|
Deputy Steel/Welding
|
3/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
5/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
5/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
5/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
5/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
5/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
5/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
5/24/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/24/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
5/26/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/26/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
5/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/7/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/7/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/9/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/9/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
6/10/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/14/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/14/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/25/2021
|
Conditional Approval
|
LEOPOLDO MENDOZA
|
|
Footing/Foundation/Slab
|
6/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/29/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/29/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
6/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/12/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
7/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/16/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/19/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/19/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/22/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/22/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/30/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/3/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
8/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/6/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/6/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/31/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/31/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/1/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/1/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/17/2021
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/17/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/1/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/18/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
10/18/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
10/19/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
10/20/2021
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Deputy Pre-Stress Concrete
|
10/21/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
10/22/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
10/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
11/1/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
11/8/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
11/8/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Pre-Stress Concrete
|
11/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/17/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
11/18/2021
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
11/19/2021
|
Conditional Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
12/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
12/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
12/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
12/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
12/7/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
12/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
12/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
12/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
12/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
12/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
1/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
1/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
1/19/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/19/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/17/2022
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Deputy Reinf. Masonry
|
2/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
4/18/2022
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Steel/Welding
|
4/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Deputy Steel/Welding
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/31/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/2/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
6/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
T-Bar Ceiling
|
6/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
7/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
7/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
7/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
7/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
7/13/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
7/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
11/5/2024
|
Approved
|
JAMES POWERS
|
|
Final
|
11/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/5/2024
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
11/5/2024
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/5/2024
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/5/2024
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
11/5/2024
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
11/5/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/5/2024
|
Approved
|
JAMES POWERS
|
|
Final
|
3/11/2025
|
OK for TCO
|
JAMES POWERS
|
|
Final
|
3/14/2025
|
OK to Issue CofO
|
JAMES POWERS
|