1511 N FAIRFAX AVE 1-62 90046

Certificate Information: 1511 N FAIRFAX AVE 1-62 90046

Application / Permit
20010-10000-00468
Plan Check / Job No.
B20LA02776
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
(N) 7-STORY MIXED USE BLDG. WITH 62-UNIT AFFORDABLE HOUSING PER DIR 2020-3348-TOC-SPR-HCA. CORE AND SHELL COMMERCIAL
Permit Issued
Issued on 4/12/2022
Issuing Office
Metro
Current Status
Issued on 4/12/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 1/20/2022 HERNAN ARREOLA
Issued 4/12/2022 APPLICANT
TCO Issued (Expire Date: 01-25-2026) 7/29/2025 RAFAEL ESPINOZA
TCO Issued (Expire Date: 09-06-2026) 3/10/2026 ADAM BURGESS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/14/2021 THOMAS LANG
Address approval Cleared 2/22/2021 RENZ SORIANO
Highway dedication Cleared 3/2/2021 THAN WIN
Driveway location Cleared 3/9/2021 MOHAMMAD HASAN
Internal circulation Cleared 3/9/2021 MOHAMMAD HASAN
Permit Cleared 3/9/2021 ELENA LOPEZ
Encroachment in public way Cleared 3/24/2021 ELAINE LEI
Sewer availability Cleared 4/5/2021 RENZ SORIANO
Building over 36-ft Cleared 5/14/2021 CALOSHA APPROVED
Green Code Cleared 6/15/2021 AARON COSTA
Hydrant and Access approval Cleared 6/24/2021 KURT CORRAL
Density Bonus 12.22.A.31 Cleared 7/8/2021 NICHOLAS KAWAZOE
Work Adjacent to Public Way Cleared 7/22/2021 ROSA SILVA
Low Impact Development Cleared 8/1/2021 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 8/6/2021 RENZ SORIANO
Fire Marshall Fire Life Safety Cleared 9/7/2021 MENOA AGHAJANI
DAS Clearance Cleared 10/8/2021 LAWRENCE QUIRANTE
Construction near power lines Cleared 11/18/2021 RIDWAN HARDY
"D" conditions Cleared 12/6/2021 KENTON TRINH
Comm Cor/Mini-Mall Cleared 12/6/2021 KENTON TRINH
Miscellaneous Cleared 12/6/2021 KENTON TRINH
Site Plan review Cleared 12/6/2021 KENTON TRINH
Opn space landscape/Water mgmt Cleared 12/8/2021 KENTON TRINH

Contact Information

Contractor Shangri - La Construction L P; Lic. No.: 926436-B 660 S FIGUEROA STREET STE 1888      LOS ANGELES, CA 90017

