351 WORLD WAY UNIT 8 90045

Certificate Information: 351 WORLD WAY UNIT 8 90045

Application / Permit
19020-10000-00863
Plan Check / Job No.
B19LA06388
Group
Building
Type
Nonbldg-New
Sub-Type
Commercial
Primary Use
(23) Miscellaneous Bldg/Structure
Work Description
LAX GUIDEWAY SEGMENT 1GW1 FOR LAX AUTOMATED PEOPLE MOVER PROJECT PER AASHTO 6TH ED.
Permit Issued
Issued on 12/13/2019
Issuing Office
Metro
Current Status
CofO Issued on 8/5/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/29/2019 APPLICANT
Assigned to Plan Check Engineer 4/11/2019 DEAN RYAN REYES
Disabled Access Plans Picked Up 4/24/2019 APPLICANT
Corrections Issued 4/26/2019 DEAN RYAN REYES
Quality Review Completed 4/29/2019 WING SUEN
Building Plans Picked Up 4/30/2019 APPLICANT
Applicant returned to address corrections 6/17/2019 DEAN RYAN REYES
Applicant returned to address corrections 6/18/2019 DEAN RYAN REYES
Applicant returned to address corrections 11/13/2019 DEAN RYAN REYES
Applicant returned to address corrections 12/5/2019 DEAN RYAN REYES
Plan Check Approved 12/12/2019 DEAN RYAN REYES
Issued 12/13/2019 LADBS
CofO in Progress 8/5/2024 NICK LAROCCA
Permit Finaled 8/5/2024 NICK LAROCCA
CofO Issued 8/5/2024 NICK LAROCCA
Permit Finaled 8/5/2024 NICK LAROCCA

Permit Application Clearance Information

City owned building/parcel Cleared 6/21/2019 HAROOT AVANESIAN
ZA Case Cleared 6/25/2019 KIT AWAKUNI
ZA Case Cleared 6/25/2019 KIT AWAKUNI
ZA Case Cleared 6/25/2019 KIT AWAKUNI
ZA Case Cleared 6/25/2019 KIT AWAKUNI
ZA Case Cleared 6/25/2019 KIT AWAKUNI
ZA Case Cleared 6/26/2019 SOPHIE GABEL-SCHEINBAU
Project Permit Cleared 7/3/2019 DEAN RYAN REYES
Tract Map conditions Cleared 7/11/2019 SOPHIE GABEL-SCHEINBAU
Encroachment in public way Cleared 7/15/2019 MARYAM AZARBAYJANI
Eng Process Fee Ord 176,300 Cleared 7/15/2019 MARYAM AZARBAYJANI
Roof/Waste drainage to street Cleared 7/15/2019 MARYAM AZARBAYJANI
Work Adjacent to Public Way Cleared 7/15/2019 MARYAM AZARBAYJANI
Construction near power lines Cleared 7/17/2019 OSCAR CASTRO
Tract Map conditions Cleared 7/29/2019 DIANA JIMENEZ
Address approval Cleared 8/7/2019 JOSEPH RHYU
Low Impact Development Cleared 8/29/2019 ORVAL HERNANDEZ-MARCI
Specific Plan Cleared 9/30/2019 PEDRO AYALA
Hydrant and Access approval Cleared 10/3/2019 JOHN CONNEALLY
DAS Clearance Cleared 11/18/2019 DEAN RYAN REYES
DAS Clearance Cleared 11/18/2019 WAI LAU
Airport buildings Cleared 11/27/2019 ANDREW KO
Building over 3-story or 36-ft Cleared 12/12/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 12/12/2019 CALOSHA APPROVED

