
Insulation 12/10/2024 Not Ready for Inspection JOHN KITCKO
Insulation 12/13/2024 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/19/2024 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/13/2025 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/14/2025 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/17/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 1/23/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/23/2025 Not Ready for Inspection JOHN KITCKO
Insulation 1/24/2025 Partial Approval JOHN KITCKO
Drywall Nailing 1/28/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/28/2025 Partial Approval JOHN KITCKO
Drywall Nailing 1/30/2025 Partial Approval JOHN KITCKO
Green Building Rough 2/7/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/7/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/7/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 2/10/2025 Partial Approval JOHN KITCKO
Green Building Rough 2/11/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/11/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/11/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/12/2025 Partial Approval JOHN KITCKO
Insulation 2/12/2025 Partial Inspection JOHN KITCKO
Drywall Nailing 2/13/2025 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/13/2025 Partial Approval JOHN KITCKO
Insulation 2/13/2025 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/14/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/18/2025 Partial Approval JOHN KITCKO
Green Building Rough 2/19/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/19/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/19/2025 Partial Approval JOHN KITCKO
Drywall Nailing 2/20/2025 Not Ready for Inspection JOHN KITCKO
Insulation 2/20/2025 Partial Approval JOHN KITCKO
Drywall Nailing 2/21/2025 Not Ready for Inspection JOHN KITCKO
Insulation 2/21/2025 Not Ready for Inspection JOHN KITCKO
Insulation 2/25/2025 Not Ready for Inspection JOHN KITCKO
Insulation 2/26/2025 Partial Approval JOHN KITCKO
Drywall Nailing 3/3/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/4/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/5/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/6/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/7/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/10/2025 Partial Approval JOHN KITCKO
Drywall Nailing 3/11/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/13/2025 No Access for Inspection JOHN KITCKO
Drywall Nailing 3/14/2025 Partial Approval JOHN KITCKO
Drywall Nailing 3/18/2025 Partial Inspection JOHN KITCKO
Drywall Nailing 3/19/2025 Partial Inspection JOHN KITCKO
Drywall Nailing 3/20/2025 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 3/20/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/24/2025 Partial Approval ROBERT DAVIS
Insulation 3/27/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/28/2025 Partial Inspection JOHN KITCKO
Green Building Rough 4/1/2025 Partial Approval JOHN KITCKO
Insulation 4/1/2025 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 4/1/2025 Approved JOHN KITCKO
Verify Sprinkler Sign Off 4/1/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/1/2025 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/2/2025 Not Ready for Inspection JOHN KITCKO
Insulation 4/2/2025 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 4/3/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/4/2025 Not Ready for Inspection JOHN KITCKO
Insulation 4/4/2025 Partial Approval JOHN KITCKO
Wood Frame 4/4/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/7/2025 Partial Approval JOHN KITCKO
Insulation 4/7/2025 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 4/7/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 4/8/2025 No Access for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/8/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 4/9/2025 Partial Approval JOHN KITCKO
Insulation 4/10/2025 Not Ready for Inspection JOHN KITCKO
Green Building Rough 6/4/2025 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 6/4/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 6/4/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 6/4/2025 Partial Inspection JOHN KITCKO
Light Gage Steel Frame 6/5/2025 Conditional Approval JOHN KITCKO
Green Building Rough 6/6/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 6/6/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 6/6/2025 Not Ready for Inspection JOHN KITCKO
Green Building Rough 6/9/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 6/9/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 6/9/2025 Partial Approval JOHN KITCKO
