|
Grading Pre-Inspection
|
8/22/2022
|
Approved
|
DERRICK SPENCER
|
|
Posting Pre-Inspection
|
8/22/2022
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
8/22/2022
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/14/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
9/16/2022
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/16/2022
|
Approved
|
DERRICK SPENCER
|
|
Piling/Pier/Caisson
|
9/20/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
2/9/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
2/9/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
2/9/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/5/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
4/5/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
4/5/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
5/15/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
5/15/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
5/15/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/23/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/24/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/26/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/1/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
6/1/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
6/6/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/12/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
6/20/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
6/23/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
6/23/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/27/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/30/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
6/30/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
6/30/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
7/5/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
7/5/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
7/6/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
7/6/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/7/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
7/7/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
7/11/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/19/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
7/19/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/20/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/28/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
7/28/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/31/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/3/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
8/3/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/4/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/8/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
8/8/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/17/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
8/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
8/21/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/23/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
8/29/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
8/29/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/31/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
8/31/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/28/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/28/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
9/29/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
9/29/2023
|
Approved
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
9/29/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/2/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
10/26/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/31/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/2/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/9/2023
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
11/13/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/14/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/17/2023
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/20/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/27/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
11/28/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
11/29/2023
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
11/29/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/1/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
12/6/2023
|
Approved
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
12/6/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/26/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
12/28/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/4/2024
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
1/10/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
2/14/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/6/2024
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/6/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/7/2024
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
3/7/2024
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/26/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
3/27/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
3/28/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/29/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
3/29/2024
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/1/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
4/1/2024
|
Approved
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
4/1/2024
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
4/1/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
4/2/2024
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
4/5/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
4/5/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/9/2024
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
4/16/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
4/22/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
4/23/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
4/24/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
4/25/2024
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/25/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Wood Frame
|
4/25/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
4/30/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
5/1/2024
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
5/1/2024
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
5/1/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
5/2/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
5/3/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/3/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/6/2024
|
Conditional Approval
|
CASIMIR BRITTON
|
|
Deputy Steel/Welding
|
5/7/2024
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/8/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/8/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/9/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/10/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/10/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/13/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
5/14/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
5/15/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
5/16/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
5/17/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
5/22/2024
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
5/22/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/3/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
6/3/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
6/14/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
6/26/2024
|
Conditional Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
6/27/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
7/23/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
7/29/2024
|
Conditional Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
7/30/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
8/12/2024
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
8/26/2024
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Wood Construction
|
9/16/2024
|
Conditional Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
9/18/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/24/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/25/2024
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
9/25/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/26/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/27/2024
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
10/21/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
11/4/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
11/5/2024
|
No Access for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
12/12/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
2/27/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
3/5/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
3/11/2025
|
Corrections Issued
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
3/12/2025
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
3/25/2025
|
Partial Approval
|
RICARDO ROBLES
|
|
Wood Frame
|
3/25/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
4/7/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
4/9/2025
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
4/23/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
5/7/2025
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
5/15/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
6/3/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
6/17/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
9/8/2025
|
Approved
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
10/7/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
12/1/2025
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
12/16/2025
|
Approved
|
DERRICK SPENCER
|
|
Verify Rec and Parks Fee Memo
|
2/23/2026
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
5/6/2026
|
Approved
|
DERRICK SPENCER
|
|
Drywall Nailing
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Final
|
5/8/2026
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Green Building Final
|
5/8/2026
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
SGSOV-Seismic Gas S/O Valve
|
5/8/2026
|
SGSOV Approved
|
DERRICK SPENCER
|
|
Smoke Detectors
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Structural Steel Frame
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
5/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Green Building Final
|
7/15/2026
|
Not Ready for Inspection
|
DERRICK SPENCER
|