9600 S AVIATION BLVD EITF-Rotary 90045
Certificate Information: 9600 S AVIATION BLVD EITF-Rotary 90045
- Application / Permit
- 19030-10000-03788
- Plan Check / Job No.
- B19LA12245
- Group
- Building
- Type
- Grading
- Sub-Type
- Commercial
- Primary Use
- (60) Grading - Non-Hillside
- Work Description
- LAX. NON-HILLSIDE GRADING FOR ITF EAST ROTARY UNDER PERMIT No.: 19020-10000-01615. 5,824 CU YD OF CUT, 2,030 CU YD FILL AND 3,794 CU YD EXPORT.
- Permit Issued
- Issued on 7/21/2021
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 6/18/2026
Permit Application Status History
| Submitted | 6/13/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 6/20/2019 | JOHN FRANCIA |
| Corrections Issued | 6/24/2019 | JOHN FRANCIA |
| Disabled Access Plans Picked Up | 6/28/2019 | APPLICANT |
| Quality Review Completed | 7/11/2019 | MINYE PAK |
| Building Plans Picked Up | 7/12/2019 | APPLICANT |
| Applicant returned to address corrections | 8/15/2019 | JOHN FRANCIA |
| Applicant returned to address corrections | 4/17/2020 | JOHN FRANCIA |
| Applicant returned to address corrections | 7/15/2020 | JOHN FRANCIA |
| Applicant returned to address corrections | 8/18/2020 | JOHN FRANCIA |
| Applicant returned to address corrections | 2/4/2021 | JOHN FRANCIA |
| Applicant returned to address corrections | 3/3/2021 | JOHN FRANCIA |
| Plan Check Approved | 7/20/2021 | JOHN FRANCIA |
| Issued | 7/21/2021 | APPLICANT |
| Permit Finaled | 6/17/2026 | JESUS RODRIGUEZ |
Permit Application Clearance Information
| Project Permit | Cleared | 8/8/2019 | JOHN FRANCIA |
| Tract Map conditions | Cleared | 8/8/2019 | ANNA VAN |
| Tract Map conditions | Cleared | 8/8/2019 | ANNA VAN |
| Tract Map conditions | Cleared | 8/8/2019 | ANNA VAN |
| Tract Map conditions | Cleared | 8/8/2019 | ANNA VAN |
| Tract Map conditions | Cleared | 8/8/2019 | ANNA VAN |
| Prkng lot landscape/Water mgmt | Cleared | 8/9/2019 | ANNA VAN |
| City owned building/parcel | Cleared | 8/13/2019 | HAROOT AVANESIAN |
| Construction near power lines | Cleared | 10/10/2019 | WALTER RAMIREZ |
| Construction within easement | Cleared | 10/10/2019 | WALTER RAMIREZ |
| Trees in Parkway | Cleared | 10/23/2019 | JOHN KIM |
| Eng Process Fee Ord 176,300 | Cleared | 12/13/2019 | MARYAM AZARBAYJANI |
| Metro Rail approval | Cleared | 2/10/2020 | JOHN FRANCIA |
| Address approval | Cleared | 2/14/2020 | MARYAM AZARBAYJANI |
| DAS Clearance | Cleared | 4/16/2020 | JOHN FRANCIA |
| Driveway location | Cleared | 4/28/2020 | PEDRO AYALA |
| Internal circulation | Cleared | 4/28/2020 | PEDRO AYALA |
| Specific Plan | Cleared | 4/28/2020 | PEDRO AYALA |
| Drainage to Storm Drain | Cleared | 12/30/2020 | MARYAM AZARBAYJANI |
| Encroachment in public way | Cleared | 12/30/2020 | MARYAM AZARBAYJANI |
| Miscellaneous | Cleared | 12/30/2020 | MARYAM AZARBAYJANI |
| Work Adjacent to Public Way | Cleared | 12/30/2020 | MARYAM AZARBAYJANI |
| Roof/Waste drainage to street | Cleared | 2/24/2021 | MARYAM AZARBAYJANI |
Contact Information
| Contractor | Fluor Flatiron Balfour Beatty Dragados; Lic. No.: 1036344-B | 205 W. DEWEY ST GOLDSBORO, NC 27530 |
| Engineer | Busch,, Noah L; Lic. No.: C65608 | 4101 CHESTNUT AVE LONG BEACH, CA 90807 |
| Engineer | Harrold,, Myles Robert; Lic. No.: C64770 | 1401 W ROBERTA AVE FULLERTON, CA 92833 |
| Engineer | Lee,, Giang Cam; Lic. No.: C87598 | 2819 GRANADA AVE EL MONTE, CA 91733 |
| Engineer | Werts,, Chester Anthony; Lic. No.: C49861 | 5449 40TH AVE SW OLYMPIA, WA 98512 |
Inspector Information
| JESUS RODRIGUEZ, (213) 216-1187 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Grading | 7/22/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 7/23/2021 | Approved | JONATHAN HOM |
| Rough | 7/23/2021 | Not Ready for Inspection | JONATHAN HOM |
| Excavation | 7/26/2021 | Partial Inspection | JONATHAN HOM |
| Deputy Grading | 7/27/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 7/28/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 7/29/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 7/30/2021 | Partial Approval | MATTHEW JENKINS |
| Bottom/Toe | 8/2/2021 | Not Ready for Inspection | JONATHAN HOM |
| Deputy Grading | 8/2/2021 | Approved | JONATHAN HOM |
| Excavation | 8/2/2021 | Partial Inspection | JONATHAN HOM |
| Deputy Grading | 8/3/2021 | Approved | JONATHAN HOM |
| Rough | 8/3/2021 | Conditional Approval | JONATHAN HOM |
| Deputy Grading | 8/4/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 8/5/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 8/6/2021 | Approved | JONATHAN HOM |
| Rough | 8/9/2021 | Conditional Approval | JONATHAN HOM |
| Deputy Grading | 8/10/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 8/11/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 8/12/2021 | Approved | JONATHAN HOM |
