6015 S RAYMOND AVE 90044
Certificate Information: 6015 S RAYMOND AVE 90044
- Application / Permit
- 19016-70000-37862
- Plan Check / Job No.
- X19SL04032
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) of Title 24. Kitchen/bathroom remodel for residential buildings (no structural changes). **Related Electrical, Heating, and Plumbing included.**
- Permit Issued
- Issued on 2/18/2020
- Issuing Office
- South Los Angeles
- Current Status
- Permit Finaled on 4/29/2020
Permit Application Status History
| Issued | 2/18/2020 | LADBS |
| Permit Finaled | 4/29/2020 | FREDDIE RIVERA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Arrow Construction Co; Lic. No.: 573067-B | 18729 CLARK DALE AVE #C ARTESIA, CA 90701 |
Inspector Information
| BARRY HACHE, (213) 202-9851 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Interior/Exterior Lathing | 2/25/2020 | Corrections Issued | FREDDIE RIVERA |
| PLUMBING-Rough | 2/25/2020 | Corrections Issued | FREDDIE RIVERA |
| ELECTRICAL-Rough | 3/2/2020 | Not Ready for Inspection | FREDDIE RIVERA |
| PLUMBING-Rough | 3/2/2020 | Not Ready for Inspection | FREDDIE RIVERA |
| BUILDING-Rough-Frame | 3/4/2020 | Approved | FREDDIE RIVERA |
| ELECTRICAL-Rough | 3/4/2020 | Approved | FREDDIE RIVERA |
| Floor/Roof Diaphrgm/Shear Wall | 3/4/2020 | Approved | FREDDIE RIVERA |
| PLUMBING-Rough | 3/4/2020 | Approved | FREDDIE RIVERA |
| Final | 3/25/2020 | Corrections Issued | JOAQUIN GREENOUGH |
| Smoke Detectors | 3/25/2020 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| Final | 4/9/2020 | Not Ready for Inspection | SABAS ALONSO |
| Smoke Detectors | 4/9/2020 | Not Ready for Inspection | SABAS ALONSO |
| Final | 4/24/2020 | Not Ready for Inspection | FREDDIE RIVERA |
| HVAC-Final | 4/28/2020 | Approved | FREDDIE RIVERA |
| PLUMBING-Final | 4/28/2020 | Approved | FREDDIE RIVERA |
| Final | 4/29/2020 | Permit Finaled | FREDDIE RIVERA |
| Smoke Detectors | 4/29/2020 | Approved | FREDDIE RIVERA |