Pre-Inspection
|
8/10/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
8/31/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Piling/Pier/Caisson
|
9/1/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/2/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/9/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/10/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/14/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/15/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/16/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/22/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
10/22/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
11/8/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
11/15/2021
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2021
|
Partial Approval
|
RICKEY JACKSON
|
|
Deputy Reinf. Concrete
|
11/19/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/22/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2021
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2021
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
11/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
11/24/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/29/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
11/30/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/30/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
12/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
12/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/6/2021
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/7/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Shotcrete
|
12/8/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/10/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
12/15/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
12/17/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
12/17/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/7/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/10/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/14/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
2/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/16/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
2/17/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
2/18/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
2/18/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/25/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
2/25/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
3/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
3/9/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/14/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
3/14/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
3/23/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
3/24/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/6/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/7/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/10/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
5/20/2022
|
Partial Approval
|
KENNETH ROBERTS
|
|
Deputy Reinf. Masonry
|
5/23/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/26/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/27/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
6/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/6/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
6/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
6/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
6/10/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/13/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
6/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/14/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wall Anchors
|
6/14/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
6/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
6/28/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/28/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/30/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
7/11/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
7/11/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
7/12/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/28/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/29/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
7/29/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/1/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
8/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/3/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
8/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Drilled-In Anchors
|
8/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
8/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
8/8/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/8/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
8/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
8/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
8/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
8/11/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
8/12/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/17/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
8/17/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
8/18/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/26/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/31/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
8/31/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
8/31/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
9/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
9/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
9/21/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/21/2022
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Insulation
|
9/21/2022
|
Partial Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
9/26/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
9/26/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Interior/Exterior Lathing
|
9/26/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2022
|
Approved
|
CAMERON CHABAN
|
|
Drywall Nailing
|
10/7/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
10/7/2022
|
Approved
|
CAMERON CHABAN
|
|
Insulation
|
10/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
10/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
10/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
10/12/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
10/13/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
10/28/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
10/28/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
10/28/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
10/28/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
11/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
11/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
11/21/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
11/21/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
11/23/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
11/23/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
11/23/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
11/30/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
11/30/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
11/30/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
11/30/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
12/7/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
12/7/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
12/7/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
12/7/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
12/7/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
12/7/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
12/9/2022
|
Corrections Issued
|
CAMERON CHABAN
|
|
Smoke Detectors
|
12/12/2022
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Special/Order Compliance
|
12/12/2022
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
12/21/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Interior/Exterior Lathing
|
12/21/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
12/21/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
12/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Wood Frame
|
12/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
12/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
12/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
1/11/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
1/11/2023
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Special/Order Compliance
|
2/2/2023
|
Approved
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
2/16/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
5/2/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
5/4/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Insulation
|
5/15/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
5/15/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
5/15/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Wood Frame
|
5/15/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
5/18/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
5/18/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
5/23/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
5/23/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
5/24/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
5/24/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
5/25/2023
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/26/2023
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
6/2/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/8/2023
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/15/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/3/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
7/6/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
8/1/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
8/18/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Final
|
1/31/2024
|
OK to Issue CofO
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
1/31/2024
|
Approved
|
CAMERON CHABAN
|
|
Green Building Final
|
1/31/2024
|
Approved
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
1/31/2024
|
Approved
|
CAMERON CHABAN
|
|
SGSOV-Seismic Gas S/O Valve
|
1/31/2024
|
SGSOV Approved
|
CAMERON CHABAN
|
|
Smoke Detectors
|
1/31/2024
|
Approved
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
1/31/2024
|
Approved
|
CAMERON CHABAN
|
|
Wood Frame
|
1/31/2024
|
Approved
|
CAMERON CHABAN
|
|
Final
|
2/1/2024
|
OK to Issue CofO
|
CAMERON CHABAN
|