| Rough | 8/12/2021 | Partial Inspection | JONATHAN HOM |
| Deputy Grading | 8/13/2021 | Conditional Approval | JONATHAN HOM |
| Deputy Grading | 10/6/2021 | Conditional Approval | JONATHAN HOM |
| Excavation | 10/6/2021 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 10/7/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 10/8/2021 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 10/8/2021 | Partial Inspection | JONATHAN HOM |
| Drainage Devices/Catch Basin | 10/13/2021 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 11/22/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 11/23/2021 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 11/23/2021 | Partial Inspection | JONATHAN HOM |
| Deputy Grading | 11/24/2021 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 12/7/2021 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 12/8/2021 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 12/8/2021 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 12/9/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 12/10/2021 | Partial Approval | MATTHEW JENKINS |
| Deputy Grading | 12/13/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 12/14/2021 | No Access for Inspection | JONATHAN HOM |
| Deputy Grading | 12/15/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 12/16/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 12/17/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 12/22/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 12/28/2021 | Approved | JONATHAN HOM |
| Deputy Grading | 1/3/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/5/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/6/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/7/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/12/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/13/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/14/2022 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 1/14/2022 | Partial Inspection | JONATHAN HOM |
| Excavation | 1/14/2022 | Partial Inspection | JONATHAN HOM |
| Deputy Grading | 1/18/2022 | Partial Approval | MATTHEW JENKINS |
| Deputy Grading | 1/19/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/20/2022 | Conditional Approval | JONATHAN HOM |
| Excavation | 1/20/2022 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 1/21/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 1/28/2022 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 1/31/2022 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 2/1/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 2/2/2022 | Approved | PATRICK MISCHLICH |
| Drainage Devices/Catch Basin | 2/2/2022 | Approved | VASIL MIHALEV |
| Drainage Devices/Catch Basin | 2/10/2022 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 2/11/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 2/14/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 2/15/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 2/16/2022 | Partial Approval | MATTHEW JENKINS |
| Deputy Grading | 2/17/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 2/18/2022 | Approved | VASIL MIHALEV |
| Deputy Grading | 3/2/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 3/8/2022 | Approved | JONATHAN HOM |
| Excavation | 3/8/2022 | Not Ready for Inspection | JONATHAN HOM |
| Deputy Grading | 3/9/2022 | Approved | JONATHAN HOM |
| Rough | 3/9/2022 | Not Ready for Inspection | JONATHAN HOM |
| Deputy Grading | 3/10/2022 | Approved | JONATHAN HOM |
| Excavation | 3/10/2022 | Conditional Approval | JONATHAN HOM |
| Deputy Grading | 3/11/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 3/14/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 3/15/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 3/16/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 3/17/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 3/18/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 3/22/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/5/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/6/2022 | Approved | JONATHAN HOM |
| Excavation | 4/6/2022 | Not Ready for Inspection | JONATHAN HOM |
| Deputy Grading | 4/7/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/8/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/11/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/12/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/13/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/14/2022 | Approved | KIRK LINKLATER |
| Deputy Grading | 4/15/2022 | Approved | KIRK LINKLATER |
