1629 S VETERAN AVE 90024

Certificate Information: 1629 S VETERAN AVE 90024

Application / Permit
19016-10000-30105
Plan Check / Job No.
B19LA20027
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LABC CH93: INSTALLING (3) STEEL SPECIAL MOMENT FRAMES
Permit Issued
Issued on 4/21/2020
Issuing Office
Metro
Current Status
CofC Issued on 8/23/2021

Permit Application Status History

Submitted 9/20/2019 APPLICANT
Assigned to Plan Check Engineer 10/16/2019 THOMAS SHERMAN
Corrections Issued 10/21/2019 THOMAS SHERMAN
Quality Review Completed 10/22/2019 HANS SANTIAGO
Building Plans Picked Up 11/14/2019 APPLICANT
Applicant returned to address corrections 1/22/2020 THOMAS SHERMAN
Plan Check Approved 1/24/2020 THOMAS SHERMAN
Issued 4/21/2020 LADBS
OK for CofC 8/19/2021 GRANT WOODS
CofC Issued 8/23/2021 TED RIES

Permit Application Clearance Information

Housing rent stabilization Cleared 1/22/2020 CHARLES GARCIA
Specific Plan Cleared 1/22/2020 KIT AWAKUNI

Contact Information

Architect , ; Lic. No.: C36247 3725 MOTOR AVE   4    LOS ANGELES, CA 90034
Contractor M A S Construction Group Inc; Lic. No.: 1014814-B 1543 7TH STREET SUITE 100      SANTA MONICA, CA 90401
Engineer Galbreath,, Sean Martin; Lic. No.: S5653 1386 EAST WALNUT STREET SUITE 202      PASADENA, CA 91106

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/31/2020 Conditional Approval GRANT WOODS
Pre-Inspection 9/1/2020 Partial Inspection PAUL DAVIDSON
Deputy Drilled-In Anchors 9/15/2020 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 9/18/2020 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 9/22/2020 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 4/7/2021 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 4/7/2021 Partial Inspection PAUL DAVIDSON
Footing/Foundation/Slab 4/7/2021 Partial Inspection PAUL DAVIDSON
Structural Steel Frame 4/7/2021 Partial Inspection PAUL DAVIDSON
Deputy Reinf. Concrete 4/9/2021 Conditional Approval GRANT WOODS
Interior/Exterior Lathing 7/6/2021 Approved PAUL DAVIDSON
Wood Frame 8/3/2021 Partial Inspection GRANT WOODS
Final 8/19/2021 OK for CofC GRANT WOODS
METHANE-Final 8/19/2021 Approved GRANT WOODS
SGSOV-Seismic Gas S/O Valve 8/19/2021 SGSOV Approved GRANT WOODS
Smoke Detectors 8/19/2021 Approved GRANT WOODS