Contact Information

Contractor Fluor Flatiron Balfour Beatty Dragados; Lic. No.: 1036344-B 5050 BUSINESS CENTER DRIVE   SUITE 250    FAIRFIELD, CA 94534
Engineer Duong,, Andy Gerald; Lic. No.: C73103 10291 MASTERSON RD      STANTON, CA 90680
Engineer Eaton,, Roger Anthony; Lic. No.: C76233 3102 ALGONQUIN TRAIL      LOWER BURRELL, PA 15068
Engineer Kashighandi,, Pirooz; Lic. No.: GE3104 1417 S WESTGATE AVE 207      LOS ANGELES, CA 90025
Engineer Marcotte,, Jerome Russell; Lic. No.: C36844 132 HOPPER LANE      FOLSOM, CA 95630
Engineer Norboe,, Peter William; Lic. No.: C57519 4217 WINDSONG STREET      SACRAMENTO, CA 95834
Engineer Perkins,, Jacob James; Lic. No.: C90012       ,
Engineer Sims,, Charles Jeff; Lic. No.: C46471 8412 RUGGLES CT      FAIR OAKS, CA 95628
Engineer Werts,, Chester Anthony; Lic. No.: C49861 5449 40TH AVE SW      OLYMPIA, WA 98512

Inspector Information

NICK LAROCCA, (213) 473-2153 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 2/20/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 3/4/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 3/6/2020 Not Ready for Inspection ALBERT COMISARI
Pre-Inspection 11/4/2020 Approved JONATHAN ALLEN
Reinforced Concrete Frame 12/7/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/8/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/9/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/10/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/11/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/14/2020 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 12/15/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/16/2020 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 12/17/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/18/2020 Not Ready for Inspection ALBERT COMISARI
Reinforced Concrete Frame 12/21/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/22/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/23/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/24/2020 Not Ready for Inspection ALBERT COMISARI
Reinforced Concrete Frame 12/29/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/30/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/31/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/5/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/6/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/7/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/14/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/15/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/20/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/21/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/22/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/25/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/26/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/27/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 1/29/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/1/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 2/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/4/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 2/5/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/8/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 2/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/10/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 2/11/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/17/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/18/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/23/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/24/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 2/25/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/26/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/2/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/5/2021 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 3/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/10/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/11/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/15/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/16/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/17/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/18/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/19/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 3/22/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/23/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/24/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 3/25/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/30/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 3/31/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/7/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/7/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/8/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 4/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/13/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/14/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/15/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/20/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/21/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 4/22/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/23/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 4/26/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 4/28/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/4/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/5/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/7/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/12/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/13/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/14/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/18/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 5/20/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 5/21/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/24/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/25/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/26/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/27/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/28/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/2/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/7/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/8/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/9/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/11/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 6/14/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/15/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/15/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/17/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/18/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/21/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/22/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/23/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/24/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 6/30/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/7/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/9/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/12/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 7/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/14/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/15/2021 Not Ready for Inspection ALAN NOVAK
Reinforced Concrete Frame 7/16/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 7/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/20/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/21/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/22/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/23/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/26/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/27/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 7/28/2021 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 7/30/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/4/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 8/6/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 8/10/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/17/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/18/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 8/20/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 8/25/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/26/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 8/27/2021 Not Ready for Inspection JONATHAN ALLEN
Deputy Reinf. Concrete 9/21/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 9/22/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 9/23/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 9/24/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 9/27/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 9/27/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 9/28/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 9/29/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 9/30/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/1/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/1/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/4/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/6/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/7/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/8/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/8/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/12/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/12/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/13/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/13/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 10/13/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/14/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/14/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 10/14/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/15/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/15/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 10/15/2021 Not Ready for Inspection JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/18/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/18/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/19/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/19/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 10/19/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/20/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/20/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 10/20/2021 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 10/22/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/25/2021 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 10/26/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/27/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/28/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/2/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/3/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/4/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/5/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/8/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/9/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/9/2021 Not Ready for Inspection JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/10/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/10/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/12/2021 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 11/12/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/15/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/15/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/16/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/17/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/17/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/18/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/18/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 11/18/2021 Pending Review
Deputy Pre-Stress Concrete 11/19/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/22/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/23/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 11/23/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/23/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/24/2021 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 11/24/2021 Conditional Approval JONATHAN ALLEN
Reinforced Concrete Frame 11/24/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/29/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 11/29/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 11/30/2021 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 11/30/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/1/2021 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/1/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/2/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 12/2/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/3/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 12/3/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/6/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/6/2021 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 12/6/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/9/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 12/9/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/10/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/13/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/14/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/15/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/16/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 12/16/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/17/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/20/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/21/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/27/2021 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/27/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/28/2021 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/28/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/29/2021 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/29/2021 Conditional Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/30/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 12/30/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/3/2022 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/3/2022 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/4/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 1/4/2022 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/5/2022 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/6/2022 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/7/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 1/7/2022 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/10/2022 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/11/2022 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/12/2022 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/13/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/14/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 1/14/2022 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/18/2022 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/19/2022 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/19/2022 Not Ready for Inspection JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/20/2022 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/21/2022 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/24/2022 Approved JONATHAN ALLEN
