3754 S VINTON AVE 90034
Certificate Information: 3754 S VINTON AVE 90034
- Application / Permit
- 19016-10000-28946
- Plan Check / Job No.
- B19LA19288
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- SOFT STORY RETROFIT PER LABC CH.93. INSTALL STEEL CANTILEVER COLUMNS
- Permit Issued
- Issued on 3/5/2020
- Issuing Office
- Metro
- Current Status
- CofC Issued on 10/2/2020
Permit Application Status History
| Submitted | 9/12/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 10/23/2019 | HANS SANTIAGO |
| Corrections Issued | 10/28/2019 | HANS SANTIAGO |
| Quality Review Completed | 10/30/2019 | SAI KHUM |
| Building Plans Picked Up | 11/6/2019 | APPLICANT |
| Plan Check Approved | 1/13/2020 | ANDREW SANTIAGO |
| Issued | 3/5/2020 | LADBS |
| OK for CofC | 9/25/2020 | TIMOTHY BUXTON |
| CofC Issued | 10/2/2020 | TED RIES |
Permit Application Clearance Information
| Housing rent stabilization | Cleared | 3/3/2020 | MICHAEL GREGERSON |
Contact Information
| Contractor | Lockwood Engineering; Lic. No.: 1016915-B | 9663 SANTA MONICA BLVD #745 BEVERLY HILLS, CA 90210 |
| Engineer | Shaolian,, Shahab Joseph; Lic. No.: C84155 | 5104 GARDEN GROVE TARZANA, CA 91356 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 8/14/2020 | Approved | GRANT WOODS |
| Deputy Drilled-In Anchors | 8/20/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 8/24/2020 | Conditional Approval | GRANT WOODS |
| Deputy Reinf. Concrete | 8/25/2020 | Conditional Approval | GRANT WOODS |
| Reinforced Concrete Frame | 8/25/2020 | Not Ready for Inspection | GRANT WOODS |
| Structural Steel Frame | 8/25/2020 | Not Ready for Inspection | GRANT WOODS |
| Wood Frame | 8/25/2020 | Not Ready for Inspection | GRANT WOODS |
| Deputy Wood Construction | 8/28/2020 | Conditional Approval | GRANT WOODS |
| Excavation/Setback/Form/Re-Bar | 9/1/2020 | Approved | GRANT WOODS |
| Structural Steel Frame | 9/1/2020 | Approved | GRANT WOODS |
| Wood Frame | 9/1/2020 | Approved | GRANT WOODS |
| Floor/Roof Diaphrgm/Shear Wall | 9/3/2020 | Conditional Approval | GRANT WOODS |
| Interior/Exterior Lathing | 9/8/2020 | Approved | GRANT WOODS |
| Final | 9/14/2020 | Partial Inspection | GRANT WOODS |
| METHANE-Final | 9/14/2020 | Approved | GRANT WOODS |
| SGSOV-Seismic Gas S/O Valve | 9/14/2020 | SGSOV Not Ready | GRANT WOODS |
| Smoke Detectors | 9/14/2020 | Not Ready for Inspection | GRANT WOODS |
| Final | 9/25/2020 | OK for CofC | TIMOTHY BUXTON |
| SGSOV-Seismic Gas S/O Valve | 9/25/2020 | SGSOV Approved | TIMOTHY BUXTON |
| Smoke Detectors | 9/25/2020 | Approved | TIMOTHY BUXTON |