8400 W EDWIN DR 90046

Certificate Information: 8400 W EDWIN DR 90046

Application / Permit
19016-20000-30565
Plan Check / Job No.
B19VN16371
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL KITCHEN, BATHROOMS, CREATE (N) BATHROOM WITHIN BUILDING, CHANGE OUT DOORS/WINDOWS (TEMPERED DUAL GLAZING, CERTIFIED BY NFRC) AND REMOVE ALL CEILING JOISTS FOR VAULTED CEILING THROUGHOUT. ALL WORKS ARE PER DESIGN
Permit Issued
Issued on 1/9/2020
Issuing Office
Valley
Current Status
Permit Finaled on 8/14/2020

Permit Application Status History

Submitted 9/25/2019 APPLICANT
Assigned to Plan Check Engineer 9/25/2019 ALDOUS CHIC
Corrections Issued 9/25/2019 ALDOUS CHIC
Plan Check Approved 10/7/2019 ALDOUS CHIC
Issued 1/9/2020 LADBS
Permit Finaled 8/14/2020 RAUL BARAJAS

Permit Application Clearance Information

Specific Plan Cleared 9/30/2019 DOMINICK ORTIZ
ZI Cleared 9/30/2019 DOMINICK ORTIZ
Grading Pre-Inspection Cleared 10/7/2019 ALDOUS CHIC

Contact Information

Architect Woodcraft,, Astra E; Lic. No.: C32722 20812 VENTURA BLVD SUITE 205      WOODLAND HILLS, CA 91364
Contractor Owner-Builder       ,

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 1/27/2020 Approved RICHARD STEINBACH
Deputy Wood Construction 2/6/2020 Conditional Approval RICHARD STEINBACH
HVAC-Rough 2/25/2020 Not Ready for Inspection RICHARD STEINBACH
PLUMBING-Rough 2/25/2020 Corrections Issued RICHARD STEINBACH
PLUMBING-Rough 2/27/2020 Approved RICHARD STEINBACH
ELECTRICAL-Rough 3/24/2020 Approved RAUL BARAJAS
Gas Test 3/24/2020 Approved RAUL BARAJAS
HVAC-Rough 3/24/2020 Partial Approval RAUL BARAJAS
Wood Frame 3/24/2020 Conditional Approval RAUL BARAJAS
Insulation 4/20/2020 Approved RAUL BARAJAS
Shower Pan 4/20/2020 Approved RAUL BARAJAS
Wood Frame 4/20/2020 Conditional Approval RAUL BARAJAS
Drywall Nailing 4/24/2020 Approved RAUL BARAJAS
Interior/Exterior Lathing 4/24/2020 Approved RAUL BARAJAS
Drywall Nailing 4/27/2020 Approved RAUL BARAJAS
Interior/Exterior Lathing 4/27/2020 Approved RAUL BARAJAS
Gas Test 7/21/2020 Approved CHRISTOPHER DELLEFIELD
Final 8/12/2020 Not Ready for Inspection RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 8/12/2020 SGSOV Not Ready RAUL BARAJAS
Smoke Detectors 8/12/2020 No Access for Inspection RAUL BARAJAS
Final 8/14/2020 Permit Finaled RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 8/14/2020 SGSOV Approved RAUL BARAJAS
Smoke Detectors 8/14/2020 Approved RAUL BARAJAS