1400 S GLENVILLE DR 90035

Certificate Information: 1400 S GLENVILLE DR 90035

Application / Permit
20010-10000-02651
Plan Check / Job No.
B20LA14126
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 7-story, 64 unit (8 VLI units = 12%) mixed-use building with 5 levels of Type IIIA apartments over 1 level of amenity spaces of Type IA over 1 level ground-floor retail and parking with residential lobby of Type IA over 2 levels of Type IA basement parking. Per 12.22 A.25 incentives.
Permit Issued
Issued on 5/4/2023
Issuing Office
Metro
Current Status
Issued on 5/4/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 5/1/2023 RODOLFO ARIAS
Plan Check Approved 5/3/2023 RODOLFO ARIAS
Issued 5/4/2023 APPLICANT
TCO Issued (Expire Date: 08-24-2026) 2/25/2026 VASIL MIHALEV

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/15/2021 ANTHONY MAINEZ
Permit Cleared 5/24/2021 HISASHI KOBAYAKAWA
Address approval Cleared 6/1/2021 ANTHONY MAINEZ
Trees in Parkway Cleared 6/28/2021 JOHN KIM
Low Impact Development Cleared 7/12/2021 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 7/19/2021 DENNIS BRAGIN
Highway dedication Cleared 7/21/2021 RAYMOND MUGAMBWA
Sewer availability Cleared 9/10/2021 DINAH GARIN
Internal circulation Cleared 10/1/2021 PEDRO AYALA
Green Code Cleared 10/13/2021 AARON COSTA
GPI Written Notices Cleared 10/26/2021 RODOLFO ARIAS
Grading Pre-Inspection Cleared 10/26/2021 RODOLFO ARIAS
Excavation more than 5-ft deep Cleared 10/27/2021 CALOSHA APPROVED
Hydrant and Access approval Cleared 11/20/2021 JOHN CONNEALLY
Encroachment in public way Cleared 11/23/2021 TRACY TATE
Density Bonus 12.22.A.25 Cleared 2/17/2022 MICHAEL ZIRBES
Construction near power lines Cleared 4/14/2022 RIDWAN HARDY
Construction within easement Cleared 4/14/2022 RIDWAN HARDY
Fire Marshall Fire Life Safety Cleared 5/6/2022 VIDAL GARCIA
Building over 36-ft Cleared 5/23/2022 CALOSHA APPROVED
DAS Clearance Cleared 5/26/2022 RODOLFO ARIAS
Bicycle Parking Cleared 8/8/2022 ANTHONY MAINEZ
Food Service Establishment Cleared 9/6/2022 PAWAN VERMA
Work Adjacent to Public Way Cleared 4/14/2023 SAUL GARCIA
Comm Cor/Mini-Mall Cleared 4/19/2023 JAZMIN ROQUE
Frnt yard landscape/Water mgmt Cleared 4/19/2023 JAZMIN ROQUE
Opn space landscape/Water mgmt Cleared 4/19/2023 JAZMIN ROQUE
Site Plan review Cleared 4/19/2023 JAZMIN ROQUE
ZA Case Cleared 4/19/2023 JAZMIN ROQUE
CPC Cleared 4/20/2023 JAZMIN ROQUE
Food establishment approval Cleared 4/20/2023 LACDHS APPROVED

Contact Information

Architect Opasinski,, Ewa; Lic. No.: C33952 4600 DON LORENZO DRIVE # 15      LOS ANGELES, CA 90008
Contractor Frymer Construction; Lic. No.: 860661-B 11675 NATIONAL BLVD      LOS ANGELES, CA 90064
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Krief,, Dan Dov; Lic. No.: C76041 6420 WILSHIRE BLVD STE 1000      LOS ANGELES, CA 90048
Engineer Nishi,, Thomas Yoshimasa; Lic. No.: S4030 1615 BUCKINGHAM RD      LOS ANGELES, CA 90019
Engineer Tang,, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 7/27/2023 Conditional Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 7/27/2023 Partial Approval SORIN CIRSTOIU
METHANE-Rough 8/2/2023 Partial Inspection SORIN CIRSTOIU
METHANE-Subgrade 8/8/2023 Partial Approval SORIN CIRSTOIU
METHANE-Final 8/17/2023 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 8/28/2023 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 9/12/2023 Approved DERRICK SPENCER
Footing/Foundation/Slab 9/12/2023 Partial Approval DERRICK SPENCER
METHANE-Barrier 9/12/2023 Approved DERRICK SPENCER
METHANE-Subgrade 9/12/2023 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/13/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 9/26/2023 Conditional Approval MICHAEL PETRUSKO
Green Building Rough 9/26/2023 Approved DERRICK SPENCER
METHANE-Rough 9/26/2023 Approved DERRICK SPENCER
Reinforced Concrete Frame 9/26/2023 Partial Approval DERRICK SPENCER
Verify Sprinkler Sign Off 9/26/2023 Approved DERRICK SPENCER
Deputy Reinf. Masonry 10/3/2023 Approved DERRICK SPENCER
Reinforced Concrete Frame 10/3/2023 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 10/3/2023 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/5/2023 Conditional Approval ALAN NOVAK
Deputy Shotcrete 10/5/2023 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/6/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Shotcrete 10/10/2023 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 10/11/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 10/20/2023 Conditional Approval MICHAEL PETRUSKO