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 4/27/2022 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/26/2022 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/10/2022 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/27/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/27/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/29/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/29/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 8/10/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/10/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 8/10/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/12/2022 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/17/2022 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/22/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/24/2022 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 8/24/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/29/2022 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/2/2022 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 9/8/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/8/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 9/9/2022 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 9/9/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/9/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/9/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/23/2022 Not Ready for Inspection TED RIES
Excavation/Setback/Form/Re-Bar 9/26/2022 Partial Approval TED RIES
Green Building Rough 10/4/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 10/4/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/4/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 10/11/2022 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/18/2022 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/25/2022 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/26/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/1/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/1/2022 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/1/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 11/11/2022 Not Ready for Inspection JAMES POWERS
Green Building Rough 11/11/2022 Off-Hour Fees Due
Reinforced Concrete Frame 11/11/2022 Off-Hour Fees Due
Reinforced Concrete Frame 11/11/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/11/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 11/11/2022 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 11/16/2022 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 11/17/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 11/17/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/17/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/17/2022 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 11/23/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/23/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/23/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 12/9/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 12/9/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/9/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/9/2022 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/27/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 1/9/2023 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/17/2023 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/18/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/20/2023 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/20/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 1/20/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/20/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/20/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 1/24/2023 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 1/31/2023 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 2/1/2023 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/23/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 2/24/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/1/2023 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/2/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/6/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 3/6/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 3/6/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 3/6/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 3/8/2023 Partial Approval EDWIN GREGORYONA
Pre-Inspection 3/8/2023 Approved EDWIN GREGORYONA
Deputy Wood Construction 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 3/14/2023 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/16/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 3/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 3/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 3/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 3/29/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/29/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/3/2023 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/25/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 4/25/2023 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 5/8/2023 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 5/23/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/7/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 6/7/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 6/22/2023 Partial Approval ALFREDO LOPEZ
Wood Frame 6/27/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/10/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/10/2023 Partial Approval EDWIN GREGORYONA
Insulation 7/11/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 7/14/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/17/2023 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/17/2023 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 7/17/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 7/18/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/27/2023 Partial Inspection DAVID BURKHEAD
Masonry Wall/Backfill 8/14/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/16/2023 Partial Inspection DAVID BURKHEAD
Wood Frame 8/28/2023 Partial Inspection TIMOTHY POWELL
Floor/Roof Diaphrgm/Shear Wall 8/30/2023 Partial Approval EDWIN GREGORYONA
Insulation 9/7/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 9/13/2023 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/22/2023 Partial Approval EDWIN GREGORYONA
Insulation 9/26/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 9/29/2023 Partial Approval DAVID BURKHEAD
Insulation 10/3/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 10/3/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/5/2023 Partial Approval EDWIN GREGORYONA
Insulation 10/5/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/5/2023 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 10/13/2023 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/17/2023 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 10/30/2023 Partial Approval EDWIN GREGORYONA
Insulation 11/7/2023 Partial Approval DAVID BURKHEAD
Insulation 11/14/2023 Partial Inspection EDWIN GREGORYONA
Insulation 11/27/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/5/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/12/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/2/2024 Partial Approval EDWIN GREGORYONA
Insulation 1/2/2024 Partial Approval EDWIN GREGORYONA
Insulation 1/10/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/18/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/29/2024 Partial Approval DAVID BURKHEAD
Insulation 1/31/2024 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 1/31/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/6/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 2/13/2024 Partial Approval EDWIN GREGORYONA
Insulation 2/20/2024 Partial Approval EDWIN GREGORYONA
Insulation 2/22/2024 Partial Approval DAVID BURKHEAD
Wood Frame 2/26/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 2/27/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 2/27/2024 Corrections Issued JEFFREY FULTON
Wood Frame 2/27/2024 Partial Inspection JEFFREY FULTON
Insulation 3/4/2024 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 3/7/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/13/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/26/2024 Partial Approval DAVID BURKHEAD
Insulation 3/28/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/9/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/19/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/1/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/14/2024 Partial Approval LARRY ARNICK
Masonry Wall/Backfill 6/3/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/20/2024 Partial Approval DANIEL VARNUM
Drywall Nailing 9/25/2024 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/9/2024 Partial Approval DAVID BURKHEAD
Special/Order Compliance 11/7/2024 Partial Approval TIMOTHY POWELL
Light Gage Steel Frame 11/27/2024 Partial Approval DAVID BURKHEAD
Final 12/18/2024 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 12/18/2024 Approved DAVID BURKHEAD
Green Building Final 12/18/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 12/18/2024 Approved DAVID BURKHEAD
Reinforced Concrete Frame 12/18/2024 Partial Inspection DAVID BURKHEAD
Reinforced Masonry Frame 12/18/2024 Partial Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 12/18/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 12/18/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/18/2024 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/15/2025 Partial Approval EDWIN GREGORYONA
Final 1/22/2025 Not Ready for Inspection EDWIN GREGORYONA
Green Building Final 1/22/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/22/2025 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 1/22/2025 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 1/22/2025 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 1/22/2025 Approved EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/22/2025 Approved EDWIN GREGORYONA
Pre-Inspection 2/12/2025 Approved EDWIN GREGORYONA
Final 2/24/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 2/24/2025 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 2/24/2025 SGSOV Approved DAVID BURKHEAD
Final 3/13/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 3/13/2025 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 3/13/2025 Partial Inspection DAVID BURKHEAD
Final 5/29/2025 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 5/29/2025 Not Ready for Inspection DAVID BURKHEAD
Final 6/23/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 6/23/2025 Not Ready for Inspection DAVID BURKHEAD
Final 6/26/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 6/26/2025 Partial Inspection DAVID BURKHEAD
Final 7/24/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 7/24/2025 Approved DAVID BURKHEAD
Masonry Wall/Backfill 9/17/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/22/2025 Partial Inspection DAVID BURKHEAD
Drywall Nailing 10/27/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/19/2025 Partial Approval EDWIN GREGORYONA
Insulation 11/21/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/26/2025 Partial Approval DAVID BURKHEAD
Special/Order Compliance 1/6/2026 Approved DAVID BURKHEAD
Special/Order Compliance 1/30/2026 Approved DAVID BURKHEAD
Final 3/2/2026 Partial Inspection DAVID BURKHEAD
Final 3/10/2026 Partial Inspection DAVID BURKHEAD