| Deputy Grading | 4/19/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/20/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/21/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/22/2022 | Approved | KIRK LINKLATER |
| Deputy Grading | 4/26/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 4/28/2022 | Approved | JONATHAN HOM |
| Rough | 5/3/2022 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 5/5/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 5/6/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 5/11/2022 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 5/11/2022 | Partial Inspection | JONATHAN HOM |
| Deputy Grading | 5/12/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 5/13/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 5/24/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 5/25/2022 | Approved | TIMOTHY POWELL |
| Deputy Grading | 5/26/2022 | Approved | TIMOTHY POWELL |
| Deputy Grading | 5/27/2022 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 6/7/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 6/8/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 6/9/2022 | Approved | KIRK LINKLATER |
| Deputy Grading | 6/10/2022 | Approved | MICHAEL TEMPLE |
| Deputy Grading | 7/26/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 7/27/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 7/28/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 7/29/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 8/8/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 8/9/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 8/10/2022 | Conditional Approval | MICHAEL TEMPLE |
| Deputy Grading | 8/11/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 8/12/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 8/15/2022 | Partial Approval | MICHAEL TEMPLE |
| Deputy Grading | 8/16/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 8/17/2022 | Approved | JONATHAN HOM |
| Deputy Grading | 9/14/2022 | Approved | JONATHAN HOM |
| Drainage Devices/Catch Basin | 10/18/2022 | Partial Approval | JONATHAN HOM |
| Drainage Devices/Catch Basin | 10/20/2022 | Partial Approval | JONATHAN HOM |
| Excavation | 10/20/2022 | Partial Inspection | JONATHAN HOM |
| Excavation | 10/21/2022 | No Access for Inspection | JONATHAN HOM |
| Special/Order Compliance | 10/21/2022 | Partial Inspection | JONATHAN HOM |
| Excavation | 12/9/2022 | Partial Inspection | TIMOTHY POWELL |
| Deputy Grading | 12/12/2022 | Approved | JONATHAN HOM |
| Excavation | 12/12/2022 | Not Ready for Inspection | JONATHAN HOM |
| Excavation | 12/13/2022 | Partial Inspection | JONATHAN HOM |
| Rough | 12/13/2022 | Partial Inspection | JONATHAN HOM |
| Deputy Grading | 1/24/2023 | Partial Approval | AL GAMBLE |
| Bottom/Toe | 1/25/2023 | Partial Approval | JONATHAN HOM |
| Deputy Grading | 1/25/2023 | Approved | AL GAMBLE |
| Rough | 3/14/2023 | Partial Inspection | VASIL MIHALEV |
| Deputy Grading | 4/24/2023 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 4/25/2023 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 4/26/2023 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 4/27/2023 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 4/28/2023 | Conditional Approval | MATTHEW JENKINS |
| Drainage Devices/Catch Basin | 4/28/2023 | Partial Approval | MATTHEW JENKINS |
| Deputy Grading | 5/1/2023 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 5/2/2023 | Conditional Approval | MATTHEW JENKINS |
| Drainage Devices/Catch Basin | 5/2/2023 | Partial Approval | MATTHEW JENKINS |
| Deputy Grading | 5/3/2023 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 5/4/2023 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 7/9/2024 | Approved | AL GAMBLE |
| Deputy Grading | 7/10/2024 | Approved | AL GAMBLE |
| Deputy Grading | 7/15/2024 | Approved | AL GAMBLE |
| Deputy Grading | 7/23/2024 | Conditional Approval | MATTHEW JENKINS |
| Deputy Grading | 7/24/2024 | Conditional Approval | MATTHEW JENKINS |
| Bottom/Toe | 3/13/2025 | Not Ready for Inspection | MATTHEW JENKINS |
| Excavation | 3/13/2025 | Not Ready for Inspection | MATTHEW JENKINS |
| Fill/Backfill | 3/13/2025 | Not Ready for Inspection | MATTHEW JENKINS |
| Bottom/Toe | 12/19/2025 | Partial Inspection | JOHNNY MIRANDA |
| Final | 12/19/2025 | Partial Inspection | JOHNNY MIRANDA |
| Rough | 12/19/2025 | Partial Inspection | JOHNNY MIRANDA |
| Approved Compaction Report | 3/2/2026 | Approved | JESUS RODRIGUEZ |
| Bottom/Toe | 3/2/2026 | Approved | JESUS RODRIGUEZ |
| Final | 3/2/2026 | Corrections Issued | JESUS RODRIGUEZ |
| Rough | 3/2/2026 | Approved | JESUS RODRIGUEZ |
| Final | 5/26/2026 | Not Ready for Inspection | JESUS RODRIGUEZ |
| Final | 6/17/2026 | Permit Finaled | JESUS RODRIGUEZ |