988 S MANHATTAN PL 90019

Certificate Information: 988 S MANHATTAN PL 90019

Application / Permit
20010-10000-02008
Plan Check / Job No.
B20LA10481
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 7 STORY 118 UNITS (12 ELI = 10%) AFFORDABLE HOUSING APARTMENT TO INCLUDE 5 STORY TYPE IIIA APARTMENT OVER 2 STORY TYPE IA MIXED USE APARTMENT, PARKING, RETAIL OVER 2 LEVEL TYPE IA SUBTERRENEAN PARKING, TIER 3 TOC WITH ADDITIONAL INCENTIVES.
Permit Issued
Issued on 2/4/2022
Issuing Office
Metro
Current Status
Issued on 2/4/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 10/15/2021 EUGENE BARBEAU
Issued 2/4/2022 APPLICANT
TCO Issued (Expire Date: 03-17-2026) 9/18/2025 ERNESTO CORRAL
TCO Issued (Expire Date: 10-28-2026) 5/1/2026 ADAM BURGESS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 8/26/2020 ELAINE LEI
Address approval Cleared 9/17/2020 ELAINE LEI
Building over 36-ft Cleared 11/16/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/16/2020 CALOSHA APPROVED
Hydrant and Access approval Cleared 11/19/2020 MATTHEW CRAIG
Trees in Parkway Cleared 12/16/2020 JOHN KIM
Bicycle Parking Cleared 3/11/2021 ELAINE LEI
Highway dedication Cleared 3/26/2021 ELAINE LEI
Construction near power lines Cleared 4/13/2021 TINA MIRANDA
Work Adjacent to Public Way Cleared 6/24/2021 CHIU TAM
Permit Cleared 7/19/2021 RENZ SORIANO
Low Impact Development Cleared 7/24/2021 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 7/30/2021 RENZ SORIANO
Sewer availability Cleared 8/12/2021 WALLIE JONG
Density Bonus 12.22.A.31 Cleared 9/9/2021 MARITESS GO
CPC Cleared 9/23/2021 RUBEN VASQUEZ
Comm Cor/Mini-Mall Cleared 9/23/2021 RUBEN VASQUEZ
Comm Cor/Mini-Mall Cleared 9/23/2021 RUBEN VASQUEZ
Comm Cor/Mini-Mall Cleared 9/23/2021 RUBEN VASQUEZ
Miscellaneous Cleared 9/23/2021 RUBEN VASQUEZ
Miscellaneous Cleared 9/23/2021 RUBEN VASQUEZ
Miscellaneous Cleared 9/23/2021 RUBEN VASQUEZ
Miscellaneous Cleared 9/23/2021 RUBEN VASQUEZ
Miscellaneous Cleared 9/23/2021 RUBEN VASQUEZ
Miscellaneous Cleared 9/23/2021 RUBEN VASQUEZ
Opn space landscape/Water mgmt Cleared 9/23/2021 RUBEN VASQUEZ
Site Plan review Cleared 9/23/2021 RUBEN VASQUEZ
Redevelopment Project Area Cleared 9/28/2021 SUSAN WONG
DAS Clearance Cleared 10/7/2021 EUGENE BARBEAU
Fire Marshall Fire Life Safety Cleared 10/7/2021 OSCAR SALGADO JR
Green Code Cleared 10/7/2021 AARON COSTA

Contact Information

Architect Pitts,, Jean L; Lic. No.: C27115 4151 MANZANITA      IRVINE, CA 92604
Contractor Wilshire Construction L P; Lic. No.: 1048091-B 3470 WILSHIRE STE 1010      LOS ANGELES, CA 90010
Engineer Funk,, David Lyle; Lic. No.: S5421 319 MAIN STREET      EL SEGUNDO, CA 90245
Engineer Larocca,, Francis Joseph; Lic. No.: C75121 1821 PACIFIC COAST HWY 38      HERMOSA BEACH, CA 90254
Engineer Tang,, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505
Landscape Architect Raghunathan,, Nandagopal Vadakupalaya; Lic. No.: LA5499 3145 BROOKHILL STREET      LA CRESCENTA, CA 91214

