14536 W BURBANK BLVD 91411

Certificate Information: 14536 W BURBANK BLVD 91411

Application / Permit
20010-10000-01232
Plan Check / Job No.
B20LA06642
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
4 STORY MULTI-FAMILY BUILDING WITH SUBTERRANEAN GARAGE.100% AFFORDABLE . 55 UNITS(17 UNITS VERY LOW INCOME, 37 UNIT LOW INCOME AND 1 MANAGER UNIT ) FOUR STORIES OF TYPE V OVER TYPE I SUBTERRANEAN GARAGE
Permit Issued
Issued on 4/7/2021
Issuing Office
Current Status
CofO Issued on 6/27/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/5/2020 APPLICANT
Assigned to Plan Check Engineer 5/14/2020 ARSALAN SHABESTARI
Disabled Access Plans Picked Up 5/19/2020 APPLICANT
Green Plans Picked Up 5/27/2020 APPLICANT
Corrections Issued 5/28/2020 ARSALAN SHABESTARI
Quality Review Completed 6/5/2020 HERNAN ARREOLA
Applicant returned to address corrections 7/14/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 7/21/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 7/22/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 7/23/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 7/27/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 7/30/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 8/5/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 8/13/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 8/20/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 8/24/2020 ARSALAN SHABESTARI
Building Plans Picked Up 9/11/2020 APPLICANT
Applicant returned to address corrections 10/6/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 10/28/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 11/10/2020 ARSALAN SHABESTARI
Applicant returned to address corrections 3/22/2021 ARSALAN SHABESTARI
Plan Check Approved 4/5/2021 ARSALAN SHABESTARI
Issued 4/7/2021 APPLICANT
TCO Issued (Expire Date: 03-06-2024) 9/8/2023 RICKEY JACKSON
TCO Issued (Expire Date: 10-16-2024) 4/19/2024 RICKEY JACKSON
CofO in Progress 6/27/2024 CAMERON CHABAN
Permit Finaled 6/27/2024 RICKEY JACKSON
CofO Issued 6/27/2024 RICKEY JACKSON
Permit Finaled 6/27/2024 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 5/11/2020 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 6/11/2020 ERIK BEASLEY
Building over 36-ft Cleared 7/24/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/5/2020 CALOSHA APPROVED
Highway dedication Cleared 8/11/2020 ABDULLAH SADOZAI
Permit Cleared 8/11/2020 GUILLERMO PETRA
Construction near power lines Cleared 8/14/2020 RIDWAN HARDY
Construction within easement Cleared 8/14/2020 RIDWAN HARDY
Sewer availability Cleared 8/24/2020 ADRIAN CASTRO
Site Plan review Cleared 9/4/2020 JOE LUCKEY
ZA Case Cleared 9/4/2020 JOE LUCKEY
Hydrant and Access approval Cleared 9/9/2020 MATTHEW CRAIG
Low Impact Development Cleared 9/20/2020 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 9/29/2020 GUILLERMO PETRA
Work Adjacent to Public Way Cleared 10/21/2020 LEE GUILBEAUX
Tenant Habitability Plan Cleared 11/10/2020 PHILLIP MUNGUIA
Public Housing Cleared 11/23/2020 THOMAS ANTONIO
DAS Clearance Cleared 11/30/2020 SHINE LIN
Green Code Cleared 12/3/2020 VIVIAN LAO
Fire Marshall Fire Life Safety Cleared 12/4/2020 VIDAL GARCIA
Density Bonus 12.22.A.25 Cleared 2/23/2021 JAMES MCCARTHY
"Q" conditions Cleared 3/1/2021 JOE LUCKEY
CPC Cleared 3/1/2021 JOE LUCKEY

Contact Information

Architect Olsen,, Eric H; Lic. No.: C27721 3802 OSTROM AVE      LONG BEACH, CA 90808
Contractor Walton Construction Inc; Lic. No.: 1034491-B 358 E FOOTHILL BLVD STE 100      SAN DIMAS, CA 91773
Engineer Aden,, Mark D; Lic. No.: S4779 1314 S GRAND BLVD 2-359      SPOKANE, WA 99202
Engineer Luong,, John Tuan; Lic. No.: C65214 8171 INGRAM CIR      WESTMINSTER, CA 92683

