Deputy Reinf. Concrete
|
6/1/2022
|
Approved
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
6/1/2022
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
6/13/2022
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
6/16/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/16/2022
|
Corrections Issued
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/22/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
6/22/2022
|
Corrections Issued
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
7/1/2022
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
7/5/2022
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/6/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
8/4/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
8/19/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
8/22/2022
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/25/2022
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
9/26/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
9/27/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
9/28/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
9/29/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
9/30/2022
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
10/3/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
10/4/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/5/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
10/13/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/14/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/17/2022
|
No Access for Inspection
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
10/18/2022
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Steel/Welding
|
10/19/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
10/20/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
10/21/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/24/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/25/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/26/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/27/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/28/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/31/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/1/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/2/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
11/3/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/4/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
11/10/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
11/21/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
11/22/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
11/23/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
11/29/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
11/30/2022
|
Partial Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/1/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/2/2022
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
Deputy Steel/Welding
|
12/6/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/7/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/8/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/9/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/13/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
12/14/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/15/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/16/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/20/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/21/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/22/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
12/23/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/3/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/17/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/18/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/19/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/20/2023
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/24/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/25/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/26/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
1/27/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/1/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/2/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/3/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/10/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/13/2023
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
2/14/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/15/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/16/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/17/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
2/21/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
2/21/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Steel/Welding
|
2/22/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
2/22/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Steel/Welding
|
2/23/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
2/23/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Steel/Welding
|
2/24/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/3/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/6/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/7/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/8/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/9/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/10/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/16/2023
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/17/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/24/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/28/2023
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/31/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/3/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/4/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/5/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/6/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/7/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/10/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/11/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/12/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/12/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/12/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
4/12/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/13/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/14/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/18/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/18/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/18/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/19/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/20/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/21/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/25/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/25/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
4/25/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/25/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/26/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
4/26/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/27/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
4/28/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/28/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
4/28/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/28/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
4/28/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/2/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/3/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/3/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/3/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/4/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/5/2023
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
Deputy Steel/Welding
|
5/8/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/8/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/9/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/10/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/11/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/12/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/15/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/15/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/16/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
5/17/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/17/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/17/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/18/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/18/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/18/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/19/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/22/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/23/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/24/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/25/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/26/2023
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/26/2023
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Steel/Welding
|
5/30/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
5/31/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/31/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
5/31/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/1/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/2/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/5/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/6/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/6/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/6/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/7/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Fireproofing
|
6/8/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/8/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/8/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
6/8/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Fireproofing
|
6/9/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/9/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
6/9/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Fireproofing
|
6/12/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
6/12/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/12/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Fireproofing
|
6/13/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/13/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Fireproofing
|
6/14/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/14/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/14/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/14/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Fireproofing
|
6/15/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/15/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Fireproofing
|
6/16/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
6/16/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/20/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/20/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
6/21/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/22/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/22/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/26/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
6/26/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/29/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/29/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/5/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/5/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
7/5/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
8/8/2023
|
Corrections Issued
|
JEFFREY FULTON
|
|
Pre-Inspection
|
4/17/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
4/25/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
4/25/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
4/25/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
4/25/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/3/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
5/3/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
5/3/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
5/3/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
5/14/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
5/14/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
5/14/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/14/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
5/17/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
5/23/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
5/24/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
5/28/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
5/29/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
5/30/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
5/31/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
6/3/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
6/5/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
6/6/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
6/6/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/6/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
6/10/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/28/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Structural Steel Frame
|
7/2/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Other (see comments)
|
7/3/2024
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Drywall Nailing
|
7/10/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Other (see comments)
|
7/11/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
7/11/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
7/17/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
7/31/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
9/3/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
9/23/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
10/2/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
10/2/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
11/13/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/12/2024
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/20/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
12/23/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
12/26/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/3/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Insulation
|
4/14/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
4/18/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
4/21/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
4/23/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
5/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/27/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
6/4/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
6/4/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
6/6/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/11/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
6/13/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
6/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/24/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
7/8/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/14/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
7/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/18/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
7/28/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
8/5/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
8/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
8/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
10/27/2025
|
Partial Approval
|
BRIAN KELLY
|