PLUMBING-Rough
|
11/28/2022
|
Approved
|
DANIEL ORRANTE
|
|
Footing/Foundation/Slab
|
12/20/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
1/19/2023
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/23/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
3/23/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
3/28/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
3/28/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/3/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/25/2023
|
Partial Approval
|
MICHAEL PELHAM
|
|
Footing/Foundation/Slab
|
6/20/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/22/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/22/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
6/22/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/18/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
7/18/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
7/18/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/24/2023
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
Footing/Foundation/Slab
|
7/28/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
8/7/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Sewer
|
8/7/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
8/8/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
8/9/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
8/10/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
8/11/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Footing/Foundation/Slab
|
8/15/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/15/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
8/15/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
8/15/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/17/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
8/17/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/29/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
8/29/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
8/29/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
8/31/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
9/13/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
9/15/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
9/18/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
9/18/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
9/18/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/20/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
9/20/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
9/22/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
9/25/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
9/29/2023
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Wood Frame
|
10/3/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
10/6/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
10/11/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
10/11/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
10/11/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
10/11/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/12/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
10/16/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/24/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/2/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
11/7/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
11/13/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
11/22/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
12/4/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
12/6/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Gas Test
|
12/7/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
12/7/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
12/8/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
12/11/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
12/18/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
12/27/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
1/17/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
1/17/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/18/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/18/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/19/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/23/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
1/23/2024
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
1/24/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/25/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
1/29/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
1/30/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
1/30/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
3/4/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/4/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/4/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/4/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/11/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/12/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/13/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2024
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
Footing/Foundation/Slab
|
3/19/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/26/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
3/26/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/27/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
3/27/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
3/29/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
3/29/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
4/4/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
4/8/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
4/8/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/25/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
4/25/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Insulation
|
4/26/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/29/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/1/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
5/3/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/6/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/9/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/10/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/13/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/15/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/16/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/16/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/17/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Wood Frame
|
5/20/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/21/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
5/21/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/22/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
5/24/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
6/3/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/4/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
6/10/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2024
|
Partial Approval
|
MICHAEL PELHAM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/12/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
6/14/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
6/20/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/26/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
6/27/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
6/27/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
6/28/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
7/2/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
7/2/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
7/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
7/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
7/3/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/3/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/9/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Insulation
|
7/9/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/11/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Insulation
|
7/11/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
7/17/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
7/19/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/23/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/24/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/24/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/25/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
7/30/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/30/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
8/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
8/2/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
8/5/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/5/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
8/5/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
8/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Rough-Elec/Plmb/HVAC
|
8/12/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/13/2024
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
8/16/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Wood Frame
|
8/16/2024
|
Corrections Issued
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
8/19/2024
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Wood Frame
|
8/19/2024
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Shower Pan
|
8/22/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/23/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
8/29/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
8/30/2024
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Insulation
|
9/4/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
9/5/2024
|
Partial Approval
|
REGINA MENDEZ
|
|
Drywall Nailing
|
9/9/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Shower Pan
|
9/10/2024
|
Approved
|
SEAN HAUPT
|
|
Wood Frame
|
9/10/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
9/11/2024
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
9/13/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
9/13/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/19/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
9/20/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
9/25/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
9/26/2024
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/27/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
9/27/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
10/1/2024
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
10/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
10/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/3/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
10/4/2024
|
Approved
|
CARLOS MATAMOROS
|
|
BUILDING-Rough-Frame
|
10/8/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
10/8/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
10/8/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
10/9/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
10/10/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/11/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
10/15/2024
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
10/15/2024
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
10/15/2024
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
10/16/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
10/16/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
10/16/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/18/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
10/21/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
10/21/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/21/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
10/21/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
10/23/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
10/23/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
10/24/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
10/29/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
10/29/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
11/4/2024
|
Partial Approval
|
BOBBY KEY
|
|
Special/Order Compliance
|
11/4/2024
|
Partial Approval
|
BOBBY KEY
|
|
Special/Order Compliance
|
11/4/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
11/5/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
11/5/2024
|
Partial Inspection
|
BOBBY KEY
|
|
Interior/Exterior Lathing
|
11/8/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
11/13/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
11/13/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
11/14/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
11/14/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
11/18/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
11/25/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
11/25/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
11/25/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
12/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
12/16/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/30/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
1/15/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Drywall Nailing
|
1/17/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
1/17/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/24/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
1/31/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
2/11/2025
|
Partial Approval
|
BOBBY KEY
|
|
ELECTRICAL-Rough
|
2/25/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
2/25/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
2/26/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
2/27/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
3/4/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
3/5/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
3/24/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
3/25/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
3/27/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
3/28/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
4/21/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
4/21/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
4/21/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
6/9/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
6/12/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
6/13/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
7/3/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
7/11/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/11/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
7/14/2025
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
ELECTRICAL-Final
|
7/18/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/18/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
7/21/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
7/21/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
7/22/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
7/22/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
7/22/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
7/23/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
7/25/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
8/8/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
8/12/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
11/4/2025
|
Approved
|
ANDREW NAVE
|
|
Final
|
11/4/2025
|
Corrections Issued
|
ANDREW NAVE
|
|
Footing/Foundation/Slab
|
11/4/2025
|
Approved
|
ANDREW NAVE
|
|
Reinforced Concrete Frame
|
11/4/2025
|
Approved
|
ANDREW NAVE
|
|
SGSOV-Seismic Gas S/O Valve
|
11/4/2025
|
SGSOV Not Ready
|
ANDREW NAVE
|
|
Smoke Detectors
|
11/4/2025
|
Approved
|
ANDREW NAVE
|
|
Structural Steel Frame
|
11/4/2025
|
Approved
|
ANDREW NAVE
|
|
Final
|
11/14/2025
|
Corrections Issued
|
SEAN HAUPT
|
|
SGSOV-Seismic Gas S/O Valve
|
11/14/2025
|
SGSOV Approved
|
SEAN HAUPT
|
|
Final
|
12/30/2025
|
Not Ready for Inspection
|
ANDREW NAVE
|
|
Final
|
1/21/2026
|
OK to Issue CofO
|
CHRISTOPHER WILSON
|