Pre-Inspection
|
6/28/2021
|
Approved
|
JOHN KITCKO
|
|
Pre-Inspection
|
6/28/2021
|
Partial Inspection
|
DANIEL VARNUM
|
|
Pre-Inspection
|
8/10/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Pre-Inspection
|
8/24/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/25/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Piling/Pier/Caisson
|
8/25/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
8/26/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/31/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/2/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Pre-Inspection
|
9/20/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/23/2021
|
Conditional Approval
|
RICKEY JACKSON
|
|
Footing/Foundation/Slab
|
9/23/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
10/7/2021
|
Partial Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/13/2021
|
Partial Approval
|
DANIEL VARNUM
|
|
Green Building Rough
|
10/13/2021
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
10/13/2021
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Verify Sprinkler Sign Off
|
10/13/2021
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
10/19/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/19/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Other (see comments)
|
10/20/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
10/20/2021
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
10/21/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Other (see comments)
|
10/22/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
10/26/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
10/28/2021
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Shotcrete
|
10/29/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
11/3/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
11/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
11/23/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
12/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
12/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/3/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/6/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
12/7/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
1/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
1/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
1/10/2022
|
Conditional Approval
|
ANDREW DORSO
|
|
Excavation/Setback/Form/Re-Bar
|
1/11/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
1/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
1/14/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
1/20/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
1/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
1/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/21/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
1/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
1/26/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
2/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
2/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
2/8/2022
|
Approved
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2022
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
2/22/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
2/22/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
2/25/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Green Building Rough
|
3/10/2022
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Verify Sprinkler Sign Off
|
3/10/2022
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
3/10/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Wall Anchors
|
3/17/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Drywall Nailing
|
3/25/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
4/4/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
4/13/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
4/13/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
4/13/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
4/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Other (see comments)
|
4/20/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/20/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Other (see comments)
|
4/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Insulation
|
4/21/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/26/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/26/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/26/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/2/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
5/6/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
5/13/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Insulation
|
5/13/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
5/16/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/16/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/16/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/23/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/23/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
5/24/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
5/24/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Wood Frame
|
5/24/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
5/26/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/27/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
5/27/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
5/27/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Insulation
|
5/31/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
6/1/2022
|
Approved
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
6/1/2022
|
Approved
|
CAMERON CHABAN
|
|
Wood Frame
|
6/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
6/6/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
6/6/2022
|
Partial Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
6/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
6/16/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
6/21/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Insulation
|
6/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
6/27/2022
|
Partial Approval
|
KENNETH ROBERTS
|
|
Insulation
|
6/30/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
7/5/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
7/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Insulation
|
7/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Insulation
|
7/12/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
7/14/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
7/15/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
7/15/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
T-Bar Ceiling
|
7/20/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Drywall Nailing
|
7/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
7/28/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
7/28/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Wood Frame
|
7/29/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
8/5/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
8/5/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Interior/Exterior Lathing
|
8/9/2022
|
Approved
|
CAMERON CHABAN
|
|
Drywall Nailing
|
8/17/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
8/22/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Wood Frame
|
8/22/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
T-Bar Ceiling
|
8/23/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
8/24/2022
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
8/30/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Drilled-In Anchors
|
9/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
9/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
9/14/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
9/21/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
9/22/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
10/24/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Light Gage Steel Frame
|
10/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Insulation
|
10/28/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
11/17/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
12/12/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Special/Order Compliance
|
12/12/2022
|
Approved
|
BRIAN KELLY
|
|
Wood Frame
|
1/6/2023
|
Partial Approval
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
1/25/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
1/30/2023
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
1/30/2023
|
Partial Approval
|
STEVEN LEVITT
|
|
Drywall Nailing
|
2/3/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
2/3/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
2/8/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
2/8/2023
|
Partial Inspection
|
STEVEN LEVITT
|
|
Drywall Nailing
|
2/15/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
2/15/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/21/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
2/21/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
2/23/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
2/23/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Drywall Nailing
|
3/6/2023
|
Approved
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/6/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
4/11/2023
|
Approved
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
4/13/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
5/4/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Final
|
5/23/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
5/23/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
5/23/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
5/23/2023
|
Approved
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
5/23/2023
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Smoke Detectors
|
5/23/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
5/23/2023
|
Approved
|
JOHN KITCKO
|
|
T-Bar Ceiling
|
5/24/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
6/22/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
6/22/2023
|
Approved
|
CAMERON CHABAN
|
|
Green Building Final
|
6/22/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
SGSOV-Seismic Gas S/O Valve
|
6/22/2023
|
SGSOV Not Ready
|
CAMERON CHABAN
|
|
Smoke Detectors
|
6/22/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Final
|
6/29/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Green Building Final
|
6/29/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
SGSOV-Seismic Gas S/O Valve
|
6/29/2023
|
SGSOV Not Ready
|
CAMERON CHABAN
|
|
Smoke Detectors
|
6/29/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
6/29/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Final
|
7/25/2023
|
Not Ready for Inspection
|
STEVEN LEVITT
|
|
Green Building Final
|
7/25/2023
|
Not Ready for Inspection
|
STEVEN LEVITT
|
|
SGSOV-Seismic Gas S/O Valve
|
7/25/2023
|
SGSOV Not Ready
|
STEVEN LEVITT
|
|
Smoke Detectors
|
7/25/2023
|
Not Ready for Inspection
|
STEVEN LEVITT
|
|
Special/Order Compliance
|
7/27/2023
|
Corrections Issued
|
STEVEN LEVITT
|
|
Final
|
8/2/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Green Building Final
|
8/2/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
SGSOV-Seismic Gas S/O Valve
|
8/2/2023
|
SGSOV Approved
|
CAMERON CHABAN
|
|
Smoke Detectors
|
8/2/2023
|
Approved
|
CAMERON CHABAN
|
|
Final
|
8/8/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Green Building Final
|
8/8/2023
|
Approved
|
CAMERON CHABAN
|
|
Final
|
8/17/2023
|
OK for TCO
|
CAMERON CHABAN
|
|
Final
|
9/13/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Special/Order Compliance
|
2/9/2024
|
Partial Inspection
|
CAMERON CHABAN
|
|
Final
|
6/27/2024
|
OK to Issue CofO
|
CAMERON CHABAN
|