6001 W 96TH ST UNIT 67 90045

Certificate Information: 6001 W 96TH ST UNIT 67 90045

Application / Permit
19020-10000-00864
Plan Check / Job No.
B19LA06391
Group
Building
Type
Nonbldg-New
Sub-Type
Commercial
Primary Use
(23) Miscellaneous Bldg/Structure
Work Description
LAX GUIDEWAY SEGMENT 2GW3 FOR LAX AUTOMATED PEOPLE MOVER PROJECT PER AASHTO 6TH ED.
Permit Issued
Issued on 9/4/2019
Issuing Office
Metro
Current Status
CofO Issued on 5/23/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/29/2019 APPLICANT
Assigned to Plan Check Engineer 4/18/2019 DEAN RYAN REYES
Disabled Access Plans Picked Up 4/24/2019 APPLICANT
Corrections Issued 4/29/2019 DEAN RYAN REYES
Quality Review Completed 4/29/2019 WING SUEN
Building Plans Picked Up 4/30/2019 APPLICANT
Applicant returned to address corrections 8/27/2019 DEAN RYAN REYES
Plan Check Approved 8/29/2019 DEAN RYAN REYES
Issued 9/4/2019 LADBS
CofO in Progress 5/23/2025 NICK LAROCCA
Permit Finaled 5/23/2025 NICK LAROCCA
CofO Issued 5/23/2025 NICK LAROCCA
Permit Finaled 5/23/2025 NICK LAROCCA

Permit Application Clearance Information

City owned building/parcel Cleared 6/21/2019 HAROOT AVANESIAN
ZA Case Cleared 6/25/2019 KIT AWAKUNI
ZA Case Cleared 6/25/2019 KIT AWAKUNI
Tract Map conditions Cleared 7/2/2019 DIANA JIMENEZ
Tract Map conditions Cleared 7/2/2019 DIANA JIMENEZ
Tract Map conditions Cleared 7/2/2019 DIANA JIMENEZ
Project Permit Cleared 7/3/2019 DEAN RYAN REYES
Address approval Cleared 7/10/2019 MARYAM AZARBAYJANI
Eng Process Fee Ord 176,300 Cleared 7/10/2019 MARYAM AZARBAYJANI
Construction near power lines Cleared 7/15/2019 OSCAR CASTRO
DAS Clearance Cleared 7/18/2019 WAI LAU
Specific Plan Cleared 7/29/2019 PEDRO AYALA
Hydrant and Access approval Cleared 8/5/2019 JOHN CONNEALLY
Airport buildings Cleared 8/23/2019 ANDREW KO
Encroachment in public way Cleared 8/29/2019 MARYAM AZARBAYJANI
Excavation more than 5-ft deep Cleared 8/29/2019 CALOSHA APPROVED
Low Impact Development Cleared 8/29/2019 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 8/29/2019 MARYAM AZARBAYJANI
Work Adjacent to Public Way Cleared 8/29/2019 MARYAM AZARBAYJANI

Contact Information

Contractor Fluor Flatiron Balfour Beatty Dragados; Lic. No.: 1036344-B 5050 BUSINESS CENTER DRIVE   SUITE 250    FAIRFIELD, CA 94534
Engineer Bao,, Chi-Hon; Lic. No.: C47042 5117 LAURETTE STREET      TORRANCE, CA 90503
Engineer Duong,, Andy Gerald; Lic. No.: C73103 10291 MASTERSON RD      STANTON, CA 90680
Engineer Eaton,, Roger Anthony; Lic. No.: C76233 3102 ALGONQUIN TRAIL      LOWER BURRELL, PA 15068
Engineer Friedheim,, Marc; Lic. No.: C57968 3210 BERMUDA AVE      DAVIS, CA 95616
Engineer Kashighandi,, Pirooz; Lic. No.: GE3104 1417 S WESTGATE AVE 207      LOS ANGELES, CA 90025
Engineer Marcotte,, Jerome Russell; Lic. No.: C36844 132 HOPPER LANE      FOLSOM, CA 95630
Engineer Norboe,, Peter William; Lic. No.: C57519 4217 WINDSONG STREET      SACRAMENTO, CA 95834
Engineer Sims,, Charles Jeff; Lic. No.: C46471 8412 RUGGLES CT      FAIR OAKS, CA 95628
Engineer Werts,, Chester Anthony; Lic. No.: C49861 5449 40TH AVE SW      OLYMPIA, WA 98512

Inspector Information

NICK LAROCCA, (213) 473-2153 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Final 1/18/2020 Not Ready for Inspection JONATHAN ALLEN
Piling/Pier/Caisson 1/18/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 2/26/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 3/2/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 3/3/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 3/9/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 3/10/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 4/1/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 4/4/2020 Partial Approval NICK LAROCCA
Pre-Inspection 4/27/2020 Approved JONATHAN ALLEN
Pre-Inspection 4/28/2020 Approved JONATHAN ALLEN
Pre-Inspection 4/29/2020 Approved JONATHAN ALLEN
Reinforced Concrete Frame 5/6/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 5/22/2020 Approved JONATHAN ALLEN
Special/Order Compliance 7/21/2020 Corrections Issued JONATHAN ALLEN
Pre-Inspection 7/27/2020 Partial Approval TED RIES
Pre-Inspection 9/3/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/4/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/8/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/7/2020 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 12/8/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/9/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/10/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/11/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/14/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/15/2020 Conditional Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/16/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/17/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/18/2020 Not Ready for Inspection ALBERT COMISARI
Reinforced Concrete Frame 12/21/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/22/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/23/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/24/2020 Conditional Approval ALBERT COMISARI
Reinforced Concrete Frame 12/29/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/30/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/31/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/5/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/6/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/7/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/14/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/15/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/20/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/21/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/22/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/25/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/26/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/27/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/29/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/4/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 2/5/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/10/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/11/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 2/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/17/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 2/18/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/23/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 2/24/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 2/25/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/26/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/2/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/5/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/6/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/10/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 3/11/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/15/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/17/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/18/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/19/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 3/22/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/23/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/24/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/25/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/30/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/31/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/7/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/8/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 4/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/14/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/15/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/19/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/20/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/21/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/22/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/23/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 4/26/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/28/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/4/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/5/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/7/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/12/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/14/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/18/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/20/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/21/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/24/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/25/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/26/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/27/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/28/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/2/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/7/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/8/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/9/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/11/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/14/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/15/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/16/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/17/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/18/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/21/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/22/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/23/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/24/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/30/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/1/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/7/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/12/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 7/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/14/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/15/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 7/16/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 7/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/20/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/21/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/22/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/23/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/26/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/27/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/28/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/30/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/3/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 8/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/18/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 10/5/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 10/27/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 10/28/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/27/2022 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/31/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 4/13/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 4/18/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 4/27/2022 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 4/28/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 4/29/2022 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 5/2/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 5/11/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 5/12/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 5/25/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 6/30/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/15/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/18/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/21/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/22/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 8/3/2022 Partial Approval NICK LAROCCA
Pre-Inspection 1/20/2023 Approved ALAN NOVAK
Reinforced Concrete Frame 3/2/2023 Approved NICK LAROCCA
Pre-Inspection 3/13/2023 Approved NICK LAROCCA
Pre-Inspection 5/23/2023 Approved NICK LAROCCA
Reinforced Concrete Frame 5/23/2023 Approved NICK LAROCCA
Final 4/18/2024 Not Ready for Inspection NICK LAROCCA
Final 9/27/2024 OK to Issue CofO NICK LAROCCA