5255 N HARMONY AVE 91601

Certificate Information: 5255 N HARMONY AVE 91601

Application / Permit
19016-10000-29608
Plan Check / Job No.
B19LA19718
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT-STORY SEISMIC RETROFIT PER LAMC DIVISION 93. INSTALLATION OF 2 SPECIAL CANTILEVERED COLUMN SYSTEM (SCCS) WITH CONCRETE GRADE BEAM. WORKS AT TUCK-UNDER PARKING AREAS, NOT ON TENANTS' UNITS.
Permit Issued
Issued on 10/21/2020
Issuing Office
Current Status
CofC Issued on 4/14/2021

Permit Application Status History

Submitted 9/17/2019 APPLICANT
Assigned to Plan Check Engineer 10/30/2019 ERWIN PASCUA
Corrections Issued 11/5/2019 ERWIN PASCUA
Quality Review Completed 11/6/2019 SAI KHUM
Building Plans Picked Up 11/15/2019 APPLICANT
Applicant returned to address corrections 12/9/2019 ERWIN PASCUA
Plan Check Approved 12/12/2019 ERWIN PASCUA
Issued 10/21/2020 APPLICANT
OK for CofC 4/6/2021 KENNETH ROBERTS
CofC Issued 4/14/2021 KENNETH ROBERTS

Permit Application Clearance Information

Project located in CRA area Cleared 12/9/2019 GISELLE CORELLA
ZI Cleared 12/9/2019 GISELLE CORELLA
Housing rent stabilization Cleared 10/16/2020 PHILLIP MUNGUIA

Contact Information

Contractor Repipe 1 Restoration Inc; Lic. No.: 1003868-B 19326 VENTURA BLVD STE 200      TARZANA, CA 91356
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/19/2020 Not Ready for Inspection JOE VELASQUEZ
Deputy Steel/Welding 12/3/2020 No Access for Inspection JOE VELASQUEZ
Footing/Foundation/Slab 12/4/2020 Approved JOE VELASQUEZ
Structural Steel Frame 12/10/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 12/10/2020 Not Ready for Inspection JOE VELASQUEZ
Insulation 12/14/2020 Not Ready for Inspection JOE VELASQUEZ
Insulation 12/17/2020 Approved JOE VELASQUEZ
Interior/Exterior Lathing 12/21/2020 Approved DANIEL VARNUM
Final 2/19/2021 Partial Approval HAMID PISHEHVAR
METHANE-Final 2/19/2021 Not Required HAMID PISHEHVAR
SGSOV-Seismic Gas S/O Valve 2/19/2021 SGSOV Approved HAMID PISHEHVAR
Smoke Detectors 2/19/2021 Approved HAMID PISHEHVAR
Final 3/9/2021 Not Ready for Inspection JOE VELASQUEZ
METHANE-Final 3/9/2021 Not Ready for Inspection JOE VELASQUEZ
Final 4/6/2021 OK for CofC KENNETH ROBERTS
METHANE-Final 4/6/2021 Approved KENNETH ROBERTS