1432 W MIRAMAR ST 1-94 90026

Certificate Information: 1432 W MIRAMAR ST 1-94 90026

Application / Permit
20010-10000-00312
Plan Check / Job No.
B20LA01750
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 7-story affordable housing apartment building with 94 units (93 affordable and 1 manager's unit) Type IIIA over Type IA. TOC Tier 3. (NO CONSTRUCTION SHALL COMMENCE UNTIL RETAINING WALL/SHORING PERMITS ARE ISSUED)
Permit Issued
Issued on 10/5/2022
Issuing Office
Metro
Current Status
CofO Issued on 2/5/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Plan Check Approved 10/5/2022 ARMEN JIVALAGIAN
Issued 10/5/2022 APPLICANT
TCO Issued (Expire Date: 02-17-2026) 8/21/2025 ERNESTO CORRAL
Permit Finaled 2/5/2026 ERNESTO CORRAL
CofO Issued 2/5/2026 ERNESTO CORRAL
Permit Finaled 2/5/2026 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 5/10/2022 STEVE MELGAR
Miscellaneous Cleared 5/16/2022 RYAN LY
Site Plan review Cleared 5/16/2022 RYAN LY
Eng Process Fee Ord 176,300 Cleared 6/9/2022 STEVE MELGAR
Trees in Parkway Cleared 6/28/2022 ADALBERTO VERA
Encroachment in public way Cleared 6/30/2022 MARYAM SAEDI
Construction near power lines Cleared 7/15/2022 RIDWAN HARDY
Construction within easement Cleared 7/15/2022 RIDWAN HARDY
Bicycle Parking Cleared 7/22/2022 MARYAM SAEDI
Green Code Cleared 8/2/2022 AARON COSTA
GPI Written Notices Cleared 8/5/2022 ARMEN JIVALAGIAN
Grading Pre-Inspection Cleared 8/5/2022 ARMEN JIVALAGIAN
Highway dedication Cleared 8/8/2022 STEVE MELGAR
Building over 3-story or 36-ft Cleared 8/10/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/10/2022 CALOSHA APPROVED
Sewer availability Cleared 8/19/2022 STEVE MELGAR
Internal circulation Cleared 8/21/2022 COLLINS ALLAN
Specific Plan Cleared 8/21/2022 COLLINS ALLAN
Work Adjacent to Public Way Cleared 8/23/2022 JOSE RODRIGUEZ
Density Bonus 12.22.A.31 Cleared 9/12/2022 DORIS KWOK
Hydrant and Access approval Cleared 9/12/2022 KURT CORRAL
Permit Cleared 9/13/2022 STEVE MELGAR
Low Impact Development Cleared 9/16/2022 JORGE MEJIA LEMUS
DCP conditions approval Cleared 9/19/2022 AUNG HOU
Frnt yard landscape/Water mgmt Cleared 9/19/2022 RYAN LY
Opn space landscape/Water mgmt Cleared 9/19/2022 RYAN LY
Public Housing Cleared 9/19/2022 AUNG HOU
DAS Clearance Cleared 9/20/2022 ARMEN JIVALAGIAN
Fire Marshall Fire Life Safety Cleared 9/20/2022 ANDREW KO
Miscellaneous Cleared 9/22/2022 RYAN LY
Roof/Waste drainage to street Cleared 9/22/2022 CHRISTOPHER ROCHA
Specific Plan Cleared 9/22/2022 RYAN LY

Contact Information

Architect Carson, Han, William; Lic. No.: C31806 719 N FAIRFAX AVE SUITE C      LOS ANGELES, CA 90046
Contractor United Building Company Inc; Lic. No.: 1034972-B 250 N. HARBOR DRIVE   SUITE 311    REDONDO BEACH, CA 90277
Engineer Adams,, Jelisa; Lic. No.: GE3092 26632 EL TOBOSO      MISSION VIEJO, CA 92691
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/16/2023 Partial Approval JAMES POWERS
Green Building Rough 2/16/2023 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/16/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/16/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/16/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/6/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 4/6/2023 Corrections Issued GREGORY POMISH
METHANE-Barrier 4/6/2023 Not Ready for Inspection GREGORY POMISH
METHANE-Subgrade 4/6/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/26/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 4/27/2023 Partial Inspection NICK DANERI
METHANE-Barrier 4/27/2023 Conditional Approval NICK DANERI
METHANE-Subgrade 4/27/2023 Conditional Approval NICK DANERI
Footing/Foundation/Slab 5/1/2023 Partial Approval GREGORY POMISH
METHANE-Barrier 5/1/2023 Approved GREGORY POMISH
METHANE-Subgrade 5/2/2023 Approved GREGORY POMISH
Deputy Reinf. Concrete 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/10/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 5/10/2023 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 5/10/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/10/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/10/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 5/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 5/15/2023 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 5/15/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/15/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/15/2023 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 5/17/2023 Conditional Approval GREGORY POMISH
Piling/Pier/Caisson 5/17/2023 Partial Approval GREGORY POMISH
Deputy Shotcrete 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 5/19/2023 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 5/19/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 5/19/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 5/19/2023 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 5/22/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 5/25/2023 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 5/25/2023 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 5/25/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 5/25/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/30/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 6/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 6/30/2023 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 6/30/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 7/25/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/16/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/18/2023 Conditional Approval GREGORY POMISH
