1516 N STONE CANYON ROAD 90077

Certificate Information: 1516 N STONE CANYON ROAD 90077

Application / Permit
20010-10000-02076
Plan Check / Job No.
B20LA10803
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 3 STORY 17480 S.F. SINGLE FAMILY DWELLING . SEE COMMENTS 1 OF 3.
Permit Issued
Issued on 6/24/2021
Issuing Office
Metro
Current Status
CofO Issued on 4/28/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/29/2020 APPLICANT
Assigned to Plan Check Engineer 7/24/2020 SERGIO GUTIERREZ
Corrections Issued 8/5/2020 SERGIO GUTIERREZ
Quality Review Completed 8/18/2020 KESETE HAREGOT
Applicant returned to address corrections 12/15/2020 SERGIO GUTIERREZ
Plan Check Approved 4/30/2021 SERGIO GUTIERREZ
No Progress 6/4/2021 SERGIO GUTIERREZ
Plan Check Approved 6/4/2021 SERGIO GUTIERREZ
Issued 6/24/2021 APPLICANT
Building Plans Picked Up 6/24/2021 APPLICANT
CofO in Progress 4/25/2025 MICHAEL PELHAM
Permit Finaled 4/28/2025 RICHARD STEINBACH
CofO Issued 4/28/2025 RICHARD STEINBACH
Permit Finaled 4/28/2025 RICHARD STEINBACH

Permit Application Clearance Information

Hydrant and Access approval Cleared 8/6/2020 MATTHEW CRAIG
BHO/Hillside ordinance Cleared 8/13/2020 CATHERINE ADROVER
BHO/Hillside ordinance Cleared 8/13/2020 CATHERINE ADROVER
BHO/Hillside ordinance Cleared 8/13/2020 CATHERINE ADROVER
BHO/Hillside ordinance Cleared 8/13/2020 CATHERINE ADROVER
BHO/Hillside ordinance Cleared 8/13/2020 CATHERINE ADROVER
Eng Process Fee Ord 176,300 Cleared 8/13/2020 CATHERINE ADROVER
Permit Cleared 8/13/2020 CATHERINE ADROVER
Sewer availability Cleared 8/13/2020 CATHERINE ADROVER
Certificate of Compliance Cleared 8/21/2020 JOE LUCKEY
Miscellaneous Cleared 8/21/2020 JOE LUCKEY
Low Impact Development Cleared 11/24/2020 JORGE MEJIA LEMUS
Miscellaneous Cleared 12/7/2020 MARITZA PRZEKOP
Roof/Waste drainage to street Cleared 2/1/2021 CATHERINE ADROVER
Excavation more than 5-ft deep Cleared 2/3/2021 CALOSHA APPROVED
Watercourse Cleared 4/20/2021 MAHELET GEBEYHU
GPI Written Notices Cleared 4/23/2021 SERGIO GUTIERREZ
Grading Pre-Inspection Cleared 4/23/2021 SERGIO GUTIERREZ

Contact Information

Architect Garland,, James Arthur; Lic. No.: C21921 3780 WILSHIRE BLVD. #230      LOS ANGELES, CA 90010
Architect Rios,, Mark William; Lic. No.: C15744 3101 W EXPOSITION PLACE      LOS ANGELES, CA 90018
Contractor Mc Coy Peter Construction; Lic. No.: 493592-B 9777 WILSHIRE BLVD #902      BEVERLY HILLS, CA 90212
Engineer John,, Benjamin M; Lic. No.: C86018 11918 AVON WY 203      LOS ANGELES, CA 90066
Engineer Khalifeh,, Yaghoub Jack; Lic. No.: M25454 1625 W OLYMPIC BLVD STE 791      LOS ANGELES, CA 90015