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/1/2022 Approved EDWIN GREGORYONA
Deputy Steel/Welding 4/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/27/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 4/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/25/2022 Conditional Approval TERRY HERR
Special/Order Compliance 9/2/2022 Approved EDWIN GREGORYONA
Footing/Foundation/Slab 9/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/22/2022 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/22/2022 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 9/22/2022 Partial Approval NICK DANERI
Footing/Foundation/Slab 9/22/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 9/23/2022 Approved GREGORY POMISH
Excavation/Setback/Form/Re-Bar 9/23/2022 Not Ready for Inspection GREGORY POMISH
Green Building Rough 9/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 9/28/2022 Partial Approval EDWIN GREGORYONA
Structural Steel Frame 9/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 10/3/2022 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/3/2022 Partial Approval GREGORY POMISH
Green Building Rough 10/5/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/5/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/5/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 10/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/7/2022 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/11/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/11/2022 Partial Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 10/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/4/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 11/21/2022 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/23/2022 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/23/2022 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/28/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 11/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/30/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 12/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 12/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/7/2022 Not Ready for Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 12/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/15/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/15/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/15/2022 Not Ready for Inspection JAMES POWERS
Deputy Shotcrete 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/19/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/22/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 12/22/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/22/2022 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 12/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/28/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/3/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/3/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/3/2023 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 1/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/17/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 1/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 1/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 1/31/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 1/31/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/31/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 2/8/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/9/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/10/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 2/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/17/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/22/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/22/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 2/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 2/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/3/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/6/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/7/2023 Partial Approval EDWIN GREGORYONA
Structural Steel Frame 3/16/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Reinforced Masonry Frame 3/17/2023 Off-Hour Fees Due
Green Building Rough 4/5/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 4/5/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/5/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 4/10/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/11/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/17/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 4/20/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/20/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/20/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/21/2023 Partial Approval RAFAEL ESPINOZA
Green Building Rough 5/2/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 5/2/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/2/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 5/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/22/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 5/24/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/24/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/24/2023 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 5/30/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/30/2023 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/30/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 5/31/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/1/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/21/2023 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 6/29/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/14/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/25/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/7/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/16/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/18/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 8/23/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/24/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/30/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/11/2023 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/14/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/25/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/27/2023 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/2/2023 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/4/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 10/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/20/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/23/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 10/24/2023 Partial Approval EDWIN GREGORYONA
Insulation 11/3/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/7/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/21/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/21/2023 Partial Approval EDWIN GREGORYONA
Insulation 11/27/2023 Approved DARRYL ARNOLD
Insulation 11/30/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 12/11/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 12/13/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 12/18/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 12/19/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 12/27/2023 Partial Approval EDWIN GREGORYONA
Insulation 1/9/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 1/10/2024 Partial Approval EDWIN GREGORYONA
Insulation 1/12/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 1/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 1/29/2024 Partial Inspection EDWIN GREGORYONA
Insulation 2/16/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 2/20/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/22/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/23/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 2/28/2024 Not Ready for Inspection EDWIN GREGORYONA
Insulation 2/29/2024 Partial Approval EDWIN GREGORYONA
Insulation 3/8/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 3/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 3/12/2024 Partial Approval EDWIN GREGORYONA
Insulation 3/12/2024 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 3/12/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 3/13/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 3/14/2024 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 3/18/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/26/2024 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 3/27/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/28/2024 Partial Approval EDWIN GREGORYONA
Insulation 3/29/2024 Partial Approval JACOB MYERS
Drywall Nailing 4/8/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 4/15/2024 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 4/18/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/22/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/25/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 4/29/2024 Partial Approval EDWIN GREGORYONA
Insulation 5/1/2024 Partial Approval EDWIN GREGORYONA
Insulation 5/2/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 5/16/2024 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 5/16/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/20/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/24/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/29/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/29/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/10/2024 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 6/10/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 7/24/2024 Approved EDWIN GREGORYONA
Light Gage Steel Frame 8/28/2024 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 9/13/2024 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 9/13/2024 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 9/16/2024 Partial Approval MARTIN TAVITIAN
Deputy Shotcrete 10/24/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 12/3/2024 Approved EDWIN GREGORYONA
Green Building Rough 1/6/2025 Approved EDWIN GREGORYONA
Masonry Wall/Backfill 1/6/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/6/2025 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 1/6/2025 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/6/2025 Approved EDWIN GREGORYONA
Final 3/20/2025 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 3/20/2025 Approved EDWIN GREGORYONA
Green Building Final 3/20/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/20/2025 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 3/20/2025 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 3/20/2025 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 3/20/2025 Approved EDWIN GREGORYONA
Final 5/27/2025 Not Ready for Inspection MARTIN TAVITIAN
Green Building Final 5/27/2025 Approved MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 5/27/2025 SGSOV Not Ready MARTIN TAVITIAN
Drywall Nailing 7/15/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 7/17/2025 Partial Approval EDWIN GREGORYONA
Final 8/20/2025 Partial Inspection EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 8/20/2025 SGSOV Approved EDWIN GREGORYONA
Final 8/26/2025 Conditional Approval MARTIN TAVITIAN
Special/Order Compliance 2/18/2026 Approved MARTIN TAVITIAN
Final 5/1/2026 No Access for Inspection MARTIN TAVITIAN
Final 5/5/2026 Not Ready for Inspection MARTIN TAVITIAN