Pre-Inspection
|
11/16/2023
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
11/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/29/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
4/15/2024
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/15/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
4/15/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
4/15/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
4/16/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/17/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/18/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
4/18/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
4/18/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
4/18/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/25/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
4/25/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Subgrade
|
4/25/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
4/29/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
4/29/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Subgrade
|
4/29/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Methane Barrier
|
4/30/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/30/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Methane Barrier
|
5/2/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Methane Barrier
|
5/6/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
5/7/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
5/7/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Subgrade
|
5/7/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/8/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/9/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/10/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/13/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/14/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/15/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/15/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/16/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/16/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
5/16/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
5/16/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Subgrade
|
5/16/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/17/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/17/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
5/17/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
5/18/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
5/18/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Subgrade
|
5/18/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/20/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/21/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/21/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/22/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/22/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
5/22/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
5/22/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Subgrade
|
5/22/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
5/23/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
5/23/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
5/23/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Subgrade
|
5/23/2024
|
Approved
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/24/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
5/24/2024
|
Pending Review
|
|
|
Deputy Reinf. Masonry
|
5/28/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/30/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/31/2024
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Reinf. Masonry
|
6/4/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/5/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/5/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/6/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/6/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/7/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
6/7/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Methane Barrier
|
6/10/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/10/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
6/10/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
6/10/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/13/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
6/13/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
6/13/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/14/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Methane Barrier
|
6/18/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/18/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
6/18/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
6/18/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
6/18/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/20/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
6/20/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/26/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/26/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
6/26/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
6/26/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/3/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
7/3/2024
|
Corrections Issued
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
7/3/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/8/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
7/12/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
7/12/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
7/15/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Methane Barrier
|
7/26/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
7/30/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
7/30/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
7/30/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/31/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
8/22/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/22/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
8/22/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
8/22/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
8/28/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
METHANE-Barrier
|
8/28/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Special/Order Compliance
|
8/29/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Deputy Reinf. Concrete
|
8/30/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/3/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/5/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
9/5/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
METHANE-Barrier
|
9/5/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/6/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
9/6/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/9/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
9/9/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
9/10/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/10/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/10/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
METHANE-Barrier
|
9/10/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
9/10/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/11/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/11/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/12/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/12/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
METHANE-Barrier
|
9/12/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
9/12/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/13/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/13/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/17/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
9/17/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
9/17/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
9/19/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Masonry Wall/Backfill
|
9/19/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/20/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/23/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/25/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/24/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
10/24/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
METHANE-Barrier
|
10/24/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/25/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/25/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
11/15/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
11/15/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
12/2/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
12/2/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
12/12/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/12/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
12/23/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Wood Construction
|
1/9/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
1/9/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Wood Construction
|
1/21/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
1/22/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Wood Construction
|
1/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Insulation
|
2/3/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/10/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
2/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
2/24/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Wood Construction
|
2/27/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/5/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Wood Frame
|
3/7/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
3/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/11/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
3/12/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
3/13/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
3/13/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Insulation
|
3/18/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
3/19/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
3/27/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/28/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
4/2/2025
|
Approved
|
VASIL MIHALEV
|
|
Wood Frame
|
4/8/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
4/9/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
4/15/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
4/16/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
4/16/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
5/13/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
5/14/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
5/15/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
5/16/2025
|
Partial Approval
|
RICARDO ROBLES
|
|
Wood Frame
|
5/19/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
5/21/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Wood Frame
|
5/23/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
5/27/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
5/30/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
6/4/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
6/6/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
6/10/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
6/23/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Insulation
|
6/24/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Insulation
|
6/26/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
6/30/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
7/15/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
7/22/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Insulation
|
7/28/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
8/11/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
8/18/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
8/25/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
8/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
8/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
9/10/2025
|
Approved
|
VASIL MIHALEV
|
|
Interior/Exterior Lathing
|
9/23/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
10/15/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
10/15/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Special/Order Compliance
|
11/4/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Special/Order Compliance
|
1/15/2026
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
2/3/2026
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
4/3/2026
|
Corrections Issued
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
4/16/2026
|
Approved
|
PAUL DAVIDSON
|
|
Final
|
4/24/2026
|
OK to Issue CofO
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
Green Building Final
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
Green Building Rough
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
METHANE-Barrier
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
METHANE-Final
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
METHANE-Rough
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
Reinforced Masonry Frame
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
SGSOV-Seismic Gas S/O Valve
|
4/24/2026
|
SGSOV Approved
|
PAUL DAVIDSON
|
|
Smoke Detectors
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|
|
Verify Sprinkler Sign Off
|
4/24/2026
|
Approved
|
PAUL DAVIDSON
|