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/2/2021 Partial Approval CHRISTOPHER WILSON
FLOOD-Elevation Certificate 7/30/2021 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 7/30/2021 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 7/30/2021 Partial Approval MATT KELLERMAN
FLOOD-Elevation Certificate 8/10/2021 Approved CHRISTOPHER WILSON
Footing/Foundation/Slab 8/10/2021 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 8/10/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 8/20/2021 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 9/16/2021 Partial Approval CHRISTOPHER WILSON
FLOOD-Proofing Certificate 10/4/2021 Approved CHRISTOPHER WILSON
Green Building Rough 10/4/2021 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 10/4/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/4/2021 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 10/8/2021 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 10/8/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/8/2021 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/12/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/12/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 10/27/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Reinforced Concrete Frame 10/27/2021 Partial Approval GERMAN RODRIGUEZ MENDOZA
Verify Sprinkler Sign Off 10/27/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 11/3/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/10/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 11/10/2021 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/12/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 11/12/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 11/17/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 11/24/2021 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 11/24/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 11/24/2021 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 11/24/2021 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 11/24/2021 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 12/8/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 12/8/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 12/16/2021 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 12/16/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/16/2021 Not Ready for Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 1/18/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 1/20/2022 Not Ready for Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 1/20/2022 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 1/21/2022 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 1/26/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 1/28/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 2/2/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 2/2/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/2/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 2/3/2022 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 2/24/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 2/24/2022 Not Ready for Inspection CHRISTOPHER WILSON
Grounding or Bonding 2/24/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 2/24/2022 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 2/24/2022 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/24/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 3/2/2022 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/11/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 3/11/2022 Partial Approval CHRISTOPHER WILSON
Sewer 3/11/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/15/2022 Partial Approval CHRISTOPHER WILSON
Gas Test 3/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Gas Test 3/18/2022 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 3/18/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 3/18/2022 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/18/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 3/21/2022 Not Ready for Inspection CHRISTOPHER WILSON
Gas Test 3/21/2022 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 3/23/2022 Partial Approval BRENDAN LOONEY
Footing/Foundation/Slab 3/31/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 3/31/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 3/31/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/31/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 4/19/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 4/19/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/19/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 4/26/2022 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 5/2/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 5/2/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 5/2/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/2/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 5/12/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 5/12/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/12/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 5/25/2022 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 5/25/2022 Partial Approval GERMAN RODRIGUEZ MENDOZA
Reinforced Concrete Frame 5/25/2022 Partial Approval GERMAN RODRIGUEZ MENDOZA
Verify Sprinkler Sign Off 5/25/2022 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Green Building Rough 5/27/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 5/27/2022 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/27/2022 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/2/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 6/2/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 6/2/2022 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/13/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/13/2022 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 6/13/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/17/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/20/2022 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 6/24/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/29/2022 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/30/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/5/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 7/8/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 7/8/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/8/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 7/14/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 7/14/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/14/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 7/18/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 7/25/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 7/25/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/25/2022 Not Ready for Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 8/2/2022 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 8/8/2022 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 8/8/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 8/10/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 8/10/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 8/10/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 8/22/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 8/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 8/22/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 8/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 8/25/2022 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 8/31/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 9/15/2022 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 9/15/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 9/23/2022 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 9/23/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 9/28/2022 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/7/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 10/7/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 10/7/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/7/2022 Not Ready for Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 10/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
Underground Mechanical 10/13/2022 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 10/14/2022 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/14/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/25/2022 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 10/25/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/25/2022 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 10/28/2022 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 11/4/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/4/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 11/18/2022 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 12/2/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 12/2/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 12/6/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 1/11/2023 Not Ready for Inspection CARLOS MATAMOROS
