10815 W CAMARILLO ST 91602

Certificate Information: 10815 W CAMARILLO ST 91602

Application / Permit
19016-10000-28924
Plan Check / Job No.
B19LA19271
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LABC CHAPTER 93. INSTALL STEEL CANTILEVER COLUMN.
Permit Issued
Issued on 4/22/2021
Issuing Office
Current Status
CofC Issued on 10/26/2021

Permit Application Status History

Submitted 9/16/2019 APPLICANT
Assigned to Plan Check Engineer 10/30/2019 MANUEL MONTUFAR
Corrections Issued 11/4/2019 MANUEL MONTUFAR
Quality Review Completed 11/5/2019 HANS SANTIAGO
Plan Check Approved 1/3/2020 MANUEL MONTUFAR
Issued 4/22/2021 APPLICANT
OK for CofC 10/21/2021 JEFFREY DURAN
CofC Issued 10/26/2021 JEFFREY DURAN

Permit Application Clearance Information

Housing rent stabilization Cleared 3/31/2021 ISMAEL HERNANDEZ

Contact Information

Contractor Weinstein Construction Corporation; Lic. No.: 630439-B 15102 RAYMER STREET      VAN NUYS, CA 91405
Engineer Alexander,, Andy Joseph; Lic. No.: C84086 1730 E HOLLY AVE STE 107      EL SEGUNDO, CA 90245

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/10/2021 Not Ready for Inspection JOE VELASQUEZ
Deputy Drilled-In Anchors 6/11/2021 No Access for Inspection JOE VELASQUEZ
Deputy Steel/Welding 6/11/2021 No Access for Inspection JOE VELASQUEZ
Excavation/Setback/Form/Re-Bar 6/15/2021 Approved JOE VELASQUEZ
Structural Steel Frame 6/15/2021 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 6/15/2021 Not Ready for Inspection JOE VELASQUEZ
Insulation 6/18/2021 Not Ready for Inspection JOE VELASQUEZ
Structural Steel Frame 6/18/2021 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 6/18/2021 Not Ready for Inspection JOE VELASQUEZ
Insulation 6/22/2021 Approved JOE VELASQUEZ
Structural Steel Frame 6/22/2021 Approved JOE VELASQUEZ
Wood Frame 6/22/2021 Approved JOE VELASQUEZ
Interior/Exterior Lathing 7/6/2021 Approved KENNETH ROBERTS
Final 7/19/2021 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 7/19/2021 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 7/19/2021 Not Ready for Inspection JOE VELASQUEZ
Final 8/20/2021 Partial Inspection KENNETH ROBERTS
SGSOV-Seismic Gas S/O Valve 8/20/2021 SGSOV Approved KENNETH ROBERTS
Smoke Detectors 8/20/2021 Not Ready for Inspection KENNETH ROBERTS
Final 10/21/2021 OK for CofC JEFFREY DURAN
Smoke Detectors 10/21/2021 Approved JEFFREY DURAN