3623 W SHANNON ROAD 90027
Certificate Information: 3623 W SHANNON ROAD 90027
- Application / Permit
- 19016-10000-40483
- Plan Check / Job No.
- B19LA26768
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- INTERIOR REMODEL OF (E) SINGLE FAMILY DWELLING. ADDING SHEAR WALLS, REMOVAL OF (E) LOAD BEARING AND NON LOAD BEARING WALLS AND NEW AND ALTERED FOUNDATION ELEMENTS PER STRUCTURAL ENGINEER DETAILS. AND RENOVATION OF (E) KITCHEN.
- Permit Issued
- Issued on 3/16/2020
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 9/24/2020
Permit Application Status History
| Submitted | 12/19/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 12/27/2019 | SINA KHOSRAVI |
| Corrections Issued | 1/1/2020 | SINA KHOSRAVI |
| Applicant returned to address corrections | 1/14/2020 | RACHEL BEYENE |
| Plan Check Approved | 1/17/2020 | GEORGE ALVAREZ |
| Issued | 3/16/2020 | LADBS |
| Permit Finaled | 9/24/2020 | JOSEPH MCGARRY |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 1/7/2020 | KIRK LINKLATER |
Contact Information
| Architect | Zapata,, Jabdiel J; Lic. No.: C34980 | 445 S. SAN GRABRIEL BLVD. SAN GABRIEL, CA 91776 |
| Contractor | Mcgilvray Construction & Development Inc; Lic. No.: 1063938-B | 451 GERONA AVE SAN GABRIEL, CA 91775 |
| Engineer | Zhuang,, Wenbin; Lic. No.: S5236 | 184 S ALTADENA DRIVE PASADENA, CA 91107 |
Inspector Information
| ENRIQUE MIRELES, (213) 202-3438 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 3/24/2020 | Approved | JOSEPH MCGARRY |
| Excavation/Setback/Form/Re-Bar | 4/2/2020 | Approved | JOSEPH MCGARRY |
| BUILDING-Rough-Frame | 4/14/2020 | Partial Approval | JOSEPH MCGARRY |
| ELECTRICAL-Rough | 4/14/2020 | Partial Approval | JOSEPH MCGARRY |
| Floor/Roof Diaphrgm/Shear Wall | 4/15/2020 | Partial Approval | CHRIS CHRISTENSEN |
| BUILDING-Rough-Frame | 4/16/2020 | Partial Approval | JOSEPH MCGARRY |
| ELECTRICAL-Rough | 4/16/2020 | Partial Approval | JOSEPH MCGARRY |
| Drywall Nailing | 4/17/2020 | Approved | JOSEPH MCGARRY |
| BUILDING-Rough-Frame | 5/19/2020 | Approved | JOSEPH MCGARRY |
| ELECTRICAL-Rough | 5/19/2020 | Approved | JOSEPH MCGARRY |
| Interior/Exterior Lathing | 5/19/2020 | Approved | JOSEPH MCGARRY |
| Final | 9/24/2020 | Permit Finaled | JOSEPH MCGARRY |
| SGSOV-Seismic Gas S/O Valve | 9/24/2020 | SGSOV Approved | JOSEPH MCGARRY |
| Smoke Detectors | 9/24/2020 | Approved | JOSEPH MCGARRY |