Reinforced Concrete Frame 1/11/2023 Partial Approval CARLOS MATAMOROS
Verify Sprinkler Sign Off 1/11/2023 Not Ready for Inspection CARLOS MATAMOROS
Footing/Foundation/Slab 1/12/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Reinforced Concrete Frame 1/26/2023 Partial Approval CHRISTOPHER WILSON
Green Building Rough 2/2/2023 Not Ready for Inspection CARLOS MATAMOROS
Reinforced Concrete Frame 2/2/2023 Partial Approval CARLOS MATAMOROS
Verify Sprinkler Sign Off 2/2/2023 Not Ready for Inspection CARLOS MATAMOROS
ELECTRICAL-Rough 2/14/2023 Partial Approval CHRISTOPHER WILSON
Gas Test 2/14/2023 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 2/14/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/14/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 2/16/2023 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 2/16/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 2/16/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 2/16/2023 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 2/23/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 2/23/2023 Partial Approval CHRISTOPHER WILSON
Gas Test 2/23/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 2/23/2023 Partial Approval CHRISTOPHER WILSON
Insulation 2/23/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/23/2023 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 3/10/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 3/10/2023 Partial Approval CHRISTOPHER WILSON
Green Building Rough 3/10/2023 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 3/10/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 3/10/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 3/17/2023 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 3/17/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/17/2023 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/24/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 3/24/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 3/24/2023 Partial Approval CHRISTOPHER WILSON
Insulation 3/24/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 3/24/2023 Partial Approval CHRISTOPHER WILSON
Insulation 4/7/2023 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/10/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 4/10/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 4/10/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 4/10/2023 Partial Approval CHRISTOPHER WILSON
Sewer 4/13/2023 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 4/13/2023 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 4/18/2023 Corrections Issued CHRISTOPHER WILSON
Drywall Nailing 5/1/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 5/1/2023 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 5/1/2023 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/8/2023 Partial Approval CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 5/8/2023 Partial Approval CHRISTOPHER WILSON
Gas Test 5/18/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 5/18/2023 Partial Approval CHRISTOPHER WILSON
Gas Test 5/31/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 6/6/2023 Corrections Issued CHRISTOPHER WILSON
Gas Test 6/6/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 6/6/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 6/6/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 6/15/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 6/15/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/15/2023 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 7/17/2023 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 8/28/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/28/2023 Not Ready for Inspection CHRISTOPHER WILSON
Sewer 8/28/2023 Not Ready for Inspection CHRISTOPHER WILSON
Drywall Nailing 9/8/2023 Partial Approval CHRISTOPHER WILSON
Green Building Rough 9/8/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 10/10/2023 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 10/10/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 10/10/2023 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 10/17/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 10/17/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/17/2023 Partial Approval CHRISTOPHER WILSON
Insulation 10/23/2023 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 10/31/2023 Partial Approval STEPHANIE SWANSON
Green Building Rough 10/31/2023 Not Ready for Inspection STEPHANIE SWANSON
ELECTRICAL-Rough 11/15/2023 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 11/15/2023 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 11/15/2023 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 12/5/2023 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 12/5/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 12/5/2023 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 12/14/2023 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/20/2023 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 12/20/2023 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 12/20/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 12/20/2023 Approved CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/20/2023 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/28/2023 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 12/28/2023 Approved CHRISTOPHER WILSON
Green Building Rough 12/28/2023 Approved CHRISTOPHER WILSON
HVAC-Rough 12/28/2023 Approved CHRISTOPHER WILSON
PLUMBING-Rough 12/28/2023 Approved CHRISTOPHER WILSON
Insulation 1/8/2024 Not Ready for Inspection CHRISTOPHER WILSON
Insulation 1/12/2024 Corrections Issued STEPHANIE SWANSON
Insulation 1/18/2024 Approved CHRISTOPHER WILSON
Drywall Nailing 1/25/2024 Partial Approval CHRISTOPHER WILSON
Insulation 2/8/2024 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 2/28/2024 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 3/1/2024 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 3/12/2024 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/14/2024 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 3/14/2024 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/14/2024 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 3/20/2024 Partial Approval CHRISTOPHER WILSON
Wood Frame 3/20/2024 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 4/1/2024 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 4/22/2024 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 5/3/2024 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 6/21/2024 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/27/2024 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 7/9/2024 Corrections Issued CHRISTOPHER WILSON
Drywall Nailing 9/10/2024 Approved CHRISTOPHER WILSON
Gas Test 9/10/2024 Corrections Issued CHRISTOPHER WILSON
Pre-Inspection 9/10/2024 Approved CHRISTOPHER WILSON
Gas Test 9/16/2024 Partial Approval CHRISTOPHER WILSON
Gas Test 9/17/2024 Approved MICHAEL ALLEN
Service/Power Release 11/6/2024 Corrections Issued CHRISTOPHER WILSON
Service/Power Release 11/8/2024 Approved CHRISTOPHER WILSON
Special/Order Compliance 11/8/2024 Corrections Issued CHRISTOPHER WILSON
Gas Test 11/13/2024 Partial Approval CHRISTOPHER WILSON
Gas Test 11/14/2024 Approved CHRISTOPHER WILSON
Grading Pre-Inspection 12/2/2024 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Final 12/4/2024 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Final 12/13/2024 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 1/22/2025 Partial Approval BOBBY KEY
HVAC-Final 2/10/2025 Corrections Issued STEPHANIE SWANSON
PLUMBING-Final 2/10/2025 Approved STEPHANIE SWANSON
ELECTRICAL-Final 2/18/2025 Conditional Approval STEPHANIE SWANSON
HVAC-Final 2/18/2025 Partial Approval STEPHANIE SWANSON
HVAC-Final 2/24/2025 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Final 2/26/2025 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Final 3/5/2025 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/19/2025 Approved CHRISTOPHER WILSON
ELECTRICAL-Final 3/19/2025 Approved CHRISTOPHER WILSON
Final 3/19/2025 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 3/19/2025 Approved CHRISTOPHER WILSON
Green Building Final 3/19/2025 Approved CHRISTOPHER WILSON
HVAC-Final 3/19/2025 Approved CHRISTOPHER WILSON
Reinforced Concrete Frame 3/19/2025 Approved CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 3/19/2025 SGSOV Approved CHRISTOPHER WILSON
Smoke Detectors 3/19/2025 Approved CHRISTOPHER WILSON
Pool/Spa Cover 3/20/2025 Not Ready for Inspection CHRISTOPHER WILSON
Final 4/23/2025 OK to Issue CofO CHRISTOPHER WILSON