4313 N TUJUNGA AVE 91604
Certificate Information: 4313 N TUJUNGA AVE 91604
- Application / Permit
- 19016-10000-33096
- Plan Check / Job No.
- B19LA21923
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (35) Condo-Multi Family
- Work Description
- SOFT STORY RETROFIT AS PER LABC CH. 93. INSTALL (2) SCCS.
- Permit Issued
- Issued on 1/17/2020
- Issuing Office
- Metro
- Current Status
- CofC Issued on 6/11/2020
Permit Application Status History
| Submitted | 10/16/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 11/14/2019 | DANIEL SANJUAN |
| Corrections Issued | 11/20/2019 | DANIEL SANJUAN |
| Quality Review Completed | 11/21/2019 | HANS SANTIAGO |
| Building Plans Picked Up | 12/2/2019 | APPLICANT |
| Plan Check Approved | 12/18/2019 | DANIEL SANJUAN |
| Issued | 1/17/2020 | LADBS |
| OK for CofC | 6/11/2020 | VAHE KELEDJIAN |
| CofC Issued | 6/11/2020 | DAVID TSAU |
Permit Application Clearance Information
| Construction near power lines | Cleared | 12/18/2019 | WALTER RAMIREZ |
| Housing rent stabilization | Cleared | 1/14/2020 | PHILLIP MUNGUIA |
Contact Information
| Contractor | Core General Contractors; Lic. No.: 1038618-B | 9800D TOPANGA CANYON BLVD SUITE 324 CHATSWORTH, CA 91311 |
| Engineer | Deihimi,, Amir Hossein; Lic. No.: C78194 | 23172 PLAZA POINTE DR STE 145 LAGUNA HILLS, CA 92653 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 2/19/2020 | Not Ready for Inspection | FRED WOHLFARTH |
| Pre-Inspection | 2/19/2020 | Corrections Issued | FRED WOHLFARTH |
| Deputy Drilled-In Anchors | 2/20/2020 | Conditional Approval | FRED WOHLFARTH |
| Deputy Steel/Welding | 3/2/2020 | Corrections Issued | FRED WOHLFARTH |
| Excavation/Setback/Form/Re-Bar | 3/4/2020 | Corrections Issued | FRED WOHLFARTH |
| Footing/Foundation/Slab | 3/4/2020 | Not Ready for Inspection | FRED WOHLFARTH |
| Structural Steel Frame | 3/4/2020 | Not Ready for Inspection | FRED WOHLFARTH |
| Wood Frame | 3/4/2020 | Not Ready for Inspection | FRED WOHLFARTH |
| Deputy Steel/Welding | 3/12/2020 | Conditional Approval | FRED WOHLFARTH |
| Deputy Steel/Welding | 3/16/2020 | Conditional Approval | FRED WOHLFARTH |
| Deputy Steel/Welding | 3/17/2020 | Corrections Issued | FRED WOHLFARTH |
| Floor/Roof Diaphrgm/Shear Wall | 4/3/2020 | Partial Approval | DANIEL VARNUM |
| Footing/Foundation/Slab | 4/3/2020 | Approved | DANIEL VARNUM |
| Structural Steel Frame | 4/3/2020 | Approved | DANIEL VARNUM |
| Interior/Exterior Lathing | 4/17/2020 | Approved | JOE VELASQUEZ |
| Final | 4/27/2020 | Not Ready for Inspection | JOE VELASQUEZ |
| SGSOV-Seismic Gas S/O Valve | 4/27/2020 | SGSOV Not Ready | JOE VELASQUEZ |
| Smoke Detectors | 4/27/2020 | Not Ready for Inspection | JOE VELASQUEZ |
| Final | 6/11/2020 | OK for CofC | VAHE KELEDJIAN |
| SGSOV-Seismic Gas S/O Valve | 6/11/2020 | SGSOV Approved | VAHE KELEDJIAN |
| Smoke Detectors | 6/11/2020 | Approved | VAHE KELEDJIAN |