240 N MADISON AVE 90004

Certificate Information: 240 N MADISON AVE 90004

Application / Permit
20010-10000-01341
Plan Check / Job No.
B20LA07162
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(18) School Building
Work Description
New 2 story classroom building for grades TK-8th grade (total of 20 classrooms) with support spaces, offices, multi purpose room, boys and girls locker rooms, elevator, and utility rooms. Maximum number of student enrolled is 480 students. (Sign is under separate permit #20048-10000-01490)
Permit Issued
Issued on 3/31/2021
Issuing Office
Metro
Current Status
CofO Issued on 11/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/6/2020 APPLICANT
Assigned to Plan Check Engineer 5/28/2020 YOUNG KIM
Corrections Issued 6/9/2020 YOUNG KIM
Quality Review Completed 6/26/2020 ALLEN MANALANSAN
Building Plans Picked Up 7/2/2020 APPLICANT
Applicant returned to address corrections 8/24/2020 YOUNG KIM
Applicant returned to address corrections 8/29/2020 YOUNG KIM
Applicant returned to address corrections 9/10/2020 YOUNG KIM
Applicant returned to address corrections 11/4/2020 YOUNG KIM
Applicant returned to address corrections 11/10/2020 YOUNG KIM
Green Plans Picked Up 12/11/2020 APPLICANT
Applicant returned to address corrections 2/3/2021 YOUNG KIM
Applicant returned to address corrections 2/5/2021 YOUNG KIM
Plan Check Approved 3/5/2021 YOUNG KIM
Issued 3/31/2021 APPLICANT
TCO Issued (Expire Date: 11-05-2022) 5/9/2022 ERNESTO CORRAL
CofO in Progress 11/1/2022 DAVID BURKHEAD
Permit Finaled 11/1/2022 TERRY HERR
CofO Issued 11/1/2022 TERRY HERR
Permit Finaled 11/1/2022 TERRY HERR

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 8/6/2020 CECILIO NAVARRO
Green Code Cleared 8/6/2020 YOUNG KIM
DAS Clearance Cleared 8/11/2020 SOMKIAT SUPANYACHOTSKUL
Hydrant and Access approval Cleared 9/2/2020 MATTHEW CRAIG
Sewer availability Cleared 10/20/2020 CECILIO NAVARRO
Grading Pre-Inspection Cleared 11/15/2020 YOUNG KIM
Encroachment in public way Cleared 11/25/2020 ELAINE LEI
Fire Marshall Fire Life Safety Cleared 11/30/2020 ANDREW KO
Low Impact Development Cleared 12/6/2020 ORVAL HERNANDEZ-MARCI
Historic Resource Verification Cleared 1/11/2021 MICAELA TORRES-GIL
CPC Cleared 1/13/2021 KENTON TRINH
Specific Plan Cleared 1/13/2021 KENTON TRINH
Redevelopment Project Area Cleared 1/15/2021 DAVID URITA
Roof/Waste drainage to street Cleared 1/25/2021 SAM NAVID
Permit Cleared 2/22/2021 WALLIE JONG

Contact Information

Architect Csda, Design Group; Lic. No.: C35165 889 N. DOUGLAS ST.   100    EL SEGUNDO, CA 90245
Contractor Consolidated Contracting Services Inc; Lic. No.: 475813-B 181 AVENIDA LA PATA   SUITE 200    SAN CLEMENTE, CA 92673
Engineer Grossman, & Speer Associates, Inc.; Lic. No.: S6228 529 HAHN AVE   STE #200    GLENDALE, CA 91203
Engineer Vca, Engineering Inc.; Lic. No.: C36079 1041 S GARFIELD AVE   STE #210    ALHAMBRA, CA 91801
Landscape Architect Brightview, Design Group; Lic. No.: LA1846 1715 18TH ST.      SANTA MONICA, CA 90404

