1475 W 22ND ST 90007
Certificate Information: 1475 W 22ND ST 90007
- Application / Permit
- 19016-40000-39282
- Plan Check / Job No.
- X19SP05883
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with class A or B material weighing less than 6 pounds per sq. Ft. Over existing solid sheathing 28 squares. Class a roof covering is required within very high fire hazard severity zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply cool roof product labeled and certified by cool roof rating council (CRRC). Cool roof may be required for non-residential buildings per title 24, part 6, section 141.0 (b) 2b.
- Permit Issued
- Issued on 1/9/2020
- Issuing Office
- San Pedro
- Current Status
- Permit Finaled on 9/28/2020
Permit Application Status History
| Issued | 1/9/2020 | LADBS |
| Permit Finaled | 9/28/2020 | KATHRYN BUTTERWORTH |
Permit Application Clearance Information
| HPOZ | Cleared | 1/8/2020 | KATIE DEBIASE |
Contact Information
| Contractor | Benitez Roofing; Lic. No.: 1041404-C39 | 3302 S BIRCH ST SANTA ANA, CA 92707 |
Inspector Information
| WILLIAM SIERRA, (213) 202-3122 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 1/11/2020 | Approved | JOAQUIN GREENOUGH |
| Final | 1/17/2020 | Corrections Issued | DAVID CHAN |
| SGSOV-Seismic Gas S/O Valve | 1/17/2020 | SGSOV Not Ready | DAVID CHAN |
| Smoke Detectors | 1/17/2020 | No Access for Inspection | DAVID CHAN |
| Final | 2/6/2020 | Not Ready for Inspection | ROBERT MCDOWELL |
| SGSOV-Seismic Gas S/O Valve | 2/6/2020 | SGSOV Not Ready | ROBERT MCDOWELL |
| Smoke Detectors | 2/6/2020 | Not Ready for Inspection | ROBERT MCDOWELL |
| Final | 2/10/2020 | Not Ready for Inspection | RICHARD STEINBACH |
| Smoke Detectors | 2/10/2020 | Approved | RICHARD STEINBACH |
| Final | 9/28/2020 | Permit Finaled | KATHRYN BUTTERWORTH |
| SGSOV-Seismic Gas S/O Valve | 9/28/2020 | SGSOV Approved | KATHRYN BUTTERWORTH |