2620 N BENEDICT CANYON DR 90210

Certificate Information: 2620 N BENEDICT CANYON DR 90210

Application / Permit
19016-30000-20144
Plan Check / Job No.
B19WL03724
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1ST FLOOR REMODEL: REMOVE STAIRS TO 2ND FLOOR, WIDEN 1 OF REMAINING STAIRS, REMOVE CABINETS IN KITCHED AND FAMILY ROOM, (N) WINDOW IN KITCHEN. 2ND FLOOR REMODEL: REMOVE 1 BATHROOM TO ENLARGE MASTER CLOSET, REMOVE 1 MASTER CLOSET TO ENLARGE MASTER BATHROOM, NEW MASTER CLOSET.
Permit Issued
Issued on 1/13/2020
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 10/19/2021

Permit Application Status History

Submitted 7/2/2019 APPLICANT
Assigned to Plan Check Engineer 7/11/2019 JAHANSHAH POURHASSAN
Corrections Issued 7/14/2019 JAHANSHAH POURHASSAN
Plan Check Approved 7/31/2019 ALFREDO JARA
Issued 1/13/2020 LADBS
Permit Finaled 10/19/2021 GERMAN RODRIGUEZ MENDOZA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 7/31/2019 ALFREDO JARA

Contact Information

Contractor Howley Lauren; Lic. No.: 1020130-B 4700 MASCOT STREET      LOS ANGELES, CA 90019
Engineer Garcia,, Lionel Jesus; Lic. No.: S4653 24702 NARBONNE AVE      LOMITA, CA 90717

Inspector Information

CARLOS MATAMOROS, (310) 914-3878 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 2/18/2020 Corrections Issued ANTHONY MCDOWALL
Footing/Foundation/Slab 2/18/2020 Not Ready for Inspection ANTHONY MCDOWALL
BUILDING-Rough-Frame 9/2/2020 Not Ready for Inspection ANTHONY MCDOWALL
ELECTRICAL-Rough 9/2/2020 Not Ready for Inspection ANTHONY MCDOWALL
Footing/Foundation/Slab 9/2/2020 Partial Approval ANTHONY MCDOWALL
Gas Test 9/2/2020 Not Ready for Inspection ANTHONY MCDOWALL
HVAC-Rough 9/2/2020 Not Ready for Inspection ANTHONY MCDOWALL
PLUMBING-Rough 9/2/2020 Partial Approval ANTHONY MCDOWALL
Wood Frame 9/2/2020 Not Ready for Inspection ANTHONY MCDOWALL
ELECTRICAL-Rough 9/3/2020 Approved ANTHONY MCDOWALL
HVAC-Rough 9/3/2020 Corrections Issued ANTHONY MCDOWALL
Footing/Foundation/Slab 9/11/2020 Approved ANTHONY MCDOWALL
HVAC-Rough 9/11/2020 Approved ANTHONY MCDOWALL
PLUMBING-Rough 9/11/2020 Approved ANTHONY MCDOWALL
BUILDING-Rough-Frame 9/16/2020 Approved ANTHONY MCDOWALL
Shower Pan 9/16/2020 Approved ANTHONY MCDOWALL
Insulation 9/21/2020 Approved ANTHONY MCDOWALL
Interior/Exterior Lathing 9/21/2020 Approved ANTHONY MCDOWALL
Drywall Nailing 10/13/2020 Approved ANTHONY MCDOWALL
Final 9/22/2021 Corrections Issued CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 9/22/2021 SGSOV Approved CHRISTOPHER WILSON
Smoke Detectors 9/22/2021 Corrections Issued CHRISTOPHER WILSON
Final 10/19/2021 Permit Finaled GERMAN RODRIGUEZ MENDOZA
Smoke Detectors 10/19/2021 Approved GERMAN RODRIGUEZ MENDOZA