3608 N MULTIVIEW DR 90068

Certificate Information: 3608 N MULTIVIEW DR 90068

Application / Permit
19047-30000-01264
Plan Check / Job No.
B19WL04246
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW POOL WITH ATTACHED STRUCTURAL DECK ATTACHED TO THE PROPOSED SFD.
Permit Issued
Issued on 3/11/2020
Issuing Office
West Los Angeles
Current Status
CofO Issued on 9/4/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/26/2019 APPLICANT
Assigned to Plan Check Engineer 8/15/2019 TARIK SAOUD
Corrections Issued 8/19/2019 TARIK SAOUD
Quality Review Completed 8/30/2019 FELIX FIGUEROA
Building Plans Picked Up 8/30/2019 APPLICANT
Applicant returned to address corrections 11/1/2019 TARIK SAOUD
Plan Check Approved 3/9/2020 TARIK SAOUD
Issued 3/11/2020 LADBS
CofO in Progress 8/31/2021 BRIAN SULLIVAN
Permit Finaled 9/4/2021 DEROLD HAUFF
CofO Issued 9/4/2021 DEROLD HAUFF
Permit Finaled 9/4/2021 DEROLD HAUFF

Permit Application Clearance Information

Construction near power lines Cleared 2/5/2020 OSCAR CASTRO
Miscellaneous Cleared 2/5/2020 JOE LUCKEY
Sewer availability Cleared 2/5/2020 ERIK BEASLEY
Specific Plan Cleared 2/5/2020 JOE LUCKEY
Low Impact Development Cleared 2/10/2020 MARTIN FRAGOSO
Metro Rail approval Cleared 2/11/2020 TARIK SAOUD
Eng Process Fee Ord 176,300 Cleared 3/9/2020 DINAH GARIN
Grading Pre-Inspection Cleared 3/9/2020 TARIK SAOUD

Contact Information

Architect Ashai,, Tony; Lic. No.: C24154 9744 WILSHIRE BLVD #305      BEVERLY HILLS, CA 90212
Contractor Bluerock Construction Inc; Lic. No.: 1019407-B 9744 WILSHIRE BLVD STE 305      BEVERLY HILLS, CA 90212
Engineer Dedmari,, Wajahat Hafiz; Lic. No.: C66819 5541 GRAYLOG ST      RANCHO PALOS VERDES, CA 90275

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 3/16/2020 Approved BRIAN SULLIVAN
Deck 5/26/2020 Approved MATTHEW NUCKOLLS
Enclosure/Fence 1/11/2021 Corrections Issued BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 1/11/2021 Approved BRIAN SULLIVAN
Final 1/11/2021 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 1/11/2021 SGSOV Not Ready BRIAN SULLIVAN
Enclosure/Fence 1/25/2021 Not Ready for Inspection BRIAN SULLIVAN
Enclosure/Fence 2/10/2021 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 2/10/2021 SGSOV Approved BRIAN SULLIVAN
Enclosure/Fence 2/11/2021 Approved BRIAN SULLIVAN
Final 8/19/2021 Corrections Issued BRIAN SULLIVAN
Final 8/30/2021 OK to Issue CofO BRIAN SULLIVAN