14130 W RIVERSIDE DR 91423
Certificate Information: 14130 W RIVERSIDE DR 91423
- Application / Permit
- 19016-10000-39265
- Plan Check / Job No.
- B19LA25920
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (13) Office
- Work Description
- MAJOR REMODEL OF 3-STORY OFFICE/RESTAURANT/PARKING BLDG. INTO OFFICE AND PARKING ONLY BLDG. PER VTT 72802 AND CPC 2014-136-ZC-MCUP-SPR. CORE AND SHELL ONLY. INCLUDES NEW ATTACHED CANOPIES AND ROOF COVERING OVER (E) COURTYARD. (2017 LABC)
- Permit Issued
- Issued on 7/18/2022
- Issuing Office
- Metro
- Current Status
- Issued on 7/18/2022
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 12/9/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 1/9/2020 | LAWRENCE QUIRANTE |
| Corrections Issued | 1/29/2020 | LAWRENCE QUIRANTE |
| Quality Review Completed | 2/3/2020 | ALLEN MANALANSAN |
| Building Plans Picked Up | 2/3/2020 | APPLICANT |
| Disabled Access Plans Picked Up | 2/6/2020 | APPLICANT |
| Green Plans Picked Up | 6/25/2020 | APPLICANT |
| Applicant returned to address corrections | 7/7/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 7/9/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 7/15/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 7/17/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 7/21/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 7/24/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 7/27/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 7/29/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 8/7/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 8/10/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 10/5/2020 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 2/25/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 3/1/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 3/3/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 4/28/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 5/4/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 5/21/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 6/8/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 8/26/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 9/8/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 9/9/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 9/10/2021 | LAWRENCE QUIRANTE |
| Applicant returned to address corrections | 10/14/2021 | LAWRENCE QUIRANTE |
| Plan Check Approved | 7/14/2022 | LAWRENCE QUIRANTE |
| Issued | 7/18/2022 | APPLICANT |
Permit Application Clearance Information
| Green Code | Cleared | 6/25/2020 | LAWRENCE QUIRANTE |
| Low Impact Development | Cleared | 1/26/2021 | AMMAR ELTAWIL |
| DAS Clearance | Cleared | 6/15/2021 | ELIZABETH TOMS |
| Internal circulation | Cleared | 6/21/2021 | SHEILA AHORAIAN |
| Disturb/Remove Protected Trees | Cleared | 6/24/2021 | ADRIAN SANCHEZ |
| Supp. Use District POD/CDO/TDO | Cleared | 8/12/2021 | RUBEN VASQUEZ |
| Hydrant and Access approval | Cleared | 3/31/2022 | KURT CORRAL |
| Fire Marshall Fire Life Safety | Cleared | 4/20/2022 | WILLIAM JOHNS |
| Eng Process Fee Ord 176,300 | Cleared | 4/22/2022 | LEE GUILBEAUX |
| Permit | Cleared | 4/22/2022 | LEE GUILBEAUX |
| Roof/Waste drainage to street | Cleared | 4/22/2022 | LEE GUILBEAUX |
| Sewer availability | Cleared | 4/22/2022 | LEE GUILBEAUX |
| CPC | Cleared | 5/20/2022 | WILLIAM LAMBORN |
| Tract Map conditions | Cleared | 5/20/2022 | WILLIAM LAMBORN |
Contact Information
| Architect | Ball,, Larry Roy; Lic. No.: C12056 | 5112 TEESDALE AVE VALLEY VILLAGE, CA 91607 |
| Contractor | Imt Residential; Lic. No.: 766199-B | 15303 VENTURA BLVD STE. 200 SHERMAN OAKS, CA 91403 |
| Engineer | Knur,, Reinard Thomas; Lic. No.: GE2755 | 1435 MONCADO DR GLENDALE, CA 91207 |
| Engineer | Powers,, Brian Frederick; Lic. No.: C75902 | 2090 WEST 31ST STREET LOS ANGELES, CA 90018 |
| Engineer | Zangoli,, Fabio; Lic. No.: S6191 | 13245 FIJI WY UNIT J MARINA DEL REY, CA 90292 |
Inspector Information
| ROBERT DAVIS, (818) 374-1125 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Steel/Welding | 9/15/2022 | Conditional Approval | CAMERON CHABAN |
| Deputy Steel/Welding | 9/16/2022 | Conditional Approval | CAMERON CHABAN |
| Deputy Steel/Welding | 9/20/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Steel/Welding | 9/21/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Steel/Welding | 9/22/2022 | Conditional Approval | CAMERON CHABAN |