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/28/2021 Approved JOHN KITCKO
Pre-Inspection 6/28/2021 Partial Inspection DANIEL VARNUM
Pre-Inspection 8/10/2021 Partial Inspection CAMERON CHABAN
Pre-Inspection 8/24/2021 Partial Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/25/2021 Partial Approval JOHN KITCKO
Piling/Pier/Caisson 8/25/2021 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 8/26/2021 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/31/2021 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/2/2021 Conditional Approval CAMERON CHABAN
Pre-Inspection 9/20/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/23/2021 Conditional Approval RICKEY JACKSON
Footing/Foundation/Slab 9/23/2021 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/7/2021 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 10/13/2021 Partial Approval DANIEL VARNUM
Green Building Rough 10/13/2021 Not Ready for Inspection DANIEL VARNUM
Reinforced Concrete Frame 10/13/2021 Not Ready for Inspection DANIEL VARNUM
Verify Sprinkler Sign Off 10/13/2021 Not Ready for Inspection DANIEL VARNUM
Deputy Shotcrete 10/19/2021 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 10/19/2021 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Other (see comments) 10/20/2021 Approved JOHN KITCKO
Deputy Shotcrete 10/20/2021 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/21/2021 Partial Approval JOHN KITCKO
Deputy Other (see comments) 10/22/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 10/26/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 10/28/2021 Conditional Approval KENNETH ROBERTS
Deputy Shotcrete 10/29/2021 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 11/3/2021 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 11/15/2021 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 11/16/2021 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 11/23/2021 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/1/2021 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/3/2021 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 12/3/2021 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 12/6/2021 Partial Approval CAMERON CHABAN
Deputy Shotcrete 12/7/2021 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 1/5/2022 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 1/6/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/6/2022 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 1/10/2022 Conditional Approval ANDREW DORSO
Excavation/Setback/Form/Re-Bar 1/11/2022 Partial Approval DANIEL VARNUM
Deputy Reinf. Masonry 1/14/2022 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 1/14/2022 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 1/20/2022 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 1/21/2022 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 1/21/2022 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 1/21/2022 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 1/25/2022 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 1/26/2022 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 2/1/2022 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 2/1/2022 Partial Approval CAMERON CHABAN
Deputy Wood Construction 2/7/2022 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 2/7/2022 Not Ready for Inspection CAMERON CHABAN
Deputy Wood Construction 2/8/2022 Approved JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/8/2022 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/22/2022 Partial Approval CAMERON CHABAN
Green Building Rough 2/22/2022 Partial Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 2/22/2022 Partial Inspection CAMERON CHABAN
Deputy Wood Construction 2/25/2022 Conditional Approval JEFFREY FULTON
Green Building Rough 3/10/2022 Not Ready for Inspection DANIEL VARNUM
Verify Sprinkler Sign Off 3/10/2022 Not Ready for Inspection DANIEL VARNUM
Wood Frame 3/10/2022 Partial Approval DANIEL VARNUM
Wall Anchors 3/17/2022 Partial Inspection CAMERON CHABAN
Drywall Nailing 3/25/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 4/4/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 4/13/2022 Partial Approval CAMERON CHABAN
Green Building Rough 4/13/2022 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 4/13/2022 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 4/15/2022 Conditional Approval CAMERON CHABAN
Deputy Other (see comments) 4/20/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/20/2022 Conditional Approval CAMERON CHABAN
Deputy Other (see comments) 4/21/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/21/2022 Conditional Approval CAMERON CHABAN
Insulation 4/21/2022 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 4/26/2022 Partial Inspection JEFFREY FULTON
Green Building Rough 4/26/2022 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/26/2022 Not Ready for Inspection JEFFREY FULTON
Insulation 5/2/2022 Partial Approval CAMERON CHABAN
Wood Frame 5/6/2022 Partial Approval CAMERON CHABAN
Deputy Wood Construction 5/13/2022 Conditional Approval JOHN KITCKO
Insulation 5/13/2022 Partial Approval JOHN KITCKO
Green Building Rough 5/16/2022 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 5/16/2022 Not Ready for Inspection JEFFREY FULTON
Wood Frame 5/16/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/23/2022 Partial Inspection JEFFREY FULTON
Insulation 5/23/2022 Partial Inspection JEFFREY FULTON
Green Building Rough 5/24/2022 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 5/24/2022 Partial Inspection CAMERON CHABAN
Wood Frame 5/24/2022 Partial Approval CAMERON CHABAN
Insulation 5/26/2022 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 5/27/2022 Partial Approval CAMERON CHABAN
Green Building Rough 5/27/2022 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 5/27/2022 Not Ready for Inspection CAMERON CHABAN
