3604 S STEWART AVE 90066

Certificate Information: 3604 S STEWART AVE 90066

Application / Permit
19016-10000-29263
Plan Check / Job No.
B19LA19507
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE (E) PORCH AT THE SIDE ( 18'X 10'-7"). SINGLE FAMILY RESIDENCE ADDITION TO THE SIDE (32'-11" X 10'-7") AND FRONT (3'-11" X 17'-3"). REMODEL KITCHEN, BATHROOM AND NEW FIREPLACE.
Permit Issued
Issued on 1/17/2020
Issuing Office
West Los Angeles
Current Status
CofO Issued on 3/22/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/13/2019 APPLICANT
Assigned to Plan Check Engineer 9/13/2019 ADAM HEGAZI
Corrections Issued 9/13/2019 ADAM HEGAZI
Applicant returned to address corrections 12/2/2019 RAHEL BEYENE
Plan Check Approved 12/4/2019 FARSHAD ALIMOHAMADI
Plan Check Approved 12/4/2019 GEORGE ALVAREZ
Issued 1/17/2020 LADBS
CofO in Progress 3/21/2023 HERBERT GIRON
Permit Finaled 3/22/2023 DANIEL ORRANTE
Permit Finaled 3/22/2023 DANIEL ORRANTE
CofO Issued 3/22/2023 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/19/2019 CELINA MORENO
Roof/Waste drainage to street Cleared 9/19/2019 CELINA MORENO
Grading Pre-Inspection Cleared 10/29/2019 PATRICK MISCHLICH

Contact Information

Architect Noteware,, Brian Arthur; Lic. No.: C21514 845 20TH STREET, #106      SANTA MONICA, CA 90403
Contractor Owner-Builder       ,

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/5/2020 Conditional Approval EVAN COOPER
Footing/Foundation/Slab 2/12/2020 Partial Approval JOHNNY MIRANDA
Floor/Roof Diaphrgm/Shear Wall 2/24/2020 Not Ready for Inspection OGANES TARAKHCHYAN
PLUMBING-Rough 2/24/2020 Not Ready for Inspection OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 2/27/2020 Corrections Issued KENNETH NAGLE
Floor/Roof Diaphrgm/Shear Wall 3/2/2020 Partial Approval JOHNNY MIRANDA
BUILDING-Rough-Frame 4/28/2020 Partial Approval DAVID FEILER
ELECTRICAL-Rough 4/28/2020 Approved DAVID FEILER
Green Building Rough 4/28/2020 Not Ready for Inspection DAVID FEILER
HVAC-Rough 4/28/2020 Partial Approval DAVID FEILER
PLUMBING-Rough 4/28/2020 Partial Approval DAVID FEILER
Deputy Wood Construction 4/30/2020 Conditional Approval DAVID FEILER
BUILDING-Rough-Frame 5/6/2020 Approved DAVID FEILER
Green Building Rough 5/6/2020 Approved DAVID FEILER
Interior/Exterior Lathing 5/6/2020 Partial Approval DAVID FEILER
Rough-Elec/Plmb/HVAC 5/6/2020 Approved DAVID FEILER
Insulation 5/8/2020 Approved DAVID FEILER
Drywall Nailing 5/20/2020 Approved DAVID FEILER
Shower Pan 5/20/2020 Not Ready for Inspection DAVID FEILER
Shower Pan 5/22/2020 Approved DAVID FEILER
ELECTRICAL-Final 7/17/2020 Approved JOHNNY MIRANDA
Final 7/17/2020 Not Ready for Inspection JOHNNY MIRANDA
Footing/Foundation/Slab 7/17/2020 Approved JOHNNY MIRANDA
Green Building Final 7/17/2020 Corrections Issued JOHNNY MIRANDA
HVAC-Final 7/17/2020 Approved JOHNNY MIRANDA
PLUMBING-Final 7/17/2020 Corrections Issued JOHNNY MIRANDA
SGSOV-Seismic Gas S/O Valve 7/17/2020 SGSOV Not Ready JOHNNY MIRANDA
Smoke Detectors 7/17/2020 Corrections Issued JOHNNY MIRANDA
ELECTRICAL-Final 7/28/2020 Approved JOHNNY MIRANDA
Final 7/28/2020 Corrections Issued JOHNNY MIRANDA
Green Building Final 7/28/2020 Corrections Issued JOHNNY MIRANDA
HVAC-Final 7/28/2020 Approved JOHNNY MIRANDA
PLUMBING-Final 7/28/2020 Approved JOHNNY MIRANDA
SGSOV-Seismic Gas S/O Valve 7/28/2020 SGSOV Not Ready JOHNNY MIRANDA
Smoke Detectors 7/28/2020 Approved JOHNNY MIRANDA
Final 8/4/2020 Partial Approval JOHNNY MIRANDA
Green Building Final 8/4/2020 Approved JOHNNY MIRANDA
SGSOV-Seismic Gas S/O Valve 8/4/2020 SGSOV Approved JOHNNY MIRANDA
Final 3/20/2023 OK to Issue CofO HERBERT GIRON