Reinforced Concrete Frame 10/20/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 10/31/2023 Conditional Approval DERRICK SPENCER
Reinforced Concrete Frame 10/31/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 11/2/2023 Approved DERRICK SPENCER
Deputy Reinf. Concrete 11/3/2023 Approved DERRICK SPENCER
Deputy Reinf. Concrete 11/9/2023 Conditional Approval DAVID TSAU
Deputy Reinf. Concrete 11/13/2023 Approved DERRICK SPENCER
Reinforced Concrete Frame 11/13/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 11/16/2023 Approved DERRICK SPENCER
Deputy Reinf. Masonry 11/16/2023 Approved DERRICK SPENCER
Deputy Reinf. Concrete 11/17/2023 Approved FARHAD DADBIN
Deputy Shotcrete 11/17/2023 Approved FARHAD DADBIN
Reinforced Concrete Frame 11/17/2023 Partial Approval GRANT WOODS
Deputy Reinf. Masonry 11/21/2023 Approved DERRICK SPENCER
Deputy Shotcrete 11/21/2023 Approved DERRICK SPENCER
Reinforced Concrete Frame 11/21/2023 Partial Approval DERRICK SPENCER
Deputy Shotcrete 11/22/2023 Approved DERRICK SPENCER
Deputy Reinf. Masonry 11/27/2023 Conditional Approval DERRICK SPENCER
Deputy Reinf. Concrete 11/29/2023 Approved DERRICK SPENCER
Deputy Reinf. Masonry 11/29/2023 Approved DERRICK SPENCER
Reinforced Concrete Frame 11/29/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 12/26/2023 Approved DERRICK SPENCER
Footing/Foundation/Slab 12/26/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 12/27/2023 Approved DERRICK SPENCER
Reinforced Concrete Frame 1/4/2024 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 1/5/2024 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 1/8/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 1/12/2024 Approved DERRICK SPENCER
Deputy Shotcrete 1/12/2024 Approved DERRICK SPENCER
Reinforced Concrete Frame 1/12/2024 Approved DERRICK SPENCER
Deputy Shotcrete 1/16/2024 Approved DERRICK SPENCER
Deputy Reinf. Concrete 1/18/2024 Conditional Approval DERRICK SPENCER
Deputy Shotcrete 1/18/2024 Conditional Approval DERRICK SPENCER
Footing/Foundation/Slab 2/14/2024 Not Ready for Inspection PAUL DAVIDSON
Footing/Foundation/Slab 2/15/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 2/16/2024 Conditional Approval PAUL DAVIDSON
Reinforced Concrete Frame 2/27/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 3/1/2024 Approved DERRICK SPENCER
Deputy Shotcrete 3/1/2024 Approved DERRICK SPENCER
Masonry Wall/Backfill 3/1/2024 Partial Approval DERRICK SPENCER
Masonry Wall/Backfill 3/5/2024 Partial Approval DERRICK SPENCER
Deputy Shotcrete 3/6/2024 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/2/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 4/3/2024 Conditional Approval PAUL DAVIDSON
Reinforced Concrete Frame 4/3/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 4/10/2024 Conditional Approval PAUL DAVIDSON
Masonry Wall/Backfill 4/10/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 4/11/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 5/7/2024 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 5/7/2024 Partial Approval PAUL DAVIDSON
Deputy Wood Construction 5/15/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 5/16/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 5/17/2024 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 5/29/2024 Partial Approval PAUL DAVIDSON
Deputy Wood Construction 5/30/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 5/31/2024 Conditional Approval RICARDO ROBLES
Deputy Wood Construction 6/5/2024 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 6/7/2024 Conditional Approval GRANT WOODS
Deputy Wood Construction 6/12/2024 Conditional Approval MICHAEL PETRUSKO
Floor/Roof Diaphrgm/Shear Wall 6/12/2024 Approved MICHAEL PETRUSKO
Deputy Wood Construction 6/13/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 6/14/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 6/18/2024 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 6/21/2024 Partial Approval PAUL DAVIDSON
Deputy Wood Construction 6/24/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 6/25/2024 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 6/25/2024 Partial Approval PAUL DAVIDSON
Deputy Wood Construction 6/26/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 6/27/2024 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 6/28/2024 Conditional Approval PAUL DAVIDSON
Insulation 7/9/2024 Partial Inspection PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/18/2024 Partial Inspection PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/22/2024 Partial Approval PAUL DAVIDSON