Reinforced Concrete Frame 1/24/2022 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/25/2022 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/26/2022 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/27/2022 Approved JONATHAN ALLEN
Reinforced Concrete Frame 1/27/2022 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/28/2022 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 1/31/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 2/1/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/1/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 2/2/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 2/3/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/3/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 2/4/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/4/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 2/7/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/7/2022 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 2/8/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/8/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 2/9/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 2/10/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 2/11/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 2/11/2022 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/14/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/14/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 2/15/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 2/16/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/16/2022 Partial Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 2/17/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/17/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 2/18/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 2/23/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/23/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 2/24/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 2/25/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 2/25/2022 Partial Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 2/28/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/1/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/2/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 3/2/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 3/3/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/4/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 3/7/2022 Partial Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 3/8/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/9/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 3/9/2022 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 3/10/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/11/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 3/11/2022 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 3/12/2022 Off-Hour Fees Due
Reinforced Concrete Frame 3/12/2022 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 3/14/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/15/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/16/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/17/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 3/17/2022 Not Ready for Inspection ALAN NOVAK
Deputy Pre-Stress Concrete 3/18/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 3/18/2022 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/22/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/23/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/24/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/25/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/29/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/30/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/30/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 3/30/2022 Partial Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 3/31/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/31/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/1/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/1/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/4/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/4/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/5/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/5/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/6/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/7/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/8/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 4/8/2022 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 4/11/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/12/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/13/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/14/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/15/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/18/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/22/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/25/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/26/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/27/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/28/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/2/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/3/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/4/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/5/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/6/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/11/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/12/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/13/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/16/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/17/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/17/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/18/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/19/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/20/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/23/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/1/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/2/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/3/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/6/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/7/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/8/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/9/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/10/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/22/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/23/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/24/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/27/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/28/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/30/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/1/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/5/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 7/6/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/7/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/8/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/11/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/12/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/13/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/14/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/15/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/18/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/19/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 7/19/2022 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 7/20/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/21/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/25/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/26/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/27/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/28/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 7/29/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/1/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/2/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/3/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/4/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/5/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/8/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/9/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/10/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/11/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/12/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/15/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/16/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/17/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/19/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/22/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 8/23/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/24/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/25/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/26/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/29/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/30/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/31/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/1/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/2/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/6/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/7/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/8/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/9/2022 Approved NICK LAROCCA
Pre-Inspection 9/9/2022 No Access for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 9/12/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/13/2022 Approved NICK LAROCCA
Pre-Inspection 9/19/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 10/4/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/6/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/7/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/11/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/12/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/13/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/14/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/17/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/18/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/19/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/20/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/21/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/24/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/25/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 10/25/2022 Not Ready for Inspection ALAN NOVAK
Deputy Drilled-In Anchors 10/26/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/27/2022 Conditional Approval ALAN NOVAK
Reinforced Concrete Frame 10/27/2022 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/28/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 10/31/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/1/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/2/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 11/2/2022 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 11/3/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/4/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/7/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/8/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/9/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 11/9/2022 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 11/10/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/14/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/15/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 11/15/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/16/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/17/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/18/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 11/18/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/21/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/22/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/23/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/28/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/29/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 11/30/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/1/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/2/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/5/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/6/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/7/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/8/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/9/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/12/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/13/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/14/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/15/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/16/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/19/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/20/2022 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/21/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 12/22/2022 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 1/3/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/4/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/5/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/6/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/9/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/10/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/11/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/18/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/19/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/20/2023 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 1/23/2023 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 1/24/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/25/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/26/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/27/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/30/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/31/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 2/1/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 2/2/2023 Approved NICK LAROCCA
Deputy Drilled-In Anchors 2/3/2023 Approved NICK LAROCCA
Final 4/18/2024 Not Ready for Inspection NICK LAROCCA
Final 8/5/2024 OK to Issue CofO NICK LAROCCA