Insulation 5/31/2022 Partial Approval CAMERON CHABAN
Green Building Rough 6/1/2022 Approved CAMERON CHABAN
Verify Sprinkler Sign Off 6/1/2022 Approved CAMERON CHABAN
Wood Frame 6/1/2022 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/2/2022 Conditional Approval CAMERON CHABAN
Drywall Nailing 6/6/2022 Partial Approval DANIEL VARNUM
Wood Frame 6/6/2022 Partial Inspection DANIEL VARNUM
Wood Frame 6/9/2022 Partial Approval CAMERON CHABAN
Insulation 6/16/2022 Partial Approval CAMERON CHABAN
Insulation 6/21/2022 Partial Inspection CAMERON CHABAN
Insulation 6/22/2022 Partial Approval CAMERON CHABAN
Insulation 6/27/2022 Partial Approval KENNETH ROBERTS
Insulation 6/30/2022 Not Ready for Inspection JOHN KITCKO
Insulation 7/5/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 7/8/2022 Conditional Approval CAMERON CHABAN
Insulation 7/8/2022 Conditional Approval CAMERON CHABAN
Insulation 7/12/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 7/14/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 7/15/2022 Partial Approval CAMERON CHABAN
Wood Frame 7/15/2022 Partial Approval CAMERON CHABAN
T-Bar Ceiling 7/20/2022 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 7/22/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 7/28/2022 Partial Approval CAMERON CHABAN
Wood Frame 7/28/2022 Not Ready for Inspection CAMERON CHABAN
Wood Frame 7/29/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 8/5/2022 Partial Approval DANIEL VARNUM
Insulation 8/5/2022 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 8/9/2022 Approved CAMERON CHABAN
Drywall Nailing 8/17/2022 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 8/22/2022 Partial Inspection CAMERON CHABAN
Wood Frame 8/22/2022 Partial Inspection CAMERON CHABAN
T-Bar Ceiling 8/23/2022 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 8/24/2022 Partial Approval ROBERT DAVIS
Drywall Nailing 8/30/2022 Partial Approval CAMERON CHABAN
Deputy Drilled-In Anchors 9/1/2022 Conditional Approval CAMERON CHABAN
Drywall Nailing 9/1/2022 Partial Approval CAMERON CHABAN
Insulation 9/14/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 9/21/2022 Partial Approval DANIEL VARNUM
Deputy Shotcrete 9/22/2022 Conditional Approval DANIEL VARNUM
Light Gage Steel Frame 10/24/2022 Partial Inspection ANDREW DORSO
Light Gage Steel Frame 10/25/2022 Conditional Approval CAMERON CHABAN
Insulation 10/28/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 11/17/2022 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 12/12/2022 Partial Inspection ANDREW DORSO
Special/Order Compliance 12/12/2022 Approved BRIAN KELLY
Wood Frame 1/6/2023 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 1/25/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 1/30/2023 Corrections Issued DANNY RODRIGUEZ
Special/Order Compliance 1/30/2023 Partial Approval STEVEN LEVITT
Drywall Nailing 2/3/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 2/3/2023 Conditional Approval CAMERON CHABAN
Light Gage Steel Frame 2/8/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 2/8/2023 Partial Inspection STEVEN LEVITT
Drywall Nailing 2/15/2023 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 2/15/2023 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 2/21/2023 Conditional Approval CAMERON CHABAN
Light Gage Steel Frame 2/21/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 2/23/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 2/23/2023 Partial Inspection CAMERON CHABAN
Drywall Nailing 3/6/2023 Approved CAMERON CHABAN
Deputy Reinf. Concrete 4/6/2023 Conditional Approval CAMERON CHABAN
Reinforced Masonry Frame 4/11/2023 Approved DANIEL VARNUM
Deputy Drilled-In Anchors 4/13/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 5/4/2023 Partial Inspection CAMERON CHABAN
Final 5/23/2023 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 5/23/2023 Not Ready for Inspection JOHN KITCKO
Green Building Final 5/23/2023 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 5/23/2023 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 5/23/2023 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 5/23/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/23/2023 Approved JOHN KITCKO
T-Bar Ceiling 5/24/2023 Not Ready for Inspection JOHN KITCKO
Final 6/22/2023 Partial Inspection CAMERON CHABAN
Footing/Foundation/Slab 6/22/2023 Approved CAMERON CHABAN
Green Building Final 6/22/2023 Not Ready for Inspection CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 6/22/2023 SGSOV Not Ready CAMERON CHABAN
Smoke Detectors 6/22/2023 Not Ready for Inspection CAMERON CHABAN
Final 6/29/2023 Partial Inspection CAMERON CHABAN
Green Building Final 6/29/2023 Not Ready for Inspection CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 6/29/2023 SGSOV Not Ready CAMERON CHABAN
Smoke Detectors 6/29/2023 Not Ready for Inspection CAMERON CHABAN
Special/Order Compliance 6/29/2023 Conditional Approval STEVEN LEVITT
Final 7/25/2023 Not Ready for Inspection STEVEN LEVITT
Green Building Final 7/25/2023 Not Ready for Inspection STEVEN LEVITT
SGSOV-Seismic Gas S/O Valve 7/25/2023 SGSOV Not Ready STEVEN LEVITT
Smoke Detectors 7/25/2023 Not Ready for Inspection STEVEN LEVITT
Special/Order Compliance 7/27/2023 Corrections Issued STEVEN LEVITT
Final 8/2/2023 Partial Inspection CAMERON CHABAN
Green Building Final 8/2/2023 Partial Inspection CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 8/2/2023 SGSOV Approved CAMERON CHABAN
Smoke Detectors 8/2/2023 Approved CAMERON CHABAN
Final 8/8/2023 Partial Inspection CAMERON CHABAN
Green Building Final 8/8/2023 Approved CAMERON CHABAN
Final 8/17/2023 OK for TCO CAMERON CHABAN
Final 9/13/2023 Not Ready for Inspection ANDREW DORSO
Special/Order Compliance 2/9/2024 Partial Inspection CAMERON CHABAN
Final 6/27/2024 OK to Issue CofO CAMERON CHABAN