Green Building Rough 8/18/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 8/18/2023 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 8/18/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/23/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/24/2023 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/24/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/25/2023 Partial Approval ADAM BURGESS
Deputy Reinf. Concrete 8/28/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/29/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/30/2023 Conditional Approval NICK DANERI
Piling/Pier/Caisson 8/30/2023 Partial Approval NICK DANERI
Piling/Pier/Caisson 8/31/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 9/1/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/1/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 9/5/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/20/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/21/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 9/21/2023 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/22/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/26/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/27/2023 Conditional Approval GREGORY POMISH
Green Building Rough 9/27/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 9/27/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/27/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/29/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/10/2023 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/30/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/30/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/31/2023 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 11/1/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/3/2023 Conditional Approval GREGORY POMISH
Deputy Wood Construction 11/14/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/14/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/15/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/16/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/28/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/28/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/29/2023 Conditional Approval GREGORY POMISH
Deputy Wood Construction 11/29/2023 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 11/30/2023 Partial Approval LARRY ARNICK
Light Gage Steel Frame 12/1/2023 Partial Approval GREGORY POMISH
Green Building Rough 12/5/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 12/5/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 12/5/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/8/2023 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/8/2023 Partial Approval GREGORY POMISH
Deputy Shotcrete 12/11/2023 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/11/2023 Partial Approval GREGORY POMISH
Deputy Shotcrete 12/12/2023 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 12/18/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 12/19/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 12/20/2023 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 1/5/2024 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/18/2024 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 1/18/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 1/19/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/30/2024 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 1/31/2024 Partial Approval GREGORY POMISH
Green Building Rough 2/13/2024 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 2/13/2024 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 2/13/2024 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 2/15/2024 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 2/21/2024 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 2/23/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 2/27/2024 Partial Inspection JEFFREY FULTON
Deputy Shotcrete 3/1/2024 Conditional Approval NICK DANERI
Drywall Nailing 3/1/2024 Partial Approval NICK DANERI
Piling/Pier/Caisson 3/1/2024 Partial Approval NICK DANERI
Green Building Rough 3/4/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 3/4/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/4/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/5/2024 Partial Inspection NICK DANERI
Deputy Shotcrete 3/6/2024 Conditional Approval NICK DANERI
Drywall Nailing 3/6/2024 Partial Approval NICK DANERI
Reinforced Concrete Frame 3/6/2024 Partial Approval NICK DANERI
Deputy Shotcrete 3/7/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 3/8/2024 Partial Approval JAMES POWERS
Drywall Nailing 3/14/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/14/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 3/29/2024 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 3/29/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/29/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 4/3/2024 Conditional Approval NICK DANERI
Green Building Rough 4/3/2024 Not Ready for Inspection NICK DANERI
Insulation 4/3/2024 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/3/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/3/2024 Not Ready for Inspection NICK DANERI
Insulation 4/17/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 4/24/2024 Partial Approval EDWIN GREGORYONA
Insulation 4/25/2024 Partial Approval NICK DANERI
Insulation 5/6/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/8/2024 Partial Approval NICK DANERI
