1011 N EVERETT ST Building B 90026

Certificate Information: 1011 N EVERETT ST Building B 90026

Application / Permit
20010-10000-00036
Plan Check / Job No.
B19LA04148
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New -3-story 39 unit multi residential building, building B over 1 level of subterranean parking. The project utilizes the city of Los Angeles affordable housing/denisty bonus provisions and have 3 designated affordable housing units DIR 2016-1039-DB
Permit Issued
Issued on 6/10/2021
Issuing Office
Metro
Current Status
CofO Issued on 12/23/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/28/2019 APPLICANT
Assigned to Plan Check Engineer 3/8/2019 QUAN NGHIEM
Green Plans Picked Up 3/14/2019 APPLICANT
Disabled Access Plans Picked Up 3/21/2019 APPLICANT
Corrections Issued 4/12/2019 QUAN NGHIEM
Building Plans Picked Up 4/23/2019 APPLICANT
Quality Review Completed 4/30/2019 SIAVOSH POURSABAHIAN
Applicant returned to address corrections 1/24/2020 QUAN NGHIEM
Applicant returned to address corrections 3/4/2020 QUAN NGHIEM
Applicant returned to address corrections 8/4/2020 QUAN NGHIEM
Applicant returned to address corrections 8/6/2020 QUAN NGHIEM
Applicant returned to address corrections 8/13/2020 QUAN NGHIEM
Applicant returned to address corrections 9/23/2020 QUAN NGHIEM
Applicant returned to address corrections 9/24/2020 QUAN NGHIEM
Plan Check Approved 3/12/2021 QUAN NGHIEM
Issued 6/10/2021 APPLICANT
TCO Issued (Expire Date: 08-27-2025) 2/28/2025 ADAM BURGESS
TCO Issued (Expire Date: 04-12-2026) 10/14/2025 ADAM BURGESS
Permit Finaled 12/23/2025 ERNESTO CORRAL
CofO Issued 12/23/2025 ERNESTO CORRAL
Permit Finaled 12/23/2025 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 1/14/2020 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 1/14/2020 ERIK BEASLEY
Highway dedication Cleared 1/14/2020 ERIK BEASLEY
Hydrant and Access approval Cleared 1/14/2020 ROBERT DUFF
Permit Cleared 1/14/2020 ERIK BEASLEY
Sewer availability Cleared 1/14/2020 ERIK BEASLEY
Trees in Parkway Cleared 1/17/2020 ADRIAN SANCHEZ
Density Bonus 12.22.A.25 Cleared 1/24/2020 JACOB COMER
DAS Clearance Cleared 3/11/2020 QUAN NGHIEM
Green Code Cleared 4/14/2020 QUAN NGHIEM
Low Impact Development Cleared 4/15/2020 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 4/16/2020 CECILIO NAVARRO
Fire Marshall Fire Life Safety Cleared 7/23/2020 OSCAR SALGADO JR
"Q" conditions Cleared 8/4/2020 PABLO ESTRADA
Frnt yard landscape/Water mgmt Cleared 8/4/2020 PABLO ESTRADA
Miscellaneous Cleared 8/4/2020 PABLO ESTRADA
Opn space landscape/Water mgmt Cleared 8/4/2020 PABLO ESTRADA
Site Plan review Cleared 8/4/2020 PABLO ESTRADA
Building over 3-story or 36-ft Cleared 8/13/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/13/2020 CALOSHA APPROVED

Contact Information

Architect Epstein,, Matthew D; Lic. No.: C29433 18100 BURBANK BLVD #22      TARZANA, CA 91356
Contractor Dynamic Design Build Inc; Lic. No.: 747205-B 11777 SAN VICENTE BLVD STE 800      LOS ANGELES, CA 90049
Engineer Garcia,, Ramon; Lic. No.: S4595 732 HOLBERTSON COURT      SIMI VALLEY, CA 93065

