Pre-Inspection
|
3/8/2022
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Green Building Rough
|
3/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
3/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Barrier
|
3/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
3/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
3/12/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
METHANE-Rough
|
3/12/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
3/12/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
3/12/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
3/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/21/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/21/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
3/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
3/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
3/29/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Rough
|
3/29/2022
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/29/2022
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/29/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/1/2022
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Shotcrete
|
4/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
4/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/18/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
4/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/19/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
4/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
4/21/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Pre-Stress Concrete
|
4/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
4/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
4/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
5/12/2022
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/12/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
5/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
5/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
7/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
7/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
7/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
7/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Structural Steel Frame
|
7/27/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
8/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
8/5/2022
|
Partial Inspection
|
KATY RAMIREZ
|
|
Verify Sprinkler Sign Off
|
8/5/2022
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
8/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/18/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Verify Sprinkler Sign Off
|
9/7/2022
|
Off-Hour Fees Due
|
|
|
Wood Frame
|
9/7/2022
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
9/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
9/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Structural Steel Frame
|
9/15/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/19/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
9/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/26/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
9/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/14/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
10/14/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/27/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/13/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
12/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
12/29/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
1/3/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
1/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/19/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/30/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/30/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
1/30/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/31/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/2/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Other (see comments)
|
2/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
2/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
2/8/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
2/8/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
2/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
2/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
2/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
2/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2023
|
Corrections Issued
|
GREGORY POMISH
|
|
Insulation
|
2/28/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/6/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
3/8/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
3/8/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
3/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
3/10/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
3/15/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
3/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
3/31/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
4/3/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
4/4/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
4/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/18/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
4/20/2023
|
Order to Comply Issued
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/21/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
4/21/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
4/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/26/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
5/2/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
5/4/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
5/6/2023
|
Off-Hour Fees Due
|
|
|
Wall Anchors
|
5/6/2023
|
Off-Hour Fees Due
|
|
|
Insulation
|
5/8/2023
|
Off-Hour Fees Due
|
|
|
Insulation
|
5/8/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Wall Anchors
|
5/8/2023
|
Off-Hour Fees Due
|
|
|
Wall Anchors
|
5/8/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/9/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wall Anchors
|
5/9/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
5/12/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/15/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
5/15/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
5/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
5/22/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/24/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
5/26/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
5/30/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/30/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/1/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/2/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/2/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
6/2/2023
|
Corrections Issued
|
LARRY ARNICK
|
|
Insulation
|
6/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Wall Anchors
|
6/7/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
6/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/20/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/20/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/22/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Light Gage Steel Frame
|
6/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
7/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/12/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
7/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
7/13/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/19/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Wood Frame
|
7/20/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
7/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Wall Anchors
|
7/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/16/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Final
|
8/25/2023
|
Not Ready for Inspection
|
ALAN MORELOS
|
|
Special/Order Compliance
|
8/28/2023
|
Approved
|
ALAN MORELOS
|
|
Drywall Nailing
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
9/7/2023
|
Partial Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Barrier
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Subgrade
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
9/7/2023
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
9/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
10/13/2023
|
Approved
|
JAMES POWERS
|
|
Final
|
10/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Final
|
10/13/2023
|
Approved
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Pre-Inspection
|
10/13/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
10/13/2023
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
10/13/2023
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
10/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
10/16/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
10/19/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/19/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/19/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/19/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
10/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
10/30/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/30/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/30/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
10/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/3/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
11/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
11/7/2023
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/7/2023
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
11/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
1/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/2/2024
|
Approved
|
JAMES POWERS
|
|
METHANE-Barrier
|
1/2/2024
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/2/2024
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
1/2/2024
|
Approved
|
JAMES POWERS
|
|
Final
|
3/28/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
6/3/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
7/9/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
10/31/2024
|
OK to Issue CofO
|
JAMES POWERS
|