3800 S VERMONT AVE 90037

Certificate Information: 3800 S VERMONT AVE 90037

Application / Permit
19020-10000-01210
Plan Check / Job No.
B19LA08686
Group
Building
Type
Nonbldg-New
Sub-Type
Commercial
Primary Use
(23) Miscellaneous Bldg/Structure
Work Description
DEFERRED HANGING GARDEN STRUCTURE OVER DESIGN BUILDING GARAGE FOR NEW LUCAS MUSEUM. NO FEE, ALREADY INCLUDED IN ORIGINAL PERMIT #17010-10023-01465.
Permit Issued
Issued on 1/14/2020
Issuing Office
Metro
Current Status
Permit Finaled on 4/24/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/8/2019 APPLICANT
Assigned to Plan Check Engineer 5/23/2019 MINYE PAK
Disabled Access Plans Picked Up 6/17/2019 APPLICANT
Corrections Issued 7/3/2019 MINYE PAK
Quality Review Completed 7/10/2019 CHARMIE HUYNH
Building Plans Picked Up 7/11/2019 APPLICANT
Applicant returned to address corrections 8/20/2019 MINYE PAK
Plan Check Approved 1/14/2020 MINYE PAK
Issued 1/14/2020 LADBS
Permit Finaled 4/24/2023 JAMES POWERS

Permit Application Clearance Information

No Data Available.

Contact Information

Architect Makowicki, Paul R; Lic. No.: C33907 523 WEST SIXTH ST   SUITE 430    LOS ANGELES, CA 90014
Contractor Hathaway Dinwiddie Construction Company; Lic. No.: 729664-B 275 BATTERY STREET SUITE 300      SAN FRANCISCO, CA 941113330
Engineer Espinosa, Pedro J; Lic. No.: GE2954 210 HILLVIEW DR      FREMONT, CA 94536
Engineer Faschan, William James; Lic. No.: S2937 40 WALL STREET 23RD FLOOR      NEW YORK, NY 100051339
Engineer Lera, Associates, Rllp; Lic. No.: C87771 40 WALL STREET   23RD FLOOR    NEW YORK, NY 10005
Geologist Lam, Patrick; Lic. No.: EG2490 2010 CROW CANYON PLACE   SUITE 250    SAN RAMON, CA 94583
Landscape Architect Hutchins, Jeffrey P; Lic. No.: LA3815 625 N HALLOCK AVE      SAN DIMAS, CA 91773

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/10/2020 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/11/2020 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/19/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 2/19/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/25/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/26/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/26/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 3/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/5/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 3/5/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 3/6/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 3/6/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 3/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/13/2020 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 3/13/2020 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 4/9/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/9/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/10/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/10/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/13/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/13/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/14/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/14/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/15/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/15/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/16/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/16/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/17/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/17/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/20/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/20/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/21/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/21/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/23/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/23/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/24/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/24/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/28/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/28/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/29/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 4/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/30/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 4/30/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/1/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/1/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/4/2020 Partial Approval LANNY MERRICK
Deputy Reinf. Concrete 5/4/2020 Partial Approval LANNY MERRICK
Deputy Shotcrete 5/4/2020 Partial Approval LANNY MERRICK
Deputy Drilled-In Anchors 5/5/2020 Partial Approval LANNY MERRICK
Deputy Reinf. Concrete 5/5/2020 Partial Approval LANNY MERRICK
Deputy Shotcrete 5/5/2020 Partial Approval LANNY MERRICK
Deputy Drilled-In Anchors 5/6/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/6/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/6/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/7/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/7/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/7/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/8/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/8/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/8/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/12/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/12/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/12/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/13/2020 Partial Approval LANNY MERRICK
Deputy Reinf. Concrete 5/13/2020 Partial Approval LANNY MERRICK
Deputy Shotcrete 5/13/2020 Partial Approval LANNY MERRICK
Deputy Drilled-In Anchors 5/14/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/14/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/14/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/15/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/15/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/15/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/18/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/18/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/18/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/19/2020 Partial Approval LANNY MERRICK
Deputy Shotcrete 5/19/2020 Partial Approval LANNY MERRICK
Deputy Drilled-In Anchors 5/20/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/20/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/20/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 5/20/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/21/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 5/21/2020 Conditional Approval LANNY MERRICK
Deputy Shotcrete 5/21/2020 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 5/21/2020 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 5/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 5/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/26/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/26/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/26/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 5/26/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/27/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/27/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/27/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 5/27/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/28/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/28/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/28/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/29/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/29/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/29/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/1/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/1/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/1/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/2/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 6/2/2020 Conditional Approval LANNY MERRICK
Deputy Shotcrete 6/2/2020 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 6/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/3/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 6/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/4/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/4/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/4/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/5/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 6/5/2020 Conditional Approval LANNY MERRICK
Deputy Shotcrete 6/5/2020 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 6/8/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 6/8/2020 Conditional Approval LANNY MERRICK
Deputy Shotcrete 6/8/2020 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 6/9/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/9/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/9/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/10/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/10/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/10/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/11/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 6/11/2020 Conditional Approval LANNY MERRICK
Deputy Shotcrete 6/11/2020 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 6/12/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 6/12/2020 Conditional Approval LANNY MERRICK
Deputy Shotcrete 6/12/2020 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 6/16/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/16/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/16/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/17/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/17/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/17/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/18/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/18/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/18/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/19/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/19/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/19/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 6/22/2020 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 7/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/20/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/23/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/31/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/7/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2020 Partial Approval JAMES POWERS