2110 1/2 S OVERLAND AVE 90025

Certificate Information: 2110 1/2 S OVERLAND AVE 90025

Application / Permit
19016-10000-32140
Plan Check / Job No.
B19LA21327
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT 2ND FLOOR RECREATION ROOM ABOVE GARAGE INTO ACCESSORY DWELLING UNIT PER AB 494 AND SB 229.
Permit Issued
Issued on 11/15/2019
Issuing Office
Metro
Current Status
CofO Issued on 7/13/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/8/2019 APPLICANT
Assigned to Plan Check Engineer 10/8/2019 KEVIN MORALES
Corrections Issued 10/8/2019 KEVIN MORALES
Plan Check Approved 11/15/2019 ADAM HEGAZI
Issued 11/15/2019 LADBS
CofO in Progress 6/12/2020 GERMAN RODRIGUEZ MENDOZA
Permit Finaled 7/13/2020 VINCENT COTTON
CofO Issued 7/13/2020 VINCENT COTTON
Permit Finaled 7/13/2020 VINCENT COTTON

Permit Application Clearance Information

Address approval Cleared 10/8/2019 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 10/8/2019 ERIK BEASLEY
Sewer availability Cleared 10/8/2019 ERIK BEASLEY
ZA Case Cleared 10/8/2019 ANNA VIDAL
Construction near power lines Cleared 11/14/2019 WALTER RAMIREZ

Contact Information

Contractor Owner-Builder       ,
Engineer Rhee,, Kyle; Lic. No.: C78215 2753 WAVERLY DR 403      LOS ANGELES, CA 90039

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/21/2019 Partial Inspection GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 2/27/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 2/27/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
HVAC-Final 3/20/2020 Approved GERMAN RODRIGUEZ MENDOZA
Insulation 3/20/2020 Approved GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 3/20/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Drywall Nailing 3/31/2020 Approved GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 3/31/2020 Approved GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 5/20/2020 Approved KEVIN SARGSYAN
Final 5/20/2020 Not Ready for Inspection KEVIN SARGSYAN
METHANE-Final 5/20/2020 Approved KEVIN SARGSYAN
METHANE-Rough 5/20/2020 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/20/2020 SGSOV Not Ready KEVIN SARGSYAN
Smoke Detectors 5/20/2020 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 6/10/2020 Approved GERMAN RODRIGUEZ MENDOZA
Final 6/10/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
PLUMBING-Final 6/10/2020 Approved GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 6/10/2020 SGSOV Approved GERMAN RODRIGUEZ MENDOZA
Service/Power Release 6/10/2020 Approved GERMAN RODRIGUEZ MENDOZA
Smoke Detectors 6/10/2020 Approved GERMAN RODRIGUEZ MENDOZA