1041 N CUMMINGS ST 1-18 90033

Certificate Information: 1041 N CUMMINGS ST 1-18 90033

Application / Permit
20010-10000-00616
Plan Check / Job No.
B20LA03727
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 4-STORY, TYPE VA, 18-UNIT, APARTMENT BUILDING OVER, 1 LEVEL, TYPE IA, AT GRADE PARKING. TOC TIER 2 PROJECT WITH 2 ELI & 2 VLI UNITS.
Permit Issued
Issued on 2/7/2022
Issuing Office
Current Status
CofO Issued on 5/15/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/15/2020 APPLICANT
Assigned to Plan Check Engineer 6/4/2020 KESETE HAREGOT
Corrections Issued 6/22/2020 KESETE HAREGOT
Disabled Access Plans Picked Up 7/7/2020 APPLICANT
Quality Review Completed 7/15/2020 TIEN JEN WANG
Applicant returned to address corrections 9/1/2020 KESETE HAREGOT
Building Plans Picked Up 4/19/2021 APPLICANT
Applicant returned to address corrections 6/25/2021 KESETE HAREGOT
Green Plans Picked Up 9/7/2021 APPLICANT
Plan Check Approved 12/9/2021 KESETE HAREGOT
Issued 2/7/2022 APPLICANT
CofO in Progress 5/7/2024 RAFAEL ESPINOZA
Permit Finaled 5/15/2024 ADAM BURGESS
CofO Issued 5/15/2024 ADAM BURGESS
Permit Finaled 5/15/2024 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 7/30/2020 CECILIO NAVARRO
Permit Cleared 7/30/2020 CECILIO NAVARRO
Clean Up Green Up Cleared 8/21/2020 RICHARD REASER
Miscellaneous Cleared 8/21/2020 RICHARD REASER
Trees in Parkway Cleared 9/22/2020 JOHN KIM
Work Adjacent to Public Way Cleared 9/24/2020 ARMEN SARKISIAN
Hydrant and Access approval Cleared 10/26/2020 MATTHEW CRAIG
Green Code Cleared 4/13/2021 VIVIAN LAO
Fire Marshall Fire Life Safety Cleared 7/26/2021 OSCAR SALGADO JR
Low Impact Development Cleared 8/2/2021 AMMAR ELTAWIL
DAS Clearance Cleared 8/26/2021 KESETE HAREGOT
Density Bonus 12.22.A.31 Cleared 9/7/2021 DORIS KWOK
Roof/Waste drainage to street Cleared 9/22/2021 CECILIO NAVARRO
Eng Process Fee Ord 176,300 Cleared 10/4/2021 CECILIO NAVARRO
Sewer availability Cleared 10/4/2021 CECILIO NAVARRO
Frnt yard landscape/Water mgmt Cleared 10/22/2021 MAXFIELD VERMY
Opn space landscape/Water mgmt Cleared 10/22/2021 MAXFIELD VERMY
Miscellaneous Cleared 10/27/2021 MAXFIELD VERMY
Building over 3-story or 36-ft Cleared 11/30/2021 CALOSHA APPROVED
GPI Written Notices Cleared 12/9/2021 KESETE HAREGOT
Grading Pre-Inspection Cleared 12/9/2021 KESETE HAREGOT

Contact Information

Architect Azimi,, Babak; Lic. No.: C31944 4940 CALVIN AVENUE      TARZANA, CA 91356
Contractor Line Electric Inc; Lic. No.: 910172-B 4055 WILSHIRE BLVD #506      LOS ANGELES, CA 90010
Engineer Moeini,, Soheil; Lic. No.: C84000 1836 PARNELL AVE 202      LOS ANGELES, CA 90025
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/8/2022 Corrections Issued TED RIES
Pre-Inspection 8/10/2022 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 9/15/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/19/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 9/20/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/5/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/5/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/5/2022 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/11/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/11/2022 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 10/17/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 10/17/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 10/18/2022 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 10/25/2022 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 10/25/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 10/25/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/25/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Shotcrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 11/2/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 12/1/2022 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/6/2023 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 1/9/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 1/12/2023 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/12/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/12/2023 Corrections Issued RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/12/2023 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 1/25/2023 Approved RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/27/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 2/21/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/21/2023 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 2/21/2023 Partial Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/7/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/7/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Wood Construction 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 3/23/2023 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/23/2023 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 3/23/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 3/23/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/28/2023 Partial Approval JULIAN CAPUCETTI
Deputy Wood Construction 3/30/2023 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/30/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 3/30/2023 Partial Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 4/26/2023 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/26/2023 Partial Inspection RAFAEL ESPINOZA
Wood Frame 4/26/2023 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 5/8/2023 Partial Approval RAFAEL ESPINOZA
Insulation 5/12/2023 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 5/17/2023 Partial Approval RAFAEL ESPINOZA
Insulation 6/16/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/23/2023 Partial Approval MARTIN TAVITIAN
Insulation 6/23/2023 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 6/23/2023 Partial Approval MARTIN TAVITIAN
Drywall Nailing 6/30/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/7/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/30/2023 Approved LARRY ARNICK
Footing/Foundation/Slab 9/21/2023 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 9/21/2023 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/4/2023 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 10/4/2023 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 10/31/2023 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 11/9/2023 Approved RAFAEL ESPINOZA
Final 4/3/2024 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 4/3/2024 Approved RAFAEL ESPINOZA
Green Building Final 4/3/2024 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 4/3/2024 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 4/3/2024 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 4/3/2024 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/3/2024 Approved RAFAEL ESPINOZA
Wood Frame 4/3/2024 Approved RAFAEL ESPINOZA
Final 5/6/2024 Partial Inspection RAFAEL ESPINOZA
Final 5/7/2024 OK to Issue CofO RAFAEL ESPINOZA