668 S ALAMEDA ST 90021
Certificate Information: 668 S ALAMEDA ST 90021
- Application / Permit
- 19020-10000-03038
- Plan Check / Job No.
- B19LA23755
- Group
- Building
- Type
- Nonbldg-New
- Sub-Type
- Commercial
- Primary Use
- (23) Shoring (Temporary)
- Work Description
- EARLY START TEMPORARY SHORING WITH LAGGING & SOLDIER PILES & WITH MAX. 40.5' HEIGHT PERMIT FOR New mixed use development consisting of 5 1evels of Type IllA residential above 2 level of on grade Type I commercial and parking and 3 levels of Type IA subteranean parking. .
- Permit Issued
- Issued on 10/16/2020
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 9/8/2023
Permit Application Status History
| Submitted | 11/7/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 11/14/2019 | GARO TELMI |
| Corrections Issued | 11/25/2019 | GARO TELMI |
| Quality Review Completed | 11/25/2019 | KEN GILL |
| Building Plans Picked Up | 11/27/2019 | APPLICANT |
| Applicant returned to address corrections | 4/29/2020 | GARO TELMI |
| Applicant returned to address corrections | 7/10/2020 | GARO TELMI |
| Applicant returned to address corrections | 9/23/2020 | GARO TELMI |
| Plan Check Approved | 9/30/2020 | GARO TELMI |
| Issued | 10/16/2020 | APPLICANT |
| Permit Finaled | 9/8/2023 | LARRY ARNICK |
Permit Application Clearance Information
| Address approval | Cleared | 2/7/2020 | THOMAS LANG |
| DAS Clearance | Cleared | 2/7/2020 | GARO TELMI |
| Green Code | Cleared | 2/7/2020 | GARO TELMI |
| Sewer availability | Cleared | 2/7/2020 | THOMAS LANG |
| Eng Process Fee Ord 176,300 | Cleared | 2/12/2020 | THOMAS LANG |
| Highway dedication | Cleared | 2/12/2020 | THOMAS LANG |
| Fire Marshall Fire Life Safety | Cleared | 2/13/2020 | ANDREW KO |
| Encroachment in public way | Cleared | 4/14/2020 | ELAINE LEI |
| Construction near power lines | Cleared | 5/8/2020 | RIDWAN HARDY |
| Construction within easement | Cleared | 5/8/2020 | RIDWAN HARDY |
| Miscellaneous | Cleared | 5/18/2020 | ANNA VIDAL |
| Low Impact Development | Cleared | 5/19/2020 | ORVAL HERNANDEZ-MARCI |
| Stormwater Pollution Mitigatn | Cleared | 5/19/2020 | ORVAL HERNANDEZ-MARCI |
| Roof/Waste drainage to street | Cleared | 5/29/2020 | THOMAS LANG |
| Excavation more than 5-ft deep | Cleared | 6/19/2020 | CALOSHA APPROVED |
| Opn space landscape/Water mgmt | Cleared | 6/22/2020 | VINCENT QUITORIANO |
| ZI | Cleared | 6/22/2020 | VINCENT QUITORIANO |
| "D" conditions | Cleared | 6/26/2020 | ERIN STRELICH |
| "T" removal | Cleared | 6/26/2020 | ERIN STRELICH |
| Senate Bill 35 | Cleared | 6/26/2020 | ERIN STRELICH |
| Site Plan review | Cleared | 6/26/2020 | ERIN STRELICH |
| Bicycle Parking | Cleared | 7/16/2020 | ELENA LOPEZ |
| Internal circulation | Cleared | 7/29/2020 | TAIMOUR TANAVOLI |
| Hydrant and Access approval | Cleared | 8/14/2020 | GILBERT URREA |
| Work Adjacent to Public Way | Cleared | 9/23/2020 | BOK GOH |
Contact Information
| Contractor | Malcolm Drilling Company Inc; Lic. No.: 259543-A | 92 NATOMA STREET SUITE 400 SAN FRANCISCO, CA 94105 |
| Engineer | Cords,, Donald Alan; Lic. No.: GE2529 | 3553 TEXAS ST SAN DIEGO, CA 92104 |
| Engineer | Young,, Don Yuk-Man; Lic. No.: C35713 | 149 PASADENA AVE STE B SOUTH PASADENA, CA 91030 |
Inspector Information
| RONALD JIMENEZ, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| LARRY ARNICK, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| JOEY BUCHANAN, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| ERNESTO CORRAL, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| RAFAEL ESPINOZA, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Steel/Welding | 11/5/2020 | Conditional Approval | RONALD PACHECO |
| Deputy Steel/Welding | 11/6/2020 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 11/9/2020 | Conditional Approval | RONALD PACHECO |
| Deputy Steel/Welding | 11/10/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/12/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/12/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/13/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/13/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/16/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/17/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/17/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Piling/Pier/Caisson | 11/17/2020 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Grading | 11/18/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/18/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/19/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/19/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/20/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/20/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/23/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/23/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/24/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/24/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/25/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/25/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 11/30/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 11/30/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/1/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/1/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/2/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/3/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/4/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/7/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/8/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/9/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/9/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/9/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/10/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/10/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/11/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/11/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/11/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 12/14/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/14/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/14/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/14/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/15/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/15/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/15/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/16/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/16/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/16/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/17/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/17/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/17/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/18/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 12/18/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/18/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Other (see comments) | 12/21/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/21/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Other (see comments) | 12/22/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/22/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Other (see comments) | 12/23/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 12/23/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Other (see comments) | 12/24/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/28/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/29/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/30/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 12/31/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/5/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/6/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/7/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/8/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/11/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/12/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 1/12/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/13/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 1/13/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/14/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 1/14/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/15/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 1/15/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/19/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 1/19/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 1/20/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Grading | 1/20/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Steel/Welding | 1/20/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Drilled-In Anchors | 1/21/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Grading | 1/21/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Steel/Welding | 1/21/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Drilled-In Anchors | 1/22/2021 | Conditional Approval | NICK DANERI |