Deputy Steel/Welding 5/22/2024 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/22/2024 Partial Approval NICK DANERI
Wood Frame 5/28/2024 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/30/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/3/2024 Partial Inspection NICK DANERI
Deputy Wood Construction 6/5/2024 Partial Approval JEROME BLACKWOOD
Floor/Roof Diaphrgm/Shear Wall 6/5/2024 Partial Approval JEROME BLACKWOOD
Floor/Roof Diaphrgm/Shear Wall 6/6/2024 Partial Approval NICK DANERI
Wood Frame 6/13/2024 Partial Approval NICK DANERI
Wood Frame 6/14/2024 Partial Approval LUIS CCAMACHO
Wood Frame 6/18/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/25/2024 Partial Approval JEROME BLACKWOOD
Insulation 6/28/2024 Partial Approval NICK DANERI
Deputy Wood Construction 7/1/2024 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/1/2024 Partial Approval NICK DANERI
Wood Frame 7/2/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/10/2024 Partial Approval LARRY ARNICK
Drywall Nailing 7/11/2024 Partial Approval LUIS CCAMACHO
Floor/Roof Diaphrgm/Shear Wall 7/11/2024 Not Ready for Inspection LUIS CCAMACHO
Insulation 7/15/2024 Partial Approval LUIS CCAMACHO
Drywall Nailing 7/16/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/16/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/17/2024 Partial Approval NICK DANERI
Drywall Nailing 7/24/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/24/2024 Partial Approval NICK DANERI
Drywall Nailing 7/26/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 7/29/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/29/2024 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/29/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/2/2024 Partial Approval NICK DANERI
Deputy Steel/Welding 8/5/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 8/5/2024 Partial Approval LARRY ARNICK
Drywall Nailing 8/8/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 8/8/2024 Partial Approval NICK DANERI
Drywall Nailing 8/12/2024 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/12/2024 Partial Approval NICK DANERI
Wood Frame 8/12/2024 Partial Approval NICK DANERI
Wood Frame 8/19/2024 Partial Approval NICK DANERI
Drywall Nailing 8/21/2024 Partial Approval NICK DANERI
Insulation 8/21/2024 Partial Approval NICK DANERI
Wood Frame 8/21/2024 Partial Approval NICK DANERI
Drywall Nailing 8/23/2024 Not Ready for Inspection NICK DANERI
Insulation 8/23/2024 Partial Approval NICK DANERI
Wood Frame 8/23/2024 Partial Approval NICK DANERI
Insulation 8/26/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 8/26/2024 Not Ready for Inspection NICK DANERI
Interior/Exterior Lathing 8/27/2024 Partial Approval LUIS CCAMACHO
Drywall Nailing 9/5/2024 Partial Approval NICK DANERI
Insulation 9/5/2024 Partial Approval NICK DANERI
Wood Frame 9/5/2024 Partial Approval NICK DANERI
Insulation 9/9/2024 Partial Approval NICK DANERI
Drywall Nailing 9/11/2024 Partial Approval NICK DANERI
Insulation 9/11/2024 Partial Approval NICK DANERI
Drywall Nailing 9/12/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/12/2024 Partial Inspection NICK DANERI
Drywall Nailing 9/13/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/13/2024 Conditional Approval NICK DANERI
Drywall Nailing 9/16/2024 Partial Approval LARRY ARNICK
Insulation 9/16/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 9/16/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 9/16/2024 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 9/17/2024 Conditional Approval NICK DANERI
Drywall Nailing 9/17/2024 Not Ready for Inspection NICK DANERI
Insulation 9/17/2024 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/18/2024 Partial Approval LARRY ARNICK
Insulation 9/18/2024 Partial Approval LARRY ARNICK
Insulation 9/19/2024 Partial Approval GREGORY POMISH
Drywall Nailing 9/26/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/26/2024 Partial Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/1/2024 Partial Approval NICK DANERI
Insulation 10/1/2024 Partial Approval NICK DANERI
Interior/Exterior Lathing 10/2/2024 Partial Approval LARRY ARNICK
Drywall Nailing 10/7/2024 Not Ready for Inspection NICK DANERI
Insulation 10/7/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 10/7/2024 Partial Approval NICK DANERI
Drywall Nailing 10/18/2024 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/18/2024 Partial Approval NICK DANERI
Insulation 10/18/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 10/22/2024 Not Ready for Inspection NICK DANERI
Insulation 10/30/2024 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 10/30/2024 Partial Approval LARRY ARNICK
Insulation 11/1/2024 Partial Approval LARRY ARNICK
Insulation 11/4/2024 Not Ready for Inspection NICK DANERI
Drywall Nailing 11/5/2024 Not Ready for Inspection LARRY ARNICK
Insulation 11/5/2024 Partial Approval LARRY ARNICK
Drywall Nailing 11/6/2024 Partial Inspection NICK DANERI
Light Gage Steel Frame 11/6/2024 Partial Approval NICK DANERI
Drywall Nailing 11/7/2024 Not Ready for Inspection JEROME BLACKWOOD
Insulation 11/7/2024 Partial Approval JEROME BLACKWOOD
Light Gage Steel Frame 11/12/2024 Partial Inspection NICK DANERI
Drywall Nailing 11/15/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 11/15/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/20/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 11/25/2024 Conditional Approval NICK DANERI
Light Gage Steel Frame 11/25/2024 Partial Approval NICK DANERI
Drywall Nailing 11/27/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 11/27/2024 Conditional Approval NICK DANERI
