Deputy Reinf. Concrete
|
7/27/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
METHANE-Rough
|
8/2/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
METHANE-Subgrade
|
8/8/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
METHANE-Final
|
8/17/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
8/28/2023
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
9/12/2023
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
9/12/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
9/12/2023
|
Approved
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
9/12/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/13/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
9/26/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Green Building Rough
|
9/26/2023
|
Approved
|
DERRICK SPENCER
|
|
METHANE-Rough
|
9/26/2023
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
9/26/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
9/26/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
10/3/2023
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
10/3/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
10/3/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/5/2023
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Shotcrete
|
10/5/2023
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
10/6/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Shotcrete
|
10/10/2023
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
10/11/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
10/20/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Reinforced Concrete Frame
|
10/20/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/31/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
10/31/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/2/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/3/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/9/2023
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
11/13/2023
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
11/13/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/16/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
11/16/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/17/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
11/17/2023
|
Approved
|
FARHAD DADBIN
|
|
Reinforced Concrete Frame
|
11/17/2023
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
11/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
11/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
11/21/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
11/22/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
11/27/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/29/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
11/29/2023
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
11/29/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/26/2023
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
12/26/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/27/2023
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
1/4/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
1/5/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/8/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
1/12/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
1/12/2024
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
1/12/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
1/16/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/18/2024
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
1/18/2024
|
Conditional Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
2/14/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
2/15/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/16/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
2/27/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
3/1/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
3/1/2024
|
Approved
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
3/1/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
3/5/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
3/6/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/2/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/3/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
4/3/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/10/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Masonry Wall/Backfill
|
4/10/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/11/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
5/7/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/7/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
5/15/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
5/16/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
5/17/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/29/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
5/30/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
5/31/2024
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Wood Construction
|
6/5/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/7/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
6/12/2024
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/12/2024
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Wood Construction
|
6/13/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
6/14/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
6/18/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/21/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
6/24/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
6/25/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/25/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
6/26/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
6/27/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
6/28/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Insulation
|
7/9/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/22/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
7/29/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/29/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/31/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/7/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/12/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Insulation
|
8/14/2024
|
Not Ready for Inspection
|
FARHAD DADBIN
|
|
Insulation
|
8/15/2024
|
Partial Approval
|
FARHAD DADBIN
|
|
Insulation
|
8/16/2024
|
Not Ready for Inspection
|
FARHAD DADBIN
|
|
Deputy Steel/Welding
|
8/19/2024
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
8/19/2024
|
Not Ready for Inspection
|
CASIMIR BRITTON
|
|
Insulation
|
8/20/2024
|
Partial Approval
|
FARHAD DADBIN
|
|
Insulation
|
8/20/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
8/21/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Insulation
|
8/23/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
8/23/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
8/27/2024
|
Conditional Approval
|
DAVID TSAU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/5/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
9/10/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/12/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
9/13/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/13/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
9/13/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
9/17/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
9/17/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
9/18/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
9/20/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/24/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
9/27/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/30/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
10/1/2024
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/1/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
10/3/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
10/3/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
10/9/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
10/15/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/16/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Insulation
|
10/16/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/17/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
10/21/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
10/31/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
11/4/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Insulation
|
11/5/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
11/6/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
11/8/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
11/8/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Insulation
|
11/8/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
11/12/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
11/12/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Insulation
|
11/12/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
11/13/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
11/21/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Insulation
|
11/21/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Structural Steel Frame
|
11/21/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/27/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/3/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
12/10/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
12/17/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Insulation
|
12/18/2024
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Insulation
|
12/20/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
12/27/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
12/30/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
1/8/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
1/8/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Insulation
|
1/9/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
1/9/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
1/14/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
1/15/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
1/17/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
1/21/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
1/21/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
1/23/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
1/27/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
1/27/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
1/30/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
1/30/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
2/3/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/6/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
2/6/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/11/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
2/11/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
2/12/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Wood Frame
|
2/12/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
2/13/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Insulation
|
2/13/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
2/18/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/21/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
2/25/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
2/25/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
2/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
3/5/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
3/7/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
3/11/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
3/12/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
3/13/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
3/14/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
3/18/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
3/20/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
3/26/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
3/28/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
4/2/2025
|
Partial Approval
|
VASIL MIHALEV
|
|
Light Gage Steel Frame
|
4/21/2025
|
Approved
|
VASIL MIHALEV
|
|
Insulation
|
5/5/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
5/6/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
5/7/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
5/8/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
5/15/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
5/19/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
6/9/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/10/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
6/12/2025
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Steel/Welding
|
6/13/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/16/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/18/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/18/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/20/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
6/23/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
6/23/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
6/25/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
7/1/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
7/8/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
7/14/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
7/17/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Insulation
|
7/21/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
7/21/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
8/4/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
8/7/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
8/8/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
8/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
8/15/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
8/19/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
8/22/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
8/29/2025
|
Approved
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
9/5/2025
|
Approved
|
VASIL MIHALEV
|
|
Light Gage Steel Frame
|
10/8/2025
|
Approved
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
11/12/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Pre-Inspection
|
11/24/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
12/2/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Deputy Other (see comments)
|
1/13/2026
|
Approved
|
DERRICK SPENCER
|
|
Final
|
2/4/2026
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
2/4/2026
|
Approved
|
PAUL DAVIDSON
|
|
Green Building Final
|
2/4/2026
|
Approved
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
2/4/2026
|
Approved
|
PAUL DAVIDSON
|
|
SGSOV-Seismic Gas S/O Valve
|
2/4/2026
|
SGSOV Not Ready
|
PAUL DAVIDSON
|
|
Smoke Detectors
|
2/4/2026
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Structural Steel Frame
|
2/4/2026
|
Approved
|
PAUL DAVIDSON
|
|
Wood Frame
|
2/4/2026
|
Approved
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
2/10/2026
|
Partial Inspection
|
PAUL DAVIDSON
|