| Deputy Grading | 1/22/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 1/22/2021 | Conditional Approval | NICK DANERI |
| Deputy Drilled-In Anchors | 1/25/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/25/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 1/26/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/26/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/27/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/28/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 1/29/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 2/1/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 2/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Excavation/Setback/Form/Re-Bar | 2/4/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Grading | 2/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 2/10/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 2/11/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 2/12/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 2/26/2021 | Partial Approval | MARK FERRARI |
| Deputy Grading | 3/1/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/1/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 3/2/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/2/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 3/3/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/3/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 3/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 3/5/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/8/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/12/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/17/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/18/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 3/22/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 3/23/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/24/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/25/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 3/26/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 3/26/2021 | Conditional Approval | NICK DANERI |
| Deputy Shotcrete | 3/26/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 4/1/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/7/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/8/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/12/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/13/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 4/14/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 4/15/2021 | Conditional Approval | RONALD PACHECO |
| Deputy Reinf. Masonry | 4/16/2021 | Conditional Approval | LANNY MERRICK |
| Deputy Reinf. Concrete | 4/27/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 4/29/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Shotcrete | 4/30/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 5/3/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 5/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 5/5/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 5/6/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 5/7/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 5/12/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Shotcrete | 5/21/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 6/2/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 6/3/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 6/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 6/7/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 6/8/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 6/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 6/11/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Shotcrete | 6/14/2021 | Partial Approval | EDWIN GREGORYONA |
| Deputy Shotcrete | 6/16/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Shotcrete | 6/18/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 8/20/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 8/23/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 8/24/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 8/25/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 8/26/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 8/27/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 9/16/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 9/17/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 10/29/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 11/10/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 2/1/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 2/2/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 2/3/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 3/21/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 3/22/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 3/23/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 3/24/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 3/25/2022 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 4/1/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/21/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/22/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 4/26/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 4/27/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 4/27/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 4/28/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 4/29/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 5/3/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 5/3/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 5/4/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 5/4/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 5/5/2022 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 5/5/2022 | Conditional Approval | NICK DANERI |
| Deputy Drilled-In Anchors | 5/6/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 5/6/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 5/9/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 5/9/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 5/16/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 5/18/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 5/25/2022 | Conditional Approval | TERRY HERR |
| Deputy Steel/Welding | 5/25/2022 | Conditional Approval | WINSTON DUNNING |
| Deputy Steel/Welding | 5/27/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 5/31/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/1/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/2/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/3/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 6/7/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/8/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/9/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/10/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/21/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 6/22/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/23/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/24/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/27/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/28/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/29/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/30/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/1/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 7/6/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/6/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 7/7/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/7/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 7/8/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 7/8/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 7/11/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/11/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 7/12/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 7/12/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 7/13/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/13/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 7/14/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/14/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 7/15/2022 | Conditional Approval | TED RIES |
| Deputy Steel/Welding | 7/15/2022 | Conditional Approval | TED RIES |
| Deputy Fireproofing | 7/18/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 7/18/2022 | Conditional Approval | WINSTON DUNNING |
| Deputy Reinf. Masonry | 7/21/2022 | Conditional Approval | WINSTON DUNNING |
| Deputy Steel/Welding | 7/21/2022 | Conditional Approval | WINSTON DUNNING |
| Deputy Steel/Welding | 7/29/2022 | Conditional Approval | WINSTON DUNNING |
| Deputy Steel/Welding | 8/2/2022 | Conditional Approval | WINSTON DUNNING |
| Deputy Steel/Welding | 8/9/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/20/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Final | 9/8/2023 | Permit Finaled | LARRY ARNICK |