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/21/2021 Partial Approval RAFAEL ESPINOZA
Deputy Grading 7/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 7/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 7/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 7/23/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 8/17/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 8/17/2021 Not Ready for Inspection RAFAEL ESPINOZA
Piling/Pier/Caisson 9/9/2021 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/6/2021 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 10/6/2021 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 10/6/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 10/8/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Grading 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 10/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 10/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/1/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/8/2021 Partial Approval RAFAEL ESPINOZA
METHANE-Rough 11/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/8/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/17/2021 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 11/17/2021 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 11/17/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/17/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/17/2021 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 11/18/2021 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 11/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 11/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/23/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/23/2021 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 11/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 11/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 12/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/7/2021 Conditional Approval RAFAEL ESPINOZA
METHANE-Rough 12/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 12/7/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 12/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 12/13/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/17/2021 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 12/17/2021 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 12/17/2021 Not Ready for Inspection EDWIN GREGORYONA
Structural Steel Frame 12/17/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/20/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 1/7/2022 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 1/7/2022 Approved RAFAEL ESPINOZA
METHANE-Subgrade 1/7/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 1/7/2022 Partial Approval RAFAEL ESPINOZA
Green Building Rough 1/14/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 1/14/2022 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/19/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/26/2022 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/3/2022 Partial Approval RAFAEL ESPINOZA
Deputy Grading 2/4/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/8/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/9/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/10/2022 Conditional Approval RAFAEL ESPINOZA
METHANE-Rough 2/10/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 2/10/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/10/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/11/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/14/2022 Partial Approval RAFAEL ESPINOZA
METHANE-Rough 2/15/2022 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 2/15/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/15/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 2/17/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/22/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 2/22/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 2/22/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Masonry 2/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/25/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/25/2022 Partial Approval RAFAEL ESPINOZA
Deputy Grading 2/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 3/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/4/2022 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/28/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/28/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/2/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/2/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 5/3/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 5/4/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 5/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 10/13/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/19/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 10/21/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/24/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 12/7/2022 Corrections Issued RAFAEL ESPINOZA
Deputy Wood Construction 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/20/2023 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/20/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 2/6/2023 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 2/21/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/21/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 2/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 3/3/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/13/2023 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 3/13/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 3/13/2023 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/20/2023 Conditional Approval GREGORY POMISH
Deputy Wood Construction 3/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/23/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 3/23/2023 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 3/23/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 3/23/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/13/2023 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 4/13/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 4/13/2023 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/14/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 4/17/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 5/1/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 5/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/10/2023 Approved LARRY ARNICK
Deputy Drilled-In Anchors 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/19/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 5/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 6/16/2023 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 6/16/2023 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 6/16/2023 Not Ready for Inspection LARRY ARNICK
Wall Anchors 6/20/2023 Not Ready for Inspection LARRY ARNICK
Wood Frame 6/21/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 6/29/2023 Conditional Approval LARRY ARNICK
Insulation 6/29/2023 Corrections Issued LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/30/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/3/2023 Partial Approval LARRY ARNICK
Insulation 7/6/2023 Partial Approval LARRY ARNICK
Insulation 7/12/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/14/2023 Partial Approval LARRY ARNICK
Drywall Nailing 7/24/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 8/10/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 8/14/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 8/16/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 8/24/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 8/30/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 8/31/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 9/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 9/29/2023 Conditional Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 9/29/2023 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 10/5/2023 Conditional Approval LARRY ARNICK
Interior/Exterior Lathing 10/11/2023 Partial Approval LARRY ARNICK
Deputy Grading 10/27/2023 Conditional Approval MICHAEL ROSENBERG
Interior/Exterior Lathing 10/30/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/8/2023 Not Ready for Inspection LARRY ARNICK
Wood Frame 11/8/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/13/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/15/2023 Not Ready for Inspection LARRY ARNICK
Wood Frame 11/15/2023 Partial Approval LARRY ARNICK
Wood Frame 11/16/2023 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 11/17/2023 Partial Approval LARRY ARNICK
Drywall Nailing 12/4/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 12/5/2023 Partial Approval LARRY ARNICK
Insulation 12/8/2023 Not Ready for Inspection LARRY ARNICK
Insulation 12/13/2023 Not Ready for Inspection LARRY ARNICK
Insulation 12/14/2023 Partial Approval LARRY ARNICK
Drywall Nailing 12/21/2023 Partial Approval LARRY ARNICK
Insulation 12/21/2023 Partial Approval LARRY ARNICK
Drywall Nailing 12/29/2023 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/10/2024 Partial Approval LARRY ARNICK
Insulation 2/6/2024 Partial Approval LARRY ARNICK
Drywall Nailing 2/8/2024 Partial Approval LARRY ARNICK
Drywall Nailing 2/14/2024 Partial Approval LARRY ARNICK
Insulation 2/14/2024 Partial Approval LARRY ARNICK
Drywall Nailing 2/29/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 2/29/2024 Partial Approval LARRY ARNICK
Drywall Nailing 3/4/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 3/7/2024 Corrections Issued LARRY ARNICK
Drywall Nailing 3/12/2024 Partial Approval LARRY ARNICK
Deputy Grading 1/22/2025 Conditional Approval RAFAEL ESPINOZA
Final 2/27/2025 OK for TCO LARRY ARNICK
Footing/Foundation/Slab 2/27/2025 Approved LARRY ARNICK
Green Building Final 2/27/2025 Approved LARRY ARNICK
Reinforced Concrete Frame 2/27/2025 Approved LARRY ARNICK
Reinforced Masonry Frame 2/27/2025 Approved LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 2/27/2025 SGSOV Approved LARRY ARNICK
Smoke Detectors 2/27/2025 Approved LARRY ARNICK
Verify Sprinkler Sign Off 2/27/2025 Approved LARRY ARNICK
Wood Frame 2/27/2025 Approved LARRY ARNICK
Special/Order Compliance 7/29/2025 No Access for Inspection LARRY ARNICK
Final 12/17/2025 Not Ready for Inspection LARRY ARNICK