10433 W CROCKETT ST 91352

Certificate Information: 10433 W CROCKETT ST 91352

Application / Permit
19016-20000-25675
Plan Check / Job No.
B19VN13755
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) (26'-5" X 34') IRREGULAR SHAPED DETACHED GARAGE TO ACCESSORY DWELLING UNIT PER AB 494 AND SB 229. EXISTING CARPORT TO REMAIN. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 11/7/2019
Issuing Office
Valley
Current Status
CofO Issued on 5/26/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/16/2019 APPLICANT
Assigned to Plan Check Engineer 8/19/2019 RAPHAEL ROSAS
Corrections Issued 8/19/2019 RAPHAEL ROSAS
Building Plans Picked Up 8/27/2019 APPLICANT
Plan Check Approved 10/31/2019 RAPHAEL ROSAS
Issued 11/7/2019 LADBS
CofO in Progress 5/16/2020 PIERRE VEGA
CofO Issued 5/26/2020 MICHAEL SMITH
Permit Finaled 5/26/2020 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 9/3/2019 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 9/3/2019 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 9/3/2019 GABRIEL ROBLES
Sewer availability Cleared 9/3/2019 GABRIEL ROBLES
Construction near power lines Cleared 10/27/2019 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Basso,, Alexandre; Lic. No.: C77670 7231 SUMMITROSE ST      TUJUNGA, CA 91042

Inspector Information

MATTHEW NELSON, (818) 374-1168 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/24/2020 No Access for Inspection BEAU COLLINS
Footing/Foundation/Slab 1/31/2020 Approved BEAU COLLINS
Floor/Roof Diaphrgm/Shear Wall 2/10/2020 Partial Approval BEAU COLLINS
PLUMBING-Rough 2/10/2020 Partial Approval BEAU COLLINS
ELECTRICAL-Rough 2/13/2020 Partial Inspection PIERRE VEGA
Gas Test 2/13/2020 Approved PIERRE VEGA
Insulation 2/13/2020 Partial Inspection PIERRE VEGA
Underground Mechanical 2/13/2020 Approved PIERRE VEGA
BUILDING-Rough-Frame 2/20/2020 Conditional Approval BEAU COLLINS
ELECTRICAL-Rough 2/20/2020 Approved BEAU COLLINS
Green Building Rough 2/20/2020 Approved BEAU COLLINS
HVAC-Rough 2/20/2020 Partial Approval BEAU COLLINS
MERV13>=Rough 2/20/2020 Approved BEAU COLLINS
PLUMBING-Rough 2/20/2020 Approved BEAU COLLINS
Insulation 2/25/2020 Approved BEAU COLLINS
Drywall Nailing 2/28/2020 Approved BEAU COLLINS
BUILDING-Rough-Frame 3/17/2020 Approved BEAU COLLINS
Final 3/17/2020 Conditional Approval BEAU COLLINS
Green Building Final 3/17/2020 Approved BEAU COLLINS
MERV13>=Final 3/17/2020 Approved BEAU COLLINS
SGSOV-Seismic Gas S/O Valve 3/17/2020 SGSOV Approved BEAU COLLINS
Smoke Detectors 3/17/2020 Approved BEAU COLLINS