| Deputy Steel/Welding | 9/23/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Drilled-In Anchors | 10/12/2022 | Conditional Approval | CAMERON CHABAN |
| Deputy Drilled-In Anchors | 10/27/2022 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 11/3/2022 | Partial Approval | CAMERON CHABAN |
| Deputy Drilled-In Anchors | 12/5/2022 | Conditional Approval | CAMERON CHABAN |
| Deputy Other (see comments) | 12/5/2022 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 1/20/2023 | Conditional Approval | BRUCE CAMPBELL |
| Deputy Shotcrete | 1/23/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 1/24/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 1/25/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 1/26/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 1/27/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 1/30/2023 | Conditional Approval | ANDREW DORSO |
| Deputy Shotcrete | 1/31/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 2/1/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 2/2/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 2/3/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 2/3/2023 | Conditional Approval | STEVEN LEVITT |
| Footing/Foundation/Slab | 2/9/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 2/10/2023 | Conditional Approval | CAMERON CHABAN |
| Special/Order Compliance | 2/10/2023 | Conditional Approval | STEVEN LEVITT |
| Green Building Rough | 2/23/2023 | Partial Inspection | CAMERON CHABAN |
| Reinforced Concrete Frame | 2/23/2023 | Partial Approval | CAMERON CHABAN |
| Excavation/Setback/Form/Re-Bar | 3/9/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 3/14/2023 | Conditional Approval | STEVEN LEVITT |
| Deputy Shotcrete | 3/22/2023 | Conditional Approval | STEVEN LEVITT |
| Deputy Shotcrete | 3/23/2023 | Conditional Approval | STEVEN LEVITT |
| Deputy Shotcrete | 3/24/2023 | Conditional Approval | STEVEN LEVITT |
| Deputy Shotcrete | 3/28/2023 | Conditional Approval | JEFFREY DURAN |
| Deputy Shotcrete | 3/29/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 3/30/2023 | Conditional Approval | DEANDRE HOFFMAN |
| Deputy Shotcrete | 3/31/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 4/3/2023 | Conditional Approval | CAMERON CHABAN |
| Green Building Rough | 4/3/2023 | Partial Inspection | CAMERON CHABAN |
| Reinforced Concrete Frame | 4/3/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Shotcrete | 4/4/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 4/5/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 4/5/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 4/6/2023 | Conditional Approval | STEVEN LEVITT |
| Deputy Shotcrete | 4/6/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Drilled-In Anchors | 4/26/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 5/3/2023 | Conditional Approval | CAMERON CHABAN |
| Excavation/Setback/Form/Re-Bar | 5/3/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 5/11/2023 | Conditional Approval | CAMERON CHABAN |
| Footing/Foundation/Slab | 5/11/2023 | Partial Approval | CAMERON CHABAN |
| Special/Order Compliance | 5/11/2023 | Partial Approval | STEVEN LEVITT |
| Footing/Foundation/Slab | 5/16/2023 | Partial Approval | CAMERON CHABAN |
| Special/Order Compliance | 5/16/2023 | Partial Approval | STEVEN LEVITT |
| Deputy Reinf. Concrete | 5/19/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 6/7/2023 | Conditional Approval | STEVEN LEVITT |
| Excavation/Setback/Form/Re-Bar | 6/7/2023 | Partial Approval | JOHN KITCKO |
| Deputy Shotcrete | 6/8/2023 | Conditional Approval | STEVEN LEVITT |
| Green Building Rough | 6/14/2023 | Not Ready for Inspection | CAMERON CHABAN |
| Reinforced Concrete Frame | 6/14/2023 | Partial Inspection | CAMERON CHABAN |
| Deputy Shotcrete | 6/16/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 6/21/2023 | Conditional Approval | CAMERON CHABAN |
| Green Building Rough | 6/21/2023 | Partial Inspection | CAMERON CHABAN |
| Reinforced Concrete Frame | 6/21/2023 | Partial Inspection | CAMERON CHABAN |
| Deputy Shotcrete | 6/22/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 6/23/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 6/26/2023 | Conditional Approval | STEVEN LEVITT |
| Deputy Shotcrete | 7/7/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 7/13/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 7/13/2023 | Conditional Approval | CAMERON CHABAN |
| Footing/Foundation/Slab | 7/13/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Steel/Welding | 7/18/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Steel/Welding | 7/19/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 7/20/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Steel/Welding | 7/20/2023 | Conditional Approval | CAMERON CHABAN |
| Footing/Foundation/Slab | 7/20/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 7/21/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Steel/Welding | 7/21/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Fireproofing | 7/26/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Fireproofing | 7/28/2023 | Conditional Approval | JEFFREY DURAN |
| Light Gage Steel Frame | 7/28/2023 | Partial Approval | STEVEN LEVITT |
| Deputy Shotcrete | 8/1/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 8/2/2023 | Conditional Approval | CAMERON CHABAN |
| Excavation/Setback/Form/Re-Bar | 8/2/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 8/3/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Shotcrete | 8/3/2023 | Conditional Approval | CAMERON CHABAN |
| Footing/Foundation/Slab | 8/4/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 8/8/2023 | Conditional Approval | CAMERON CHABAN |
| Green Building Rough | 8/25/2023 | Partial Inspection | CAMERON CHABAN |
| Reinforced Concrete Frame | 8/25/2023 | Partial Approval | CAMERON CHABAN |
| Drywall Nailing | 9/8/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 9/15/2023 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 9/20/2023 | Conditional Approval | CAMERON CHABAN |
| Footing/Foundation/Slab | 9/20/2023 | Not Ready for Inspection | CAMERON CHABAN |
| Deputy Reinf. Concrete | 9/21/2023 | Conditional Approval | STEVEN LEVITT |
| Footing/Foundation/Slab | 9/27/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 9/29/2023 | Conditional Approval | CAMERON CHABAN |
| Footing/Foundation/Slab | 10/4/2023 | Partial Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 10/5/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 10/17/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 10/18/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 10/18/2023 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 10/19/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Fireproofing | 11/2/2023 | Conditional Approval | CAMERON CHABAN |
| Light Gage Steel Frame | 11/3/2023 | Partial Inspection | CAMERON CHABAN |
| Deputy Drilled-In Anchors | 11/16/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 11/20/2023 | Approved | JEFFREY DURAN |
| Green Building Rough | 11/20/2023 | Not Ready for Inspection | JEFFREY DURAN |
| Reinforced Concrete Frame | 11/20/2023 | Partial Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 11/21/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Drilled-In Anchors | 12/6/2023 | Conditional Approval | CAMERON CHABAN |
| Deputy Fireproofing | 12/11/2023 | Conditional Approval | JOHN KITCKO |
| Deputy Reinf. Masonry | 2/1/2024 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Masonry | 2/2/2024 | Conditional Approval | JEFFREY FULTON |
| Deputy Reinf. Masonry | 2/5/2024 | Conditional Approval | JEFFREY FULTON |
| Deputy Reinf. Masonry | 2/6/2024 | Conditional Approval | JOHN KITCKO |
| Deputy Reinf. Masonry | 2/7/2024 | Conditional Approval | STEVEN LEVITT |
| Deputy Reinf. Masonry | 2/8/2024 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Masonry | 2/9/2024 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Masonry | 2/15/2024 | Conditional Approval | KENNETH ROBERTS |
| Deputy Reinf. Masonry | 2/16/2024 | Conditional Approval | KENNETH ROBERTS |
| Deputy Drilled-In Anchors | 3/29/2024 | Conditional Approval | ROBERT DAVIS |
| Excavation/Setback/Form/Re-Bar | 4/22/2024 | Partial Approval | JOHN KITCKO |
| Deputy Reinf. Concrete | 4/30/2024 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 5/1/2024 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 5/6/2024 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 5/7/2024 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 8/29/2024 | Conditional Approval | GREGORY POMISH |
| Footing/Foundation/Slab | 8/29/2024 | Partial Approval | GREGORY POMISH |
| Drywall Nailing | 2/5/2025 | Partial Approval | ROBERT DAVIS |
| Interior/Exterior Lathing | 2/20/2025 | Partial Approval | JOHN KITCKO |
| Drywall Nailing | 8/15/2025 | Partial Inspection | ROBERT DAVIS |