Deputy Wood Construction 7/29/2024 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/29/2024 Partial Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/30/2024 Partial Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 7/31/2024 Partial Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 8/1/2024 Partial Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 8/7/2024 Not Ready for Inspection PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 8/9/2024 Partial Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 8/12/2024 Not Ready for Inspection PAUL DAVIDSON
Insulation 8/14/2024 Not Ready for Inspection FARHAD DADBIN
Insulation 8/15/2024 Partial Approval FARHAD DADBIN
Insulation 8/16/2024 Not Ready for Inspection FARHAD DADBIN
Deputy Steel/Welding 8/19/2024 Approved DERRICK SPENCER
Insulation 8/19/2024 Not Ready for Inspection CASIMIR BRITTON
Insulation 8/20/2024 Partial Approval FARHAD DADBIN
Insulation 8/20/2024 Partial Approval PAUL DAVIDSON
Insulation 8/21/2024 Not Ready for Inspection PAUL DAVIDSON
Insulation 8/23/2024 Partial Approval PAUL DAVIDSON
Wood Frame 8/23/2024 Partial Approval PAUL DAVIDSON
Deputy Steel/Welding 8/27/2024 Conditional Approval DAVID TSAU
Floor/Roof Diaphrgm/Shear Wall 9/5/2024 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 9/10/2024 Conditional Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/12/2024 Not Ready for Inspection DANIEL VARNUM
Deputy Shotcrete 9/13/2024 Conditional Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/13/2024 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 9/13/2024 Partial Approval DERRICK SPENCER
Drywall Nailing 9/17/2024 Partial Approval DERRICK SPENCER
Insulation 9/17/2024 Partial Approval DERRICK SPENCER
Insulation 9/18/2024 Partial Inspection DANIEL VARNUM
Drywall Nailing 9/20/2024 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/24/2024 Partial Approval DANIEL VARNUM
Drywall Nailing 9/27/2024 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/30/2024 Not Ready for Inspection DERRICK SPENCER
Deputy Steel/Welding 10/1/2024 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 10/1/2024 Partial Approval DERRICK SPENCER
Drywall Nailing 10/3/2024 Partial Approval DANIEL VARNUM
Insulation 10/3/2024 Partial Approval DANIEL VARNUM
Insulation 10/9/2024 Partial Approval DANIEL VARNUM
Insulation 10/15/2024 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 10/16/2024 Not Ready for Inspection DANIEL VARNUM
Insulation 10/16/2024 Not Ready for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 10/17/2024 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 10/21/2024 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 10/31/2024 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 11/4/2024 Conditional Approval DANIEL VARNUM
Insulation 11/5/2024 Partial Approval PAUL DAVIDSON
Deputy Steel/Welding 11/6/2024 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 11/8/2024 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 11/8/2024 Conditional Approval PAUL DAVIDSON
Insulation 11/8/2024 Partial Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 11/12/2024 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 11/12/2024 Conditional Approval PAUL DAVIDSON
Insulation 11/12/2024 Partial Approval PAUL DAVIDSON
Insulation 11/13/2024 Partial Approval PAUL DAVIDSON
Deputy Steel/Welding 11/21/2024 Conditional Approval PAUL DAVIDSON
Insulation 11/21/2024 Partial Approval PAUL DAVIDSON
Structural Steel Frame 11/21/2024 Partial Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 11/27/2024 Not Ready for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 12/3/2024 Partial Approval PAUL DAVIDSON
Drywall Nailing 12/10/2024 Partial Approval PAUL DAVIDSON
Insulation 12/17/2024 Not Ready for Inspection DANIEL VARNUM
Insulation 12/18/2024 No Access for Inspection DANIEL VARNUM
Insulation 12/20/2024 Partial Approval DANIEL VARNUM
Drywall Nailing 12/27/2024 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 12/30/2024 Partial Approval DANIEL VARNUM
Insulation 1/8/2025 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 1/8/2025 Not Ready for Inspection DANIEL VARNUM
Insulation 1/9/2025 Not Ready for Inspection DANIEL VARNUM
Wood Frame 1/9/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 1/14/2025 Partial Approval DERRICK SPENCER
Insulation 1/15/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 1/17/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 1/21/2025 Partial Approval DANIEL VARNUM
Wood Frame 1/21/2025 Partial Approval DANIEL VARNUM