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

METHANE-Barrier 5/21/2021 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 5/21/2021 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 6/2/2021 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/3/2021 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/13/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 7/13/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 7/13/2021 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 7/13/2021 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/14/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/7/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 9/7/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 9/7/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/7/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/16/2021 Partial Approval DAVID BURKHEAD
METHANE-Barrier 9/16/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 9/16/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 9/28/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 9/28/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/28/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/28/2021 Partial Approval DAVID BURKHEAD
Piling/Pier/Caisson 10/1/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 10/1/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/4/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 10/13/2021 Partial Approval RAFAEL ESPINOZA
Green Building Rough 10/19/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Rough 10/19/2021 Conditional Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 10/19/2021 Partial Inspection DANIEL MC AULIFFE
Wood Frame 10/19/2021 Partial Approval DANIEL MC AULIFFE
Green Building Rough 10/22/2021 Approved DANIEL COLLINS
METHANE-Rough 10/22/2021 Not Ready for Inspection DANIEL COLLINS
Verify Sprinkler Sign Off 10/22/2021 Not Ready for Inspection DANIEL COLLINS
Wood Frame 10/22/2021 Partial Approval DANIEL COLLINS
Insulation 10/26/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 10/26/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/26/2021 Partial Approval DAVID BURKHEAD
Wood Frame 10/26/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/28/2021 Partial Approval DAVID BURKHEAD
METHANE-Rough 11/5/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 11/5/2021 Partial Approval DAVID BURKHEAD
Wood Frame 11/5/2021 Partial Inspection DAVID BURKHEAD
Interior/Exterior Lathing 11/10/2021 Approved DAVID BURKHEAD
Drywall Nailing 11/12/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 11/19/2021 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 12/7/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/16/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 12/16/2021 Partial Approval DAVID BURKHEAD
Wood Frame 12/16/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 12/21/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 12/21/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 12/21/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/22/2021 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 12/22/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 12/22/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/22/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/29/2021 Partial Approval DAVID BURKHEAD
Wood Frame 12/30/2021 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 1/10/2022 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 1/14/2022 Partial Approval DAVID BURKHEAD
Pre-Inspection 3/9/2022 Approved DAVID BURKHEAD
Pre-Inspection 4/4/2022 Partial Inspection DAVID BURKHEAD
Pre-Inspection 4/5/2022 Partial Inspection DAVID BURKHEAD
Pre-Inspection 4/7/2022 Approved DAVID BURKHEAD
Pre-Inspection 4/12/2022 Partial Inspection DAVID BURKHEAD
Pre-Inspection 4/18/2022 Corrections Issued DAVID BURKHEAD
Pre-Inspection 4/19/2022 Corrections Issued DAVID BURKHEAD
Special/Order Compliance 4/19/2022 Corrections Issued DAVID BURKHEAD
Special/Order Compliance 4/20/2022 Approved DAVID BURKHEAD
Pre-Inspection 5/5/2022 Corrections Issued DAVID BURKHEAD
Green Building Final 5/6/2022 Approved DAVID BURKHEAD
Pre-Inspection 5/6/2022 Approved DAVID BURKHEAD
Special/Order Compliance 10/12/2022 Partial Inspection DAVID BURKHEAD
Drywall Nailing 10/31/2022 Approved DAVID BURKHEAD
Final 10/31/2022 OK to Issue CofO DAVID BURKHEAD
Footing/Foundation/Slab 10/31/2022 Approved DAVID BURKHEAD
METHANE-Barrier 10/31/2022 Approved DAVID BURKHEAD
METHANE-Final 10/31/2022 Approved DAVID BURKHEAD
METHANE-Rough 10/31/2022 Approved DAVID BURKHEAD
METHANE-Subgrade 10/31/2022 Approved DAVID BURKHEAD
Pre-Inspection 10/31/2022 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 10/31/2022 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 10/31/2022 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 10/31/2022 Approved DAVID BURKHEAD
Wood Frame 10/31/2022 Approved DAVID BURKHEAD