6017 N LAUREL CANYON BLVD 91606

Certificate Information: 6017 N LAUREL CANYON BLVD 91606

Application / Permit
20010-10000-01505
Plan Check / Job No.
B20LA08116
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(18) School - elementary or high
Work Description
PROPOSED 3-STORY SCHOOL. BUILDING IS LOCATED ENTIRELY IN C2-1VL ZONE ONLY. SCHOOL IS NOT ALLOWED IN P-1VL ZONE, ONLY ATTACHED PARKING STRUCTURE IS ALLOWED. PROPOSED USED IS 4TH TO 8TH GRADES.
Permit Issued
Issued on 6/21/2022
Issuing Office
Metro
Current Status
Issued on 6/21/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/8/2020 APPLICANT
Assigned to Plan Check Engineer 5/28/2020 ERWIN PASCUA
Corrections Issued 6/10/2020 ERWIN PASCUA
Quality Review Completed 6/16/2020 CHARLES CHANG
Building Plans Picked Up 6/18/2020 APPLICANT
Disabled Access Plans Picked Up 6/25/2020 APPLICANT
Applicant returned to address corrections 1/8/2021 ERWIN PASCUA
Applicant returned to address corrections 4/29/2021 ERWIN PASCUA
Applicant returned to address corrections 5/5/2021 ERWIN PASCUA
Applicant returned to address corrections 5/13/2021 ERWIN PASCUA
Applicant returned to address corrections 10/22/2021 ERWIN PASCUA
Applicant returned to address corrections 12/10/2021 ERWIN PASCUA
Applicant returned to address corrections 1/12/2022 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 1/31/2022 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 3/17/2022 FARSHAD ALIMOHAMADI
Green Plans Picked Up 5/12/2022 APPLICANT
Plan Check Approved 6/16/2022 FARSHAD ALIMOHAMADI
Issued 6/21/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 8/7/2020 MARKOS PEREZ-BRAN
Eng Process Fee Ord 176,300 Cleared 8/14/2020 MARKOS PEREZ-BRAN
Work Adjacent to Public Way Cleared 6/1/2021 GABRIEL ROBLES
Redevelopment Project Area Cleared 6/10/2021 GRACIELA ACOSTA
ZI Cleared 6/10/2021 GRACIELA ACOSTA
Sewer availability Cleared 6/17/2021 GABRIEL ROBLES
Construction near power lines Cleared 6/23/2021 OSCAR CASTRO
Highway dedication Cleared 6/24/2021 GABRIEL ROBLES
Permit Cleared 6/24/2021 GABRIEL ROBLES
"Q" conditions Cleared 7/1/2021 TERRI OSBORNE
Trees in Parkway Cleared 7/8/2021 JOHN KIM
Hydrant and Access approval Cleared 8/9/2021 MATTHEW CRAIG
DAS Clearance Cleared 10/20/2021 ERWIN PASCUA
Green Code Cleared 1/11/2022 AARON COSTA
Low Impact Development Cleared 3/13/2022 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 3/17/2022 ABDULLAH SADOZAI
Fire Marshall Fire Life Safety Cleared 5/31/2022 OSCAR SALGADO JR
Building over 36-ft Cleared 6/16/2022 CALOSHA APPROVED

Contact Information

Architect Mashihi,, Jacques; Lic. No.: C15922 10556 ASHTON AVENUE      LOS ANGELES, CA 90024
Contractor Owner-Builder       ,
Engineer Minas,, Caro Jolfaie; Lic. No.: GE601 4742 SAN FERNANDO RD      GLENDALE, CA 91204
Engineer Naim,, Soleiman Israel; Lic. No.: S2454 403 21ST ST      SANTA MONICA, CA 90402

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/14/2023 Approved JOHN KITCKO
Footing/Foundation/Slab 7/7/2023 No Access for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/13/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/19/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/27/2023 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 7/27/2023 Conditional Approval JOHN KITCKO
Green Building Rough 10/11/2023 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 10/11/2023 Corrections Issued JOHN KITCKO
Verify Sprinkler Sign Off 10/11/2023 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 10/13/2023 Corrections Issued ROBERT DAVIS
Green Building Rough 10/17/2023 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 10/17/2023 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 10/17/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 10/19/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 10/31/2023 Approved JOHN KITCKO
Masonry Wall/Backfill 11/1/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 11/3/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 11/15/2023 Conditional Approval JOHN KITCKO
Masonry Wall/Backfill 11/15/2023 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 11/17/2023 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 12/8/2023 Corrections Issued ANDREW DORSO
Footing/Foundation/Slab 12/12/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 12/14/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 3/12/2024 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 8/30/2024 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/4/2024 Partial Approval JOHN KITCKO
Deputy Wood Construction 10/9/2024 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/9/2024 Corrections Issued JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/16/2024 Corrections Issued JOHN KITCKO
Deputy Wood Construction 12/17/2024 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/18/2024 Partial Approval JOHN KITCKO
Green Building Rough 1/29/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 1/29/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 1/29/2025 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 2/13/2025 Partial Inspection JOHN KITCKO
Drywall Nailing 4/2/2025 Partial Inspection JOHN KITCKO
Green Building Rough 4/2/2025 Not Ready for Inspection JOHN KITCKO
Insulation 4/7/2025 Partial Approval JOHN KITCKO
Drywall Nailing 4/11/2025 Partial Approval JOHN KITCKO
Green Building Rough 4/11/2025 Not Ready for Inspection JOHN KITCKO
Insulation 7/24/2025 Conditional Approval JOHN KITCKO
Wall Anchors 8/1/2025 Partial Approval JOHN KITCKO
Wood Frame 8/1/2025 Partial Approval JOHN KITCKO
Insulation 8/8/2025 Partial Approval JOHN KITCKO
Drywall Nailing 8/12/2025 Not Ready for Inspection JOHN KITCKO
Green Building Rough 8/12/2025 Partial Inspection JOHN KITCKO
Drywall Nailing 8/18/2025 Partial Inspection BRIAN KELLY
Green Building Rough 8/18/2025 Partial Inspection BRIAN KELLY
T-Bar Ceiling 1/14/2026 Partial Inspection JOHN KITCKO
Drywall Nailing 3/26/2026 Partial Inspection DEANDRE HOFFMAN
Final 3/26/2026 Not Ready for Inspection DEANDRE HOFFMAN
Footing/Foundation/Slab 3/26/2026 Approved DEANDRE HOFFMAN
Green Building Final 3/26/2026 Partial Inspection DEANDRE HOFFMAN
Green Building Rough 3/26/2026 Approved DEANDRE HOFFMAN
Reinforced Masonry Frame 3/26/2026 Partial Inspection DEANDRE HOFFMAN
SGSOV-Seismic Gas S/O Valve 3/26/2026 SGSOV Not Ready DEANDRE HOFFMAN
Smoke Detectors 3/26/2026 Approved DEANDRE HOFFMAN
Structural Steel Frame 3/26/2026 Partial Inspection DEANDRE HOFFMAN
Verify Sprinkler Sign Off 3/26/2026 Not Ready for Inspection DEANDRE HOFFMAN
Wood Frame 3/26/2026 Partial Inspection DEANDRE HOFFMAN