2873 S MOTOR AVE 90064

Certificate Information: 2873 S MOTOR AVE 90064

Application / Permit
19016-30000-36095
Plan Check / Job No.
B19WL06260
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior & exterior alteration to (e) SFD with door and windows changeout and add a new cantilevered balcony at rear side.
Permit Issued
Issued on 4/26/2021
Issuing Office
Current Status
Permit Finaled on 3/30/2023

Permit Application Status History

Submitted 11/7/2019 APPLICANT
Assigned to Plan Check Engineer 11/14/2019 ALFREDO JARA
Corrections Issued 11/15/2019 ALFREDO JARA
Building Plans Picked Up 11/20/2019 APPLICANT
Plan Check Approved 12/5/2019 REZA HAGHIGHAT
Issued 4/26/2021 APPLICANT
Permit Finaled 3/28/2023 ASHLEY THOMPSON

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/25/2019 HISASHI KOBAYAKAWA
Grading Pre-Inspection Cleared 11/25/2019 AL GAMBLE
Roof/Waste drainage to street Cleared 11/25/2019 HISASHI KOBAYAKAWA

Contact Information

Contractor Alisal Builders Corp; Lic. No.: 732777-B P O BOX 6038      SAN PEDRO, CA 90734
Engineer Niver,, Kenneth Earl; Lic. No.: S2554 10845 LINDBROOK DR STE 203      W LOS ANGELES, CA 90024

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/29/2021 Partial Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 7/12/2021 Conditional Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 9/13/2021 Conditional Approval KEVIN SARGSYAN
HVAC-Rough 10/27/2021 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 10/27/2021 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 11/8/2021 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 11/8/2021 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 11/12/2021 Approved KEVIN SARGSYAN
PLUMBING-Rough 11/12/2021 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 11/17/2021 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 11/17/2021 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 11/17/2021 Approved KEVIN SARGSYAN
HVAC-Rough 11/17/2021 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 11/29/2021 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 1/11/2022 No Access for Inspection KEVIN SARGSYAN
HVAC-Rough 1/13/2022 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 1/21/2022 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 1/28/2022 Not Ready for Inspection OGANES TARAKHCHYAN
Deputy Wood Construction 2/1/2022 Conditional Approval KEVIN SARGSYAN
Deputy Wood Construction 2/2/2022 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 2/3/2022 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 2/22/2022 Partial Approval OGANES TARAKHCHYAN
Insulation 2/25/2022 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 3/2/2022 Approved KEVIN SARGSYAN
Insulation 3/2/2022 Not Ready for Inspection KEVIN SARGSYAN
Insulation 3/4/2022 Approved KEVIN SARGSYAN
Drywall Nailing 3/16/2022 Approved KEVIN SARGSYAN
Shower Pan 3/16/2022 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 5/2/2022 Approved KEVIN SARGSYAN
ELECTRICAL-Final 2/21/2023 Corrections Issued CLAYTON GRAHAM
HVAC-Final 2/21/2023 Not Ready for Inspection CLAYTON GRAHAM
PLUMBING-Final 2/21/2023 Corrections Issued CLAYTON GRAHAM
ELECTRICAL-Final 2/28/2023 Corrections Issued MICHAEL PELHAM
Final 2/28/2023 Corrections Issued MICHAEL PELHAM
Gas Test 2/28/2023 Approved MICHAEL PELHAM
HVAC-Final 2/28/2023 Corrections Issued MICHAEL PELHAM
PLUMBING-Final 2/28/2023 Approved MICHAEL PELHAM
SGSOV-Seismic Gas S/O Valve 2/28/2023 SGSOV Not Ready MICHAEL PELHAM
Smoke Detectors 2/28/2023 Approved MICHAEL PELHAM
Final 3/2/2023 Not Ready for Inspection ASHLEY THOMPSON
SGSOV-Seismic Gas S/O Valve 3/2/2023 SGSOV Approved ASHLEY THOMPSON
ELECTRICAL-Final 3/16/2023 Corrections Issued STEPHANIE SWANSON
Final 3/16/2023 Corrections Issued STEPHANIE SWANSON
HVAC-Final 3/16/2023 Not Ready for Inspection STEPHANIE SWANSON
ELECTRICAL-Final 3/22/2023 Approved ASHLEY THOMPSON
HVAC-Final 3/22/2023 Not Ready for Inspection ASHLEY THOMPSON
PLUMBING-Final 3/22/2023 Approved ASHLEY THOMPSON
Final 3/23/2023 Not Ready for Inspection HERBERT GIRON
HVAC-Final 3/23/2023 Not Ready for Inspection HERBERT GIRON
Final 3/28/2023 Permit Finaled ASHLEY THOMPSON