Insulation 1/23/2025 Partial Approval DERRICK SPENCER
Drywall Nailing 1/27/2025 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 1/27/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 1/30/2025 Partial Approval DANIEL VARNUM
Wood Frame 1/30/2025 Partial Approval DANIEL VARNUM
Insulation 2/3/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 2/6/2025 Partial Approval DANIEL VARNUM
Insulation 2/6/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 2/11/2025 Partial Approval DANIEL VARNUM
Insulation 2/11/2025 Partial Approval DANIEL VARNUM
Insulation 2/12/2025 Not Ready for Inspection PAUL DAVIDSON
Wood Frame 2/12/2025 Not Ready for Inspection PAUL DAVIDSON
Deputy Drilled-In Anchors 2/13/2025 Conditional Approval PAUL DAVIDSON
Insulation 2/13/2025 Partial Approval PAUL DAVIDSON
Insulation 2/18/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 2/21/2025 Partial Approval PAUL DAVIDSON
Drywall Nailing 2/25/2025 Partial Approval DANIEL VARNUM
Insulation 2/25/2025 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 2/28/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 3/5/2025 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 3/7/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/11/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/12/2025 Partial Approval PAUL DAVIDSON
Special/Order Compliance 3/13/2025 Partial Inspection PAUL DAVIDSON
Light Gage Steel Frame 3/14/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/18/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/20/2025 Partial Approval PAUL DAVIDSON
Drywall Nailing 3/26/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/28/2025 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/2/2025 Partial Approval VASIL MIHALEV
Light Gage Steel Frame 4/21/2025 Approved VASIL MIHALEV
Insulation 5/5/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 5/6/2025 Partial Approval DANIEL VARNUM
Insulation 5/7/2025 Partial Inspection DANIEL VARNUM
Drywall Nailing 5/8/2025 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 5/15/2025 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 5/19/2025 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 6/9/2025 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 6/10/2025 Conditional Approval PAUL DAVIDSON
Interior/Exterior Lathing 6/12/2025 Partial Approval FARHAD DADBIN
Deputy Steel/Welding 6/13/2025 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 6/16/2025 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 6/18/2025 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 6/18/2025 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 6/20/2025 Conditional Approval PAUL DAVIDSON
Interior/Exterior Lathing 6/23/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/23/2025 Partial Approval PAUL DAVIDSON
Wood Frame 6/25/2025 Conditional Approval PAUL DAVIDSON
Wood Frame 7/1/2025 Partial Approval PAUL DAVIDSON
Drywall Nailing 7/8/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 7/14/2025 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 7/17/2025 Not Ready for Inspection DANIEL VARNUM
Insulation 7/21/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 7/21/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 8/4/2025 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 8/7/2025 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 8/8/2025 Conditional Approval DANIEL VARNUM
Deputy Reinf. Masonry 8/11/2025 Conditional Approval PAUL DAVIDSON
Drywall Nailing 8/15/2025 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 8/19/2025 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 8/22/2025 Partial Approval DANIEL VARNUM
Drywall Nailing 8/29/2025 Approved DANIEL VARNUM
Light Gage Steel Frame 9/5/2025 Approved VASIL MIHALEV
Light Gage Steel Frame 10/8/2025 Approved DANIEL VARNUM
Interior/Exterior Lathing 11/12/2025 Partial Approval DANIEL VARNUM
Pre-Inspection 11/24/2025 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 12/2/2025 Partial Inspection PAUL DAVIDSON
Deputy Other (see comments) 1/13/2026 Approved DERRICK SPENCER
Final 2/4/2026 Not Ready for Inspection PAUL DAVIDSON
Footing/Foundation/Slab 2/4/2026 Approved PAUL DAVIDSON
Green Building Final 2/4/2026 Approved PAUL DAVIDSON
Reinforced Concrete Frame 2/4/2026 Approved PAUL DAVIDSON
SGSOV-Seismic Gas S/O Valve 2/4/2026 SGSOV Not Ready PAUL DAVIDSON
Smoke Detectors 2/4/2026 Not Ready for Inspection PAUL DAVIDSON
Structural Steel Frame 2/4/2026 Approved PAUL DAVIDSON
Wood Frame 2/4/2026 Approved PAUL DAVIDSON
Pre-Inspection 2/10/2026 Partial Inspection PAUL DAVIDSON