612 W BOCCACCIO AVE 90291

Certificate Information: 612 W BOCCACCIO AVE 90291

Application / Permit
19016-20000-34411
Plan Check / Job No.
B19VN18495
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL KITCHEN AND RECONFIGURE INTERIOR TO REDUCE 1 BEDROOM. ALL WORKS ARE PER DESIGN. SEE COMMENT
Permit Issued
Issued on 12/4/2019
Issuing Office
Valley
Current Status
CofO Issued on 9/7/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/25/2019 APPLICANT
Assigned to Plan Check Engineer 10/29/2019 ALDOUS CHIC
Corrections Issued 10/30/2019 ALDOUS CHIC
Building Plans Picked Up 10/30/2019 APPLICANT
Applicant returned to address corrections 11/1/2019 ALDOUS CHIC
Applicant returned to address corrections 11/21/2019 ALDOUS CHIC
Plan Check Approved 11/22/2019 ALDOUS CHIC
Issued 12/4/2019 LADBS
CofO in Progress 8/6/2021 PIERRE VEGA
Permit Finaled 9/7/2021 RONALD MYRICK
CofO Issued 9/7/2021 RONALD MYRICK
Permit Finaled 9/7/2021 RONALD MYRICK

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/1/2019 ADRIAN CASTRO
Miscellaneous Cleared 11/1/2019 DAISY BENICIA
Roof/Waste drainage to street Cleared 11/1/2019 ADRIAN CASTRO
Miscellaneous Cleared 11/18/2019 IRA BROWN
Specific Plan Cleared 11/18/2019 IRA BROWN
ZI Cleared 11/18/2019 IRA BROWN

Contact Information

Contractor Dhe Best Construction Inc; Lic. No.: 1051288-B 5900 CANOGA AVE SUITE 308      WOODLAND HILLS, CA 91367
Engineer Durand,, Paul Henri; Lic. No.: S4222 611 N G ST      OXNARD, CA 93030

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 12/10/2019 Partial Inspection DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 12/13/2019 Partial Approval DAVID HEINE
Footing/Foundation/Slab 12/13/2019 Approved DAVID HEINE
Deputy Wood Construction 12/16/2019 No Access for Inspection CRAIG DAVIS
BUILDING-Rough-Frame 3/19/2020 Corrections Issued DAVID FEILER
ELECTRICAL-Rough 3/19/2020 Partial Inspection DAVID FEILER
HVAC-Rough 3/19/2020 Partial Inspection DAVID FEILER
PLUMBING-Rough 3/19/2020 Partial Inspection DAVID FEILER
ELECTRICAL-Rough 7/13/2020 Approved DAVID HEINE
PLUMBING-Rough 7/13/2020 Approved DAVID HEINE
Wood Frame 7/13/2020 Partial Approval DAVID HEINE
Interior/Exterior Lathing 7/24/2020 Partial Approval DAVID HEINE
Insulation 7/28/2020 Approved DAVID HEINE
Drywall Nailing 7/31/2020 Approved DAVID HEINE
Interior/Exterior Lathing 7/31/2020 Partial Approval DAVID HEINE
Pre-Inspection 2/9/2021 No Access for Inspection PIERRE VEGA
BUILDING-Rough-Frame 4/26/2021 Approved ENRIQUE MIRELES
ELECTRICAL-Final 4/26/2021 Approved ENRIQUE MIRELES
Final 4/26/2021 No Access for Inspection ENRIQUE MIRELES
HVAC-Final 4/26/2021 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 4/26/2021 SGSOV Approved ENRIQUE MIRELES
Smoke Detectors 4/26/2021 Approved ENRIQUE MIRELES
Gas Test 5/3/2021 Not Ready for Inspection ENRIQUE MIRELES
Service/Power Release 5/3/2021 Approved ENRIQUE MIRELES
Final 5/7/2021 Corrections Issued ENRIQUE MIRELES
Gas Test 5/7/2021 Approved ENRIQUE MIRELES
PLUMBING-Final 5/7/2021 Approved ENRIQUE MIRELES
Final 6/16/2021 Conditional Approval ENRIQUE MIRELES