Drywall Nailing 12/2/2024 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 12/2/2024 Partial Approval LARRY ARNICK
Drywall Nailing 12/6/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 12/6/2024 Partial Inspection NICK DANERI
Drywall Nailing 12/9/2024 Conditional Approval NICK DANERI
Light Gage Steel Frame 12/9/2024 Partial Approval NICK DANERI
Drywall Nailing 12/12/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 12/12/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 12/16/2024 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 12/16/2024 Not Ready for Inspection NICK DANERI
Insulation 12/18/2024 Partial Approval NICK DANERI
Drywall Nailing 12/19/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/19/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/23/2024 Partial Inspection NICK DANERI
Light Gage Steel Frame 12/23/2024 Partial Approval NICK DANERI
Drywall Nailing 1/3/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/3/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 1/10/2025 Partial Approval PAUL BAZERKANIAN
Excavation/Setback/Form/Re-Bar 1/24/2025 Partial Approval NICK DANERI
Drywall Nailing 1/28/2025 Partial Inspection NICK DANERI
Light Gage Steel Frame 1/28/2025 Partial Approval NICK DANERI
Green Building Rough 1/30/2025 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 1/30/2025 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 1/30/2025 Not Ready for Inspection NICK DANERI
Insulation 2/4/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 2/6/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/11/2025 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/11/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/11/2025 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 2/14/2025 Partial Approval JAMES POWERS
Drywall Nailing 2/14/2025 Not Ready for Inspection JAMES POWERS
Insulation 2/14/2025 Partial Approval JAMES POWERS
Drywall Nailing 2/19/2025 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 2/19/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/24/2025 Partial Approval NICK DANERI
Insulation 2/24/2025 Conditional Approval NICK DANERI
Drywall Nailing 2/25/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 2/25/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 2/28/2025 Partial Approval NICK DANERI
Drywall Nailing 3/3/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 3/4/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 3/7/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 3/7/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 3/10/2025 Partial Approval LARRY ARNICK
Drywall Nailing 3/14/2025 Partial Approval LARRY ARNICK
Drywall Nailing 3/17/2025 Not Ready for Inspection LARRY ARNICK
Insulation 3/17/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 3/18/2025 Partial Approval LARRY ARNICK
Light Gage Steel Frame 3/25/2025 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 4/3/2025 Partial Approval NICK DANERI
Insulation 4/7/2025 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/10/2025 Partial Approval NICK DANERI
Green Building Rough 4/10/2025 Approved NICK DANERI
Reinforced Concrete Frame 4/10/2025 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/10/2025 Not Ready for Inspection NICK DANERI
Drywall Nailing 4/11/2025 Partial Approval LARRY ARNICK
Drywall Nailing 4/15/2025 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/21/2025 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/21/2025 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 4/23/2025 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/29/2025 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/30/2025 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/30/2025 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 5/29/2025 Partial Approval RAFAEL CORTES
Special/Order Compliance 6/9/2025 Approved EDWIN GREGORYONA
Verify Rec and Parks Fee Memo 6/9/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Steel/Welding 6/10/2025 Conditional Approval JOEY BUCHANAN
Special/Order Compliance 6/12/2025 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 6/18/2025 Conditional Approval JOEY BUCHANAN
Footing/Foundation/Slab 6/18/2025 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 6/18/2025 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 6/18/2025 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/20/2025 Conditional Approval JOEY BUCHANAN
Light Gage Steel Frame 6/20/2025 Corrections Issued JOEY BUCHANAN
Deputy Drilled-In Anchors 6/23/2025 Conditional Approval JOEY BUCHANAN
Wall Anchors 6/24/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 6/27/2025 Conditional Approval JOEY BUCHANAN
Reinforced Masonry Frame 6/27/2025 Partial Approval JOEY BUCHANAN
Verify Sprinkler Sign Off 6/27/2025 Approved JOEY BUCHANAN
Special/Order Compliance 7/17/2025 Approved JOEY BUCHANAN
Final 7/23/2025 Not Ready for Inspection JOEY BUCHANAN
Footing/Foundation/Slab 7/23/2025 Approved JOEY BUCHANAN
Green Building Final 7/23/2025 Approved JOEY BUCHANAN
Reinforced Concrete Frame 7/23/2025 Approved JOEY BUCHANAN
Reinforced Masonry Frame 7/23/2025 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 7/23/2025 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 7/23/2025 Approved JOEY BUCHANAN
Final 8/11/2025 Not Ready for Inspection JOEY BUCHANAN
Special/Order Compliance 8/11/2025 Approved JOEY BUCHANAN
Final 8/14/2025 OK for TCO JOEY BUCHANAN
Final 1/13/2026 Conditional Approval JOEY BUCHANAN
Special/Order Compliance 1/28/2026 Approved JOEY BUCHANAN
Final 2/3/2026 Conditional Approval JOEY BUCHANAN