Green Building Rough 6/12/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 6/12/2025 Conditional Approval ROBERT DAVIS
Verify Sprinkler Sign Off 6/12/2025 Partial Approval ROBERT DAVIS
Wood Frame 6/12/2025 Partial Approval ROBERT DAVIS
Insulation 6/16/2025 Not Ready for Inspection JOHN KITCKO
Insulation 6/17/2025 Partial Approval JOHN KITCKO
Insulation 6/18/2025 Partial Approval JOHN KITCKO
Drywall Nailing 6/24/2025 Not Ready for Inspection JOHN KITCKO
Structural Steel Frame 6/24/2025 Partial Approval JOHN KITCKO
Drywall Nailing 6/27/2025 Not Ready for Inspection JOHN KITCKO
Insulation 6/27/2025 Partial Approval JOHN KITCKO
Insulation 7/1/2025 Partial Approval JOHN KITCKO
Drywall Nailing 7/15/2025 Partial Approval JOHN KITCKO
Drywall Nailing 7/16/2025 Partial Approval JOHN KITCKO
Green Building Rough 7/16/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 7/16/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 7/16/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 7/17/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 7/18/2025 Partial Approval JOHN KITCKO
Green Building Rough 7/18/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 7/18/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 7/21/2025 Partial Approval GREGORY POMISH
Drywall Nailing 7/22/2025 Partial Approval JOHN KITCKO
Light Gage Steel Frame 8/12/2025 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 8/14/2025 Partial Inspection JOHN KITCKO
Green Building Rough 8/15/2025 Approved JOHN KITCKO
Verify Sprinkler Sign Off 8/15/2025 Approved JOHN KITCKO
Wood Frame 8/15/2025 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 8/27/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/29/2025 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 8/29/2025 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 9/2/2025 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 9/3/2025 Not Ready for Inspection JOHN KITCKO
Structural Steel Frame 9/3/2025 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 9/4/2025 Not Ready for Inspection JOHN KITCKO
Insulation 9/15/2025 Partial Approval JOHN KITCKO
Drywall Nailing 9/17/2025 Partial Approval JOHN KITCKO
Light Gage Steel Frame 9/17/2025 Partial Approval JOHN KITCKO
Drywall Nailing 9/23/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 9/25/2025 Partial Approval JOHN KITCKO
Drywall Nailing 9/26/2025 Partial Approval JOHN KITCKO
Light Gage Steel Frame 9/26/2025 Partial Approval JOHN KITCKO
Drywall Nailing 10/1/2025 Partial Approval JOHN KITCKO
Insulation 10/1/2025 Partial Approval JOHN KITCKO
Drywall Nailing 10/2/2025 Not Ready for Inspection JOHN KITCKO
Insulation 10/2/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 10/3/2025 Not Ready for Inspection JOHN KITCKO
Insulation 10/3/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 10/6/2025 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 10/6/2025 Partial Approval JOHN KITCKO
Drywall Nailing 10/10/2025 Partial Approval JOHN KITCKO
Drywall Nailing 10/14/2025 Partial Approval JOHN KITCKO
Light Gage Steel Frame 10/15/2025 Partial Approval JOHN KITCKO
Wood Frame 10/15/2025 Partial Inspection JOHN KITCKO
Drywall Nailing 10/23/2025 Partial Approval JOHN KITCKO
Light Gage Steel Frame 10/27/2025 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 10/27/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 10/27/2025 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 10/30/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 10/30/2025 Partial Approval JOHN KITCKO
Pre-Inspection 11/5/2025 Partial Inspection JOHN KITCKO
Drywall Nailing 11/18/2025 Partial Approval JOHN KITCKO
Drywall Nailing 12/2/2025 Partial Inspection ANDREW DORSO
Special/Order Compliance 12/2/2025 Partial Inspection ANDREW DORSO
Special/Order Compliance 12/2/2025 Partial Inspection REGINA MENDEZ
Pre-Inspection 12/17/2025 Partial Inspection JOHN KITCKO
Pre-Inspection 1/12/2026 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 1/13/2026 Partial Inspection JOHN KITCKO
Special/Order Compliance 1/30/2026 Partial Inspection DEANDRE HOFFMAN
Final 6/2/2026 Not Ready for Inspection DEANDRE HOFFMAN
Footing/Foundation/Slab 6/2/2026 Approved DEANDRE HOFFMAN
Green Building Final 6/2/2026 Approved DEANDRE HOFFMAN
Reinforced Concrete Frame 6/2/2026 Approved DEANDRE HOFFMAN
SGSOV-Seismic Gas S/O Valve 6/2/2026 SGSOV Not Ready DEANDRE HOFFMAN
Smoke Detectors 6/2/2026 Approved DEANDRE HOFFMAN
Wood Frame 6/2/2026 Approved DEANDRE HOFFMAN
Final 6/10/2026 Not Ready for Inspection DEANDRE HOFFMAN
SGSOV-Seismic Gas S/O Valve 6/10/2026 SGSOV Not Ready DEANDRE HOFFMAN