11666 W MAGNOLIA BLVD 91601

Certificate Information: 11666 W MAGNOLIA BLVD 91601

Application / Permit
19016-10000-35865
Plan Check / Job No.
B19LA23693
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH 93. INSTALLL (N) SCCS AND PLYWOOD SHEAR WALL
Permit Issued
Issued on 2/19/2020
Issuing Office
Metro
Current Status
Issued on 2/19/2020

Permit Application Status History

Submitted 11/6/2019 APPLICANT
Assigned to Plan Check Engineer 12/4/2019 THOMAS SHERMAN
Corrections Issued 12/11/2019 THOMAS SHERMAN
Quality Review Completed 12/16/2019 HANS SANTIAGO
Building Plans Picked Up 12/19/2019 APPLICANT
Applicant returned to address corrections 1/2/2020 THOMAS SHERMAN
Plan Check Approved 1/16/2020 THOMAS SHERMAN
Issued 2/19/2020 LADBS

Permit Application Clearance Information

Specific Plan Cleared 1/7/2020 JASON CHAN
Housing rent stabilization Cleared 2/19/2020 CHARLES GARCIA

Contact Information

Contractor Alpha Structural Inc; Lic. No.: 663409-B 8334 FOOTHILL BLVD      SUNLAND, CA 91040
Engineer Axsom,, Erich Jason; Lic. No.: S4435 92 CORPORATE PARK C125      IRVINE, CA 92606

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/23/2020 Conditional Approval FRED WOHLFARTH
Deputy Reinf. Concrete 3/23/2020 Conditional Approval FRED WOHLFARTH
Excavation/Setback/Form/Re-Bar 3/25/2020 Approved DAVID BURKHEAD
Pre-Inspection 3/25/2020 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 3/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 3/31/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/1/2020 Approved DAVID BURKHEAD
Wall Anchors 4/1/2020 Approved DAVID BURKHEAD
Interior/Exterior Lathing 4/7/2020 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 4/14/2020 Approved DANIEL VARNUM
Final 5/5/2020 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 5/5/2020 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 5/5/2020 Not Ready for Inspection JOE VELASQUEZ
Final 6/8/2020 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 6/8/2020 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 6/8/2020 Not Ready for Inspection JOE VELASQUEZ
Final 5/6/2021 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 5/6/2021 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 5/6/2021 Not Ready for